Building recertification and milestone inspections in Miami Beach
Threshold building rules and city forms, handled for your board.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange recertification and milestone inspections for oceanfront and bayfront condo buildings in Miami Beach with the engineers the city requires.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
The City of Miami Beach recertifies buildings at 30 years and every 10 years after, under Miami-Dade Code s. 8-11(f). Threshold buildings, over 3 stories or 50 feet or large assembly buildings, need structural certification from a Florida-licensed structural engineer and electrical certification from an electrical engineer, and the city has separate parking lot guardrail and illumination forms (City of Miami Beach recertification page).
Last updated
Who issues permits in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
What Miami Beach asks for
- Threshold buildings need a Florida-licensed structural engineer and an electrical engineer; other buildings may use an architect or engineer.
- Separate forms for parking lot guardrails and parking lot illumination.
- Submission through the city's Citizen Self Service portal or by email.
- The city refers to a mandatory annual maintenance log.
Services in Miami Beach
Building recertification (40-year) in Miami Beach
Miami-Dade and Broward's own building safety recertification programs, which run alongside the state milestone law and cover more buildings.
Condo concrete restoration in Miami Beach
Balcony, slab, garage and facade repairs after a milestone or recertification report, designed by the engineer of record and built by a qualified contractor.
Milestone inspections in Miami Beach
The structural inspection Florida condo and co-op buildings need at 30 years (25 near salt water where the building department says so) and every 10 years after.
Structural integrity reserve studies (SIRS) in Miami Beach
The 10-year study of roof, structure, fire protection, plumbing, electrical, waterproofing and windows that sets your reserves. No SIRS may be completed after 31 Dec 2026.
Frequently asked questions
Is a structural engineer required in Miami Beach?
For threshold buildings, yes, plus an electrical engineer. Non-threshold buildings may use an architect or engineer.
Do we need the guardrail form if we have no parking lot?
The guardrail and illumination forms relate to parking lots. The professional preparing your recertification will confirm which forms apply.
Sources
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
