Structural integrity reserve studies (SIRS) in Boca Raton
Get your SIRS scheduled before the 31 December 2026 outside date.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate structural integrity reserve studies for condo and co-op associations in Boca Raton, working to the rules of the City of Boca Raton Building Recertification Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo associations in Boca Raton need a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher, and no SIRS may be completed after 31 December 2026. Boca recertifies at 30 years, or 25 within three miles of the coast, with threshold buildings at 30. Boca's guidelines add a specific inspection of underground and lower-level garages.
Last updated
The numbers that drive a SIRS
Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.
Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.
Local rules that shape a SIRS in Boca Raton

- Covered buildings recertify at 30 years, or at 25 years for condo and co-op properties within three miles of a coastline as defined in s. 376.031; threshold buildings recertify at 30 years.
- The guidelines single out underground and lower-level garages, citing low ground elevation, a shallow and rising water table, porous ground and a corrosive coastal environment, and add an inspection of how the garage has been maintained.
- Palm Beach County, home to Boca Raton, was one of the three counties with the most required Phase 2 inspections in 2024.
- The city publishes a revised backlog schedule and a Building Recertification Schedule for 2027 to 2031, which it says may be amended.
- OPPAGA reported that some Palm Beach County jurisdictions accept a single combined Phase 1 and Phase 2 inspection.
- Boca Raton's guidelines say its recertification combines Phase 1 and Phase 2 of the state milestone inspection into one inspection that meets and exceeds s. 553.899 and Chapter 18 of the Florida Building Code, Existing Building.
- The city notifies each owner at least 365 days before the building's recertification deadline with a Notice of Required Inspection by certified mail, and posts it at the building if the letter comes back unclaimed.
- The report combines a Structural Report and an Electrical Report on the city's own forms, with a narrative and color photos. The engineers tell the Building Official three business days before each inspection so city inspectors can attend, and any draft given to the owner goes to the city at the same time.
How we handle structural integrity reserve studies in Boca Raton
Boca Raton's checklists ask for separate structural and electrical safety reports, and both systems are SIRS items. When the recertification falls inside the five years before the SIRS, we give the reserve professional both reports and the photos filed with the city, which keeps the study tied to the building's real condition.[1][5]

Permits for structural integrity reserve studies (sirs) in Boca Raton
- City of Boca Raton Building Division: Building Recertification Inspection Program notices, schedule and filings
What does a SIRS cover?
At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[5]

Who may perform or verify the study?
An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[5][6]
What are the deadlines?

- Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
- With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
- After that, at least every 10 years.
- Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
How does the SIRS change the budget?
Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[5]

| Topic | Rule in Boca Raton | Source |
|---|---|---|
| Local program | Boca Raton's recertification program dates from Ordinance 5589 of 24 August 2021, before the state law. | City of Boca Raton |
| Buildings covered | Boca counts uninhabitable stories such as underground parking when deciding whether a building is covered. | City of Boca Raton |
| Electrical | The city uses separate electrical and structural safety report checklists. | City of Boca Raton |
| Filing | Recertification is filed online or by mail to the Building Recertification Department. | City of Boca Raton |
| Repairs | Boca gives 365 days from its sufficiency determination to start repairs under an active permit. | Boca Raton guidelines |
| Report deadline | An insufficient report can be corrected within 30 days, up to three times. | Boca Raton guidelines |
Structural integrity reserve studies (SIRS) services in Boca Raton
SIRS study in Boca Raton
The full study for a building that has never had one, or whose last one is 10 years old.
SIRS update in Boca Raton
The update the law requires when your funding changes, or before a budget that departs from the last study.
Reserve funding plan in Boca Raton
Turning the SIRS into a budget, with the baseline plan, loans, lines of credit, pooling and the post-milestone pause.
SIRS with a milestone inspection in Boca Raton
Doing both together, reusing a recent milestone inspection and the combined 31 Dec 2026 outside date.
Frequently asked questions
How does the Boca Raton inspection schedule affect our SIRS?
Covered buildings recertify at 30 years, or at 25 years for condo and co-op properties within three miles of a coastline as defined in s. 376.031; threshold buildings recertify at 30 years. A milestone inspection completed within the previous five years may replace the visual inspection portion of the SIRS.
Is Boca Raton on a 25 or 30-year schedule?
Condo and co-op properties within three miles of a coastline recertify at 25 years, others at 30, and threshold buildings at 30.
Where can we see when our Boca Raton building is due?
The city publishes a recertification schedule for 2027 to 2031 and a revised backlog schedule on its program page.
Sources
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
- Recertification Guidelines, Building Recertification Inspection Program, City of Boca Raton. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
- Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
- Reserve threshold, Florida DBPR. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.