Condo concrete restoration in Palm Beach County
Balcony, garage and facade repairs, planned around your milestone report.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate concrete restoration for condo and co-op associations in Palm Beach County, working to the rules of the Palm Beach County Building Division from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Concrete restoration in Palm Beach County follows the findings of the local inspection, and we line up the repair scope, permits and contractor once the engineer's report is in. After repairs the original inspector files a Phase One Amended report on Form EB18-2024. Repairs must start within 365 days of the county receiving the Phase 2 report.
Last updated
How big restoration projects get
In 2024, 56 of the 671 Phase 2 repair permits reported to the state were valued at over $1 million, and 215 were between $1,001 and $25,000. In 2025, 30 of 232 permits were over $1 million.
Repair rules in Palm Beach County

- After repairs, the original inspector returns for a Phase One Amended report on the areas noted in the first report, filed on the same EB18-2024 form.
- Repairs must start within 365 days of the county receiving the Phase 2 report. If the owner cannot show that repairs for substantial structural deterioration have started, the structure may be deemed unsafe.
- Palm Beach was one of the three counties, with Broward and Miami-Dade, that reported the most required Phase 2 inspections in 2024.
- In the state's 2025 data, 17 of the 39 Palm Beach municipal building officials did not report milestone figures, the largest gap of the three South Florida counties.
- Buildings that reached 25 or 30 years before 1 July 2022 were due by 31 December 2024, and those reaching that age between 1 July 2022 and 31 December 2024 were due by 31 December 2025. Later buildings are due by 31 December of the year they reach the trigger age.
- A 60-day Phase 1 extension needs a written request from the architect or engineer, good cause from the owner, no evidence of unsafe conditions and a sealed statement that the building may stay occupied; a Phase 2 extension needs the request and the sealed statement.
- The county lists daily fines of up to $500 or more per day, referral to Code Compliance and a special magistrate, unsafe building cases before the Construction Board of Adjustment and Appeals, and a report to the state Division of Condominiums.
- OPPAGA found that some jurisdictions in Palm Beach County accept one combined Phase 1 and Phase 2 inspection.
How we handle concrete restoration in Palm Beach County
In unincorporated Palm Beach County the repair clock is 365 days from the county receiving the Phase 2 report, and the job is not closed until the original inspector files a Phase One Amended report. We plan the repair contract to finish in time for that return visit and keep the proof that work has started ready for the county.[1]

Permits for condo concrete restoration in Palm Beach County
- Palm Beach County Building Division: Milestone inspection notices and filings for unincorporated Palm Beach County
How does a restoration project run?

- The engineer's report identifies the deterioration and recommended repairs.
- A Florida-licensed engineer prepares repair drawings and specifications, often the engineer who did the inspection.
- Qualified restoration contractors bid on the same scope, each disclosing any interest in the inspection firm as the statute requires.
- The contractor obtains permits from the local building department.
- Repairs proceed in phases, usually stack by stack, with shoring where the engineer requires it.
- The engineer observes the work, and the building department inspects and closes the permits.
What deadlines apply to repairs?
The state sets the outer limit of 365 days from the Phase 2 report for repairs to commence, and each county or city must adopt its own repair ordinance. Fort Lauderdale's program allows 180 days from the safety report unless the Building Official sets otherwise, and the City of Miami gives 60 days after filing a recertification report to obtain repair permits without a violation.[4][5][6]

Who may bid on the repairs?
Any design professional or contractor licensed under chapter 489 who bids on repairs recommended by a milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless it is disclosed to the association in writing. Without the disclosure, the contract is voidable.[4]
| Topic | Rule in Palm Beach County | Source |
|---|---|---|
| Coastal rule | Unincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30. | Palm Beach County |
| Notice | The county's certified letter arrives in the due year, and the inspection is due within 180 days of it. | Palm Beach County |
| Filing | Reports use Form EB18-2024 and are uploaded through the county portal by the architect or engineer who prepared them. | Palm Beach County |
| Buildings covered | The county rules cover unincorporated areas; cities such as Boca Raton run their own programs. | Palm Beach County |
| Contact | The county answers milestone questions at 561-233-5020. | Palm Beach County |
Condo concrete restoration services in Palm Beach County
Balcony restoration in Palm Beach County
Slab edge and soffit repairs, coatings and railing work on condo balconies, stack by stack.
Concrete spalling repair in Palm Beach County
Repairing concrete that has cracked and broken away over corroding reinforcing steel.
Post-tensioned slab repair in Palm Beach County
Repairs to slabs reinforced with tensioned steel tendons, which need specialist assessment before anyone cuts concrete.
Parking garage restoration in Palm Beach County
Columns, beams and decks in condo garages, which take the worst of water, salt and car traffic.
Waterproofing and sealants in Palm Beach County
Coatings, sealants and membranes that keep water out of the structure, and a required SIRS item.
Balcony railing replacement in Palm Beach County
Replacing corroded or loose railings, often with the balcony slab repairs around their posts.
Frequently asked questions
How long do we have to make repairs in Palm Beach County?
Repairs must start within 365 days of the county receiving the Phase 2 report. If the owner cannot show that repairs for substantial structural deterioration have started, the structure may be deemed unsafe. Concrete is among the most common Phase 2 repairs Florida building officials report.
Can we get an extension in Palm Beach County?
Yes, 60 days, on a written request from the architect or engineer with a sealed statement that the building may stay occupied. Phase 1 extensions also need good cause and no evidence of unsafe conditions.
What are the penalties in Palm Beach County?
The county lists daily fines of up to $500 or more, referral to Code Compliance and a special magistrate, and a report to the state Division of Condominiums.
Sources
- Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.