Condo concrete restoration in Miami Beach
Balcony, garage and facade repairs, planned around your milestone report.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate concrete restoration for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Concrete restoration in Miami Beach follows the findings of the local inspection, and we line up the repair scope, permits and contractor once the engineer's report is in. After repairs pass final inspection, an updated report goes in before the city issues its approval letter. The county code sets 25 years for coastal condo buildings built from 1998, which the city's own page does not repeat, so check your notice.
Last updated
How big restoration projects get
In 2024, 56 of the 671 Phase 2 repair permits reported to the state were valued at over $1 million, and 215 were between $1,001 and $25,000. In 2025, 30 of 232 permits were over $1 million.
Repair rules in Miami Beach

- After permitted repairs pass final inspection, the owner submits an updated report from a Florida-licensed design professional stating the building is structurally and electrically safe, and the Building Official then issues the recertification approval letter.
- The county code behind the city program puts coastal condo and co-op buildings three stories or more, built from 1998 within three miles of the coast, on a 25-year first recertification. Miami Beach sits on barrier islands between the Atlantic and Biscayne Bay, so confirm on your notice which date the city applied.
- Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 milestone inspections in 2025.
- The same page refers owners to a mandatory annual maintenance log, a record that is useful evidence when the reserve study is updated.
- Under County Code s. 8C-6, a parking lot that abuts a canal, lake or other water needs compliant guardrails, and a missing guardrail needs a permit before recertification closes.
- The city's recertification page points condo owners facing special assessments to an assistance program.
How we handle concrete restoration in Miami Beach
In Miami Beach a repair project is not finished when the contractor leaves. Once the permitted work passes final inspection, the owner files an updated report from a Florida-licensed design professional before the city issues its approval letter, so we plan the repair contract and the engineer's follow-up visit as one schedule.[1]

Permits for condo concrete restoration in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
How does a restoration project run?

- The engineer's report identifies the deterioration and recommended repairs.
- A Florida-licensed engineer prepares repair drawings and specifications, often the engineer who did the inspection.
- Qualified restoration contractors bid on the same scope, each disclosing any interest in the inspection firm as the statute requires.
- The contractor obtains permits from the local building department.
- Repairs proceed in phases, usually stack by stack, with shoring where the engineer requires it.
- The engineer observes the work, and the building department inspects and closes the permits.
What deadlines apply to repairs?
The state sets the outer limit of 365 days from the Phase 2 report for repairs to commence, and each county or city must adopt its own repair ordinance. Fort Lauderdale's program allows 180 days from the safety report unless the Building Official sets otherwise, and the City of Miami gives 60 days after filing a recertification report to obtain repair permits without a violation.[4][5][6]

Who may bid on the repairs?
Any design professional or contractor licensed under chapter 489 who bids on repairs recommended by a milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless it is disclosed to the association in writing. Without the disclosure, the contract is voidable.[4]
| Topic | Rule in Miami Beach | Source |
|---|---|---|
| First inspection | Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. | City of Miami Beach |
| Filing | Reports are filed through the city's Citizen Self Service portal or by email. | City of Miami Beach |
| Repairs | After repairs pass final inspection, an updated report goes in before the city issues its approval letter. | City of Miami Beach |
Condo concrete restoration services in Miami Beach
Balcony restoration in Miami Beach
Slab edge and soffit repairs, coatings and railing work on condo balconies, stack by stack.
Concrete spalling repair in Miami Beach
Repairing concrete that has cracked and broken away over corroding reinforcing steel.
Post-tensioned slab repair in Miami Beach
Repairs to slabs reinforced with tensioned steel tendons, which need specialist assessment before anyone cuts concrete.
Parking garage restoration in Miami Beach
Columns, beams and decks in condo garages, which take the worst of water, salt and car traffic.
Waterproofing and sealants in Miami Beach
Coatings, sealants and membranes that keep water out of the structure, and a required SIRS item.
Balcony railing replacement in Miami Beach
Replacing corroded or loose railings, often with the balcony slab repairs around their posts.
Frequently asked questions
How long do we have to make repairs in Miami Beach?
After permitted repairs pass final inspection, the owner submits an updated report from a Florida-licensed design professional stating the building is structurally and electrically safe, and the Building Official then issues the recertification approval letter. Concrete is among the most common Phase 2 repairs Florida building officials report.
What happens after repairs in Miami Beach?
Once the permitted repairs pass final inspection, the owner submits an updated report stating the building is structurally and electrically safe, and the Building Official issues an approval letter.
Is Miami Beach on a 25 or 30-year schedule?
The city page states 30 years. The county code it applies sets 25 years for coastal condo and co-op buildings built from 1998, so the date on your notice is the one to follow.
What is the Miami Beach maintenance log?
The city's recertification page refers owners to a mandatory annual maintenance log. Keep it with the inspection reports; it also helps when the reserve study is updated.
Sources
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.