Condo Safety Florida

Structural integrity reserve studies (SIRS) in Miami Beach

Get your SIRS scheduled before the 31 December 2026 outside date.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate structural integrity reserve studies for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Condo associations in Miami Beach need a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher, and no SIRS may be completed after 31 December 2026. Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. The county code sets 25 years for coastal condo buildings built from 1998, which the city's own page does not repeat, so check your notice.

Last updated

The numbers that drive a SIRS

Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.

Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.

Local rules that shape a SIRS in Miami Beach

Mid-century and modern oceanfront condominium buildings behind sea oats on Miami Beach
  • The county code behind the city program puts coastal condo and co-op buildings three stories or more, built from 1998 within three miles of the coast, on a 25-year first recertification. Miami Beach sits on barrier islands between the Atlantic and Biscayne Bay, so confirm on your notice which date the city applied.
  • Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 milestone inspections in 2025.
  • The city's recertification page points condo owners facing special assessments to an assistance program.
  • Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
  • Reports go to the building department through the city's Citizen Self Service portal or by email.
  • After permitted repairs pass final inspection, the owner submits an updated report from a Florida-licensed design professional stating the building is structurally and electrically safe, and the Building Official then issues the recertification approval letter.
  • The same page refers owners to a mandatory annual maintenance log, a record that is useful evidence when the reserve study is updated.
  • The county guidelines that sit behind the city program require infrared thermography on electrical systems of 400 amperes or more, with photos in the electrical report.
[2][1][3]

How we handle structural integrity reserve studies in Miami Beach

Oceanfront and bayfront associations in Miami Beach can build the SIRS on records the city already expects them to keep. The annual maintenance log, the structural and electrical recertification reports and any updated report after repairs give the reserve professional a history of the building, which makes the useful life estimates firmer.[1][4]

Flat roof of a high-rise condominium with membrane roofing, parapets, mechanical units and an elevator machine room

Permits for structural integrity reserve studies (sirs) in Miami Beach

What does a SIRS cover?

At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[4]

Aerial view of a coastal condominium showing its roof equipment, balconies, pool deck and parking garage

Who may perform or verify the study?

An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[4][5]

What are the deadlines?

Moisture meter, tablet and tape measure on a condominium roof membrane during a reserve study visual inspection
  • Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
  • With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
  • After that, at least every 10 years.
  • Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
[4]

How does the SIRS change the budget?

Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[4]

Condominium meeting room table with closed binders, a calculator, pens and rolled building drawings
Structural integrity reserve studies in Miami Beach: the local rules at a glance
TopicRule in Miami BeachSource
First inspectionMiami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code.City of Miami Beach
Structures coveredLots that abut a canal, lake or other water need guardrails under County Code s. 8C-6.Miami-Dade County
First inspectionThe county code sets 25 years for coastal condo buildings built from 1998, which the city's own page does not repeat, so check your notice.Miami-Dade County
From the official pages, read 28 October 2026. Confirm dates with the City of Miami Beach Building Department. Sources: City of Miami Beach, Building Recertification, City of Miami Beach; Miami-Dade County, Recertification (Miami-Dade County Building). Last updated October 28, 2026.

Frequently asked questions

How does the Miami Beach inspection schedule affect our SIRS?

Miami Beach recertifies buildings 30 years after the original certificate of occupancy and every 10 years after that, under Miami-Dade Code s. 8-11(f). The city notes the program used to be called the 40-year recertification. A milestone inspection completed within the previous five years may replace the visual inspection portion of the SIRS.

Is Miami Beach on a 25 or 30-year schedule?

The city page states 30 years. The county code it applies sets 25 years for coastal condo and co-op buildings built from 1998, so the date on your notice is the one to follow.

Is there help with special assessments in Miami Beach?

The city's recertification page links an assistance program for condo owners facing special assessments.

Sources

  1. Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
  2. Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
  3. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  4. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  5. Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
  6. Reserve threshold, Florida DBPR. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.