Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate structural integrity reserve studies for condo and co-op associations in Palm Beach County, working to the rules of the Palm Beach County Building Division from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Condo associations in Palm Beach County need a structural integrity reserve study at least every 10 years for buildings three habitable stories or higher, and no SIRS may be completed after 31 December 2026. Unincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30. Palm Beach County buildings that reached the trigger age before 1 July 2022 were due by 31 December 2024.

Last updated

The numbers that drive a SIRS

Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.

Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.

Local rules that shape a SIRS in Palm Beach County

Condominium towers on the Intracoastal Waterway in Palm Beach County behind a marina and a drawbridge
  • Buildings that reached 25 or 30 years before 1 July 2022 were due by 31 December 2024, and those reaching that age between 1 July 2022 and 31 December 2024 were due by 31 December 2025. Later buildings are due by 31 December of the year they reach the trigger age.
  • Palm Beach was one of the three counties, with Broward and Miami-Dade, that reported the most required Phase 2 inspections in 2024.
  • In the state's 2025 data, 17 of the 39 Palm Beach municipal building officials did not report milestone figures, the largest gap of the three South Florida counties.
  • The county sends certified letters to associations in the year the inspection is due, and the inspection must be completed within 180 days of receiving the letter unless a fixed legacy deadline applies.
  • After repairs, the original inspector returns for a Phase One Amended report on the areas noted in the first report, filed on the same EB18-2024 form.
  • The county page covers unincorporated Palm Beach County only. Cities with their own building departments, such as Boca Raton, apply their own rules.
  • OPPAGA found that some jurisdictions in Palm Beach County accept one combined Phase 1 and Phase 2 inspection.
  • Phase 1, Phase 2 and Phase One Amended reports all use Form EB18-2024 and are uploaded through the county's Milestone Inspection Form Submission portal with the building's Reference ID, one building and one report type at a time, and only by the architect or engineer who prepared the report.
[1][2][3]

How we handle structural integrity reserve studies in Palm Beach County

For associations along the Intracoastal and the beaches of unincorporated Palm Beach County, the county's three-mile line can bring the milestone inspection five years earlier than inland. That earlier inspection can feed the SIRS, because a milestone inspection completed within the previous five years may replace the visual inspection portion of the study.[1][4]

Flat roof of a high-rise condominium with membrane roofing, parapets, mechanical units and an elevator machine room

Permits for structural integrity reserve studies (sirs) in Palm Beach County

What does a SIRS cover?

At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[4]

Aerial view of a coastal condominium showing its roof equipment, balconies, pool deck and parking garage

Who may perform or verify the study?

An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[4][5]

What are the deadlines?

Moisture meter, tablet and tape measure on a condominium roof membrane during a reserve study visual inspection
  • Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
  • With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
  • After that, at least every 10 years.
  • Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
[4]

How does the SIRS change the budget?

Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[4]

Condominium meeting room table with closed binders, a calculator, pens and rolled building drawings
Structural integrity reserve studies in Palm Beach County: the local rules at a glance
TopicRule in Palm Beach CountySource
First inspectionUnincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30.Palm Beach County
RepairsRepairs must start within 365 days of the county receiving the Phase 2 report.Palm Beach County
ElectricalThe county's milestone page lists no electrical report or parking lot certificate.Palm Beach County
ContactThe county answers milestone questions at 561-233-5020.Palm Beach County
From the official pages, read 28 October 2026. Confirm dates with the Palm Beach County Building Division. Source: Palm Beach County, Mandatory Milestone Inspections, Palm Beach County Building Division. Last updated October 28, 2026.

Frequently asked questions

How does the Palm Beach County inspection schedule affect our SIRS?

In unincorporated Palm Beach County, condo and co-op buildings three stories or more that sit within three miles of a coastline get their first milestone inspection at 25 years; buildings farther inland wait until 30. Every building then repeats every 10 years. A milestone inspection completed within the previous five years may replace the visual inspection portion of the SIRS.

Does the county rule apply in West Palm Beach or Boca Raton?

The county page covers unincorporated Palm Beach County. Cities with their own building departments apply their own rules, so check your city.

When does the 180 days start in Palm Beach County?

From the county's certified letter, which goes out in the year the inspection is due, unless a fixed legacy deadline applies to your building.

Sources

  1. Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
  2. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  3. Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
  4. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  5. Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
  6. Reserve threshold, Florida DBPR. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.