Structural integrity reserve studies (SIRS) in Tampa
Get your SIRS scheduled before the 31 December 2026 outside date.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate structural integrity reserve studies for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo associations in Tampa need a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher, and no SIRS may be completed after 31 December 2026. Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after. Tampa's page shows a 30-year trigger and no 25-year coastal rule, even for bayfront buildings.
Last updated
The numbers that drive a SIRS
Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.
Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.
Local rules that shape a SIRS in Tampa

- The city's program page shows the 30-year trigger only and no 25-year rule for buildings near salt water, so bayfront towers on Bayshore and Harbour Island follow the same 30-year clock as inland buildings unless the city notifies otherwise.
- Phase I must be completed within 180 days after the owners receive the city's written notice under s. 5-110.9.8.
- If Phase I finds substantial structural deterioration, the Phase II report is due to the city within 180 days after the Phase I report is submitted.
- Reports are filed in Accela Citizen Access, where a registered user applies for an RCT record, and each report must be performed, signed and sealed by a Florida design professional.
- Buildings that should be in the program but have not received a notice are asked to contact CSDLSP@tampagov.net or 813-307-3980, and the city posts its Milestone Inspection Notification Letter.
- The city's page sets inspection deadlines but no repair deadline of its own, so the state rule applies, under which repairs for substantial structural deterioration must start within 365 days of the Phase II report.
- Tampa's program page describes a structural inspection only. It lists no electrical report, thermography, parking lot certificate or balcony form.
How we handle structural integrity reserve studies in Tampa
Under Tampa's 30-year trigger with no coastal exception, a bayfront condo can reach its first milestone inspection five years later than a similar building under a 25-year program. For the SIRS that cuts both ways. A recent milestone can replace the study's visual portion, but where none exists we arrange the full visual inspection for the reserve study rather than wait.[1][3]

Permits for structural integrity reserve studies (sirs) in Tampa
- City of Tampa Construction Services: Milestone notices, RCT filings in Accela and repair permits
What does a SIRS cover?
At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[3]

Who may perform or verify the study?
An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[3][4]
What are the deadlines?

- Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
- With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
- After that, at least every 10 years.
- Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
How does the SIRS change the budget?
Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[3]

| Topic | Rule in Tampa | Source |
|---|---|---|
| First inspection | Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after. | City of Tampa |
| Contact | Tampa Construction Services takes milestone questions at (813) 274-3100, option 1. | City of Tampa |
| Coastal rule | Tampa's page shows a 30-year trigger and no 25-year coastal rule, even for bayfront buildings. | City of Tampa |
Structural integrity reserve studies (SIRS) services in Tampa
SIRS study in Tampa
The full study for a building that has never had one, or whose last one is 10 years old.
SIRS update in Tampa
The update the law requires when your funding changes, or before a budget that departs from the last study.
SIRS with a milestone inspection in Tampa
Doing both together, reusing a recent milestone inspection and the combined 31 Dec 2026 outside date.
Frequently asked questions
How does the Tampa inspection schedule affect our SIRS?
Tampa runs milestone inspections under City Code s. 5-110.9, Mandatory Structural Inspections for Condominium and Cooperative Buildings, for association buildings three stories or more. The first inspection is due at 30 years from the certificate of occupancy and then every 10 years. A milestone inspection completed within the previous five years may replace the visual inspection portion of the SIRS.
Does Tampa use the 25-year coastal rule?
The city's page shows a 30-year trigger and no 25-year coastal rule.
How do we file a milestone report in Tampa?
Through Accela Citizen Access, where a registered user applies for an RCT record. The report is performed, signed and sealed by a Florida design professional.
Sources
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
- Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
- Reserve threshold, Florida DBPR. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.