Structural integrity reserve studies (SIRS) in Miami
Get your SIRS scheduled before the 31 December 2026 outside date.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate structural integrity reserve studies for condo and co-op associations in Miami, working to the rules of the City of Miami Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo associations in Miami need a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher, and no SIRS may be completed after 31 December 2026. Overdue buildings built from 1982 to 1984 cannot use the city's online filing route. Under the county schedule the city applies, coastal condos built from 1998 are due at 25 years and most other buildings from 1993 at 30.
Last updated
The numbers that drive a SIRS
Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.
Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.
Local rules that shape a SIRS in Miami

- Buildings built in 1982, 1983 or 1984 that show as overdue cannot use the city's online process and have to contact the recertification team directly.
- Because the city applies Miami-Dade's Code s. 8-11(f), the county's age rules decide the due year. Coastal condo and co-op buildings built from 1998 within three miles of the coast come due at 25 years, and most other buildings built from 1993 at 30.
- Across Miami-Dade, building officials counted 308 required Phase 2 milestone inspections in 2025.
- In 2025 Miami-Dade accounted for 23 of the 24 buildings in Florida found unsafe or uninhabitable after milestone inspections.
- Owners facing a special assessment can ask Miami-Dade County about its Condominium Special Assessment Loan Program, which has offered eligible households up to $50,000 at zero percent; the county page does not say whether a round is open.
- Once a report is filed, the owner has 60 days to obtain the repair permits it calls for without a violation being issued.
- The city's filing set includes structural, electrical and thermography reports, plus a parking lot illumination certificate where the building has a parking lot.
- The city says to expect a response in about six weeks, and takes questions at buildingrecertifications@miamigov.com or (305) 416-1177.
How we handle structural integrity reserve studies in Miami
For associations from Brickell to Edgewater, the city's filings feed the reserve study. The RC-S and RC-E reports, the thermography and any permits pulled in the 60-day window tell the reserve professional what has been fixed and what is still coming. With the city quoting about six weeks for a response, we start the SIRS work without waiting for it.[1]

Permits for structural integrity reserve studies (sirs) in Miami
- City of Miami Building Department, Unsafe Structures Services: Recertification and milestone filings, extensions and repair permits inside city limits
What does a SIRS cover?
At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[5]

Who may perform or verify the study?
An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[5][6]
What are the deadlines?

- Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
- With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
- After that, at least every 10 years.
- Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
How does the SIRS change the budget?
Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[5]

| Topic | Rule in Miami | Source |
|---|---|---|
| Filing | City of Miami reports go in through iBuild and ProjectDox under set file names such as RC-S and RC-E. | City of Miami |
| Electrical | Electrical systems rated 400 amperes or more get an infrared thermography survey under the county guidelines. | Miami-Dade County |
| Structures covered | Guardrails are required where a lot borders a canal, lake or other water, under County Code s. 8C-6. | Miami-Dade County |
| Extensions | The city grants a single $500 extension, and only when it is requested before the due date. | City of Miami |
Structural integrity reserve studies (SIRS) services in Miami
SIRS study in Miami
The full study for a building that has never had one, or whose last one is 10 years old.
SIRS update in Miami
The update the law requires when your funding changes, or before a budget that departs from the last study.
Reserve funding plan in Miami
Turning the SIRS into a budget, with the baseline plan, loans, lines of credit, pooling and the post-milestone pause.
SIRS with a milestone inspection in Miami
Doing both together, reusing a recent milestone inspection and the combined 31 Dec 2026 outside date.
Frequently asked questions
How does the Miami inspection schedule affect our SIRS?
Buildings built in 1982, 1983 or 1984 that show as overdue cannot use the city's online process and have to contact the recertification team directly. A milestone inspection completed within the previous five years may replace the visual inspection portion of the SIRS.
Our building was built in 1983 and shows as overdue. What now?
The city says overdue buildings built in 1982, 1983 or 1984 cannot use the online process. Contact the recertification team and get the inspection under contract straight away.
How common is Phase 2 in Miami-Dade?
Miami-Dade building officials counted 308 required Phase 2 milestone inspections in 2025, and the county had 23 of the 24 unsafe or uninhabitable findings statewide that year.
Sources
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Condominium Special Assessment Program Relaunched, Miami-Dade County Housing and Community Development. Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
- Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
- Reserve threshold, Florida DBPR. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.