Structural integrity reserve studies (SIRS) in Hollywood
Get your SIRS scheduled before the 31 December 2026 outside date.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate structural integrity reserve studies for condo and co-op associations in Hollywood, working to the rules of the City of Hollywood Building Division from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo associations in Hollywood need a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher, and no SIRS may be completed after 31 December 2026. Hollywood inspects buildings at 25 years and every 10 years after, under its 25-Year or Older Building Safety Program. Broward County reported 155 required Phase 2 inspections in 2025.
Last updated
The numbers that drive a SIRS
Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.
Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.
Local rules that shape a SIRS in Hollywood

- Broward County, which includes Hollywood, reported 155 required Phase 2 milestone inspections in 2025.
- The city issues a Notice of Required Inspection, and its page gives the owner 90 days from receiving it to complete the inspection, shorter than the 180 days in BORA's policy text, so work to the date on your notice.
- BORA Policy 05-05, which Hollywood's program follows, counts the Broward safety inspection as compliance with both phases of the state milestone inspection.
- Where the report finds conditions that threaten life, health or safety, the owner has 180 days from the report date to obtain the required permits.
- Broward's program began as a 40-year program, created in 2005 and in effect from January 2006, and calls for structural and electrical safety inspections.
- After the Surfside collapse the city re-issued certified letters to the properties on its list, set up a Recertification Taskforce and assigned dedicated staff.
- Under the BORA policy, balconies, elevated decks and seawalls or docks attached to a structure are part of the inspection, and parking garages and guardrails are not exempt.
- The BORA policy has the electrical safety report prepared by a Florida-licensed professional specializing in electrical design, on the BORA electrical form.
How we handle structural integrity reserve studies in Hollywood
Because the Broward inspection covers electrical systems as well as structure, a recent Hollywood report already speaks to two of the items a SIRS must cover. We send the reserve professional the latest structural and electrical reports and any permits pulled for repairs so the study prices what the engineers found.[1][4]

Permits for structural integrity reserve studies (sirs) in Hollywood
- City of Hollywood Building Safety Program: 25-Year or Older Building Safety Program notices and filings in Hollywood
What does a SIRS cover?
At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[4]

Who may perform or verify the study?
An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[4][6]
What are the deadlines?

- Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
- With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
- After that, at least every 10 years.
- Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
How does the SIRS change the budget?
Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[4]

| Topic | Rule in Hollywood | Source |
|---|---|---|
| First inspection | Hollywood inspects buildings at 25 years and every 10 years after, under its 25-Year or Older Building Safety Program. | City of Hollywood |
| Fees | Hollywood charges a $300 administrative fee to review the reports. | City of Hollywood |
| State data | Broward County reported 155 required Phase 2 inspections in 2025. | OPPAGA 26-04 |
Structural integrity reserve studies (SIRS) services in Hollywood
SIRS study in Hollywood
The full study for a building that has never had one, or whose last one is 10 years old.
SIRS update in Hollywood
The update the law requires when your funding changes, or before a budget that departs from the last study.
Reserve funding plan in Hollywood
Turning the SIRS into a budget, with the baseline plan, loans, lines of credit, pooling and the post-milestone pause.
SIRS with a milestone inspection in Hollywood
Doing both together, reusing a recent milestone inspection and the combined 31 Dec 2026 outside date.
Frequently asked questions
How does the Hollywood inspection schedule affect our SIRS?
Hollywood runs the 25-Year or Older Building Safety Program under Broward County's administrative provisions and BORA guidelines. Buildings are inspected at 25 years and at 10-year intervals after that, whether they face the beach or sit inland. A milestone inspection completed within the previous five years may replace the visual inspection portion of the SIRS.
Is it 25 or 40 years in Hollywood?
The program started as Broward's 40-year program in 2005. The city now titles it the 25-Year or Older Building Safety Program and inspects buildings at 25 years and every 10 years after.
How long do we have after a Hollywood notice?
The city's page gives 90 days from receiving the Notice of Required Inspection to complete the inspection. Follow the date on your notice.
Sources
- Building Safety Inspection Program, City of Hollywood, City of Hollywood. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
- Reserve threshold, Florida DBPR. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.