Structural integrity reserve studies for Florida condos

Get your SIRS scheduled before the 31 December 2026 outside date.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange your structural integrity reserve study with a Florida-licensed engineer or architect or a qualified reserve professional, line it up with any milestone inspection, and help the board turn the funding plan into a budget owners can live with.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

A structural integrity reserve study (SIRS) is required at least every 10 years for each residential condominium building three habitable stories or higher in Florida. It is based on a visual inspection, covers eight required items from the roof to windows, and must be performed or verified by a Florida-licensed engineer or architect or a credentialed reserve specialist or professional reserve analyst. Associations existing on or before 1 July 2022 were due by 31 December 2025, and no SIRS may be completed after 31 December 2026 (s. 718.112(2)(g), Florida Statutes).

Last updated

Who needs a SIRS

Every residential condominium association with a building three habitable stories or higher, measured as the Florida Building Code measures it. Board members, treasurers and property managers use the study to set reserves and the annual budget.

  • Owner-controlled associations that existed on or before 1 July 2022 and have not yet completed a study
  • Associations that completed a milestone inspection and need the SIRS that follows it
  • Associations changing how they fund reserves, for example with a loan or line of credit, which triggers an update
  • Developers preparing to turn over control of a new building

The numbers that drive a SIRS

Eight required items, plus any other item whose deferred maintenance or replacement cost is above $25,000, or the Division's inflation-adjusted figure of $25,675 for 2026.

Items with a remaining useful life over 25 years do not need replacement reserves, though the study may still set a deferred maintenance amount.

What does a SIRS cover?

At a minimum the roof; the structure, including load-bearing walls and primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item above the reserve threshold whose failure would harm those items. For each item the study gives the estimated remaining useful life and the replacement cost or deferred maintenance expense, and it includes at least a baseline funding plan that keeps the reserve cash balance above zero in every budget year.[1]

Aerial view of a coastal condominium showing its roof equipment, balconies, pool deck and parking garage

Who may perform or verify the study?

An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. The rule covers the visual inspection portion too. We arrange the study with one of these professionals and coordinate the schedule; the professional signs the study.[1][2]

What are the deadlines?

Moisture meter, tablet and tape measure on a condominium roof membrane during a reserve study visual inspection
  • Owner-controlled associations existing on or before 1 July 2022 had to complete a SIRS by 31 December 2025.
  • With a milestone inspection due on or before 31 December 2026, the SIRS may be done at the same time, but no SIRS may be completed after 31 December 2026.
  • After that, at least every 10 years.
  • Within 45 days of receiving the study, owners get a copy or notice and the association files a statement with the Division.
[1]

How does the SIRS change the budget?

Reserves for the SIRS items must be based on the most recent study, and for budgets adopted on or after 31 December 2024 an owner-controlled association that must have a SIRS cannot vote to waive or reduce those reserves, except a multicondominium with a Division-approved alternative funding method. SIRS items may be funded by regular assessments, special assessments, lines of credit or loans; the last three need a majority of the total voting interests.[1]

Condominium meeting room table with closed binders, a calculator, pens and rolled building drawings
SIRS rules that set the cost to owners
ItemRule or figureSource
Reserve threshold for other items$25,675 in 2026 ($25,000 in 2025)DBPR
Study feeNo state fee schedule; depends on buildings, stories, systems and any recent milestone inspections. 718.112(2)(g)
Waiving SIRS reservesNot allowed for budgets adopted on or after 31 Dec 2024s. 718.112(2)(f)2.b
Vote for a special assessment, loan or line of creditMajority of the total voting interestss. 718.112(2)(f)2.c
We do not publish a study fee range because we have not found a reliable published survey. You get a written proposal before any work. Sources: The Florida Senate, s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections; Florida DBPR, Reserve threshold. Last updated October 28, 2026.

Frequently asked questions

Is a SIRS the same as an ordinary reserve study?

It is a specific kind of reserve study set by Florida law. The Division describes it as a reserve study used to make sure owners are reserving for future major repair and replacement of structural elements, with eight required items and a visual inspection by a qualified professional.

Can a milestone inspection replace part of the SIRS?

Yes. A milestone inspection, or an inspection for a similar local requirement, performed within the past 5 years that meets the SIRS rules may be used in place of the visual inspection portion of the study.

Do we need a SIRS if our building is two stories?

The SIRS duty applies to each building three habitable stories or higher. Lower buildings still need ordinary reserves for roof replacement, painting, pavement and any item above the reserve threshold.

When must a SIRS be updated?

When the funding method changes. If a study was done before the association adopted a special assessment, loan or line of credit, it must be updated to reflect it, and an updated SIRS is required before adopting a budget that does not align with the latest funding plan.

Does the board have to sign anything?

Yes. An officer or director must sign an affidavit acknowledging receipt of the completed study. Officers or directors who willfully and knowingly fail to complete a SIRS breach their fiduciary duty to the owners.

Sources

  1. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  2. Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
  3. Reserve threshold, Florida DBPR. Accessed October 28, 2026.
  4. Chapter 2025-175, Laws of Florida (CS/CS/HB 913), approved June 23 2025, Laws of Florida. Accessed October 27, 2026.