Condo concrete restoration in Fort Lauderdale
Repairs inside Broward's 180-day window.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We line up the engineer's repair design, contractor bids and permits so Fort Lauderdale repairs start inside the program's timeframe.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Under Fort Lauderdale's Building Safety Inspection Program, repairs are due within 180 days of the safety report unless the Building Official specifies otherwise (City of Fort Lauderdale). That is tighter than the state's outer limit of 365 days for repairs to commence after a Phase 2 milestone report. Broward reported 155 required Phase 2 inspections in 2025 (OPPAGA Report 26-04).
Last updated
How big restoration projects get
In 2024, 56 of the 671 Phase 2 repair permits reported to the state were valued at over $1 million, and 215 were between $1,001 and $25,000. In 2025, 30 of 232 permits were over $1 million.
Fitting restoration into 180 days
- Ask the engineer for repair documents as soon as the safety report is drafted
- Bid the same scope to qualified restoration contractors with written disclosures
- Apply for permits straight away and agree the stack-by-stack schedule with residents
- If the work cannot finish in time, ask the Building Official early about the timeframe
Repair rules in Fort Lauderdale

- Repairs are due within 180 days of the report unless the Building Official sets another timeline, and the engineer or architect gives the owner and the city a sealed letter, valid for up to 180 days, on whether the building may stay occupied during the work.
- The Broward program expressly includes balconies, elevated decks, and docks and seawalls that are attached to or support a structure, and it states that parking garages and guardrails are not exempt.
- Broward building officials reported 155 required Phase 2 milestone inspections in 2025, while 7 of the county's 31 municipal building officials did not report that year.
- BORA Policy 05-05 treats the Broward safety inspection as compliance for both Phase 1 and Phase 2 of the state milestone inspection.
- A late report goes to a Special Magistrate or the Code Enforcement Board, and a building whose required repairs are not made can be found unsafe and sent to the Unsafe Structures Board.
- The Building Official may allow up to 60 more days to file the report, and up to 60 days to obtain repair permits on a written request with a sealed statement that the building may stay occupied.
How we handle concrete restoration in Fort Lauderdale
Fort Lauderdale gives 180 days from the report to finish repairs unless the Building Official sets another date, and keeping an active permit is the condition for any longer timeline. We line up the repair contractor early, and coordinate the engineer's occupancy letter and the amended report the city expects once the work is done.[1][4]

Permits for condo concrete restoration in Fort Lauderdale
- City of Fort Lauderdale Development Services, Permitting Services: Building Safety Inspection Program notices, report review and repair permits
How does a restoration project run?

- The engineer's report identifies the deterioration and recommended repairs.
- A Florida-licensed engineer prepares repair drawings and specifications, often the engineer who did the inspection.
- Qualified restoration contractors bid on the same scope, each disclosing any interest in the inspection firm as the statute requires.
- The contractor obtains permits from the local building department.
- Repairs proceed in phases, usually stack by stack, with shoring where the engineer requires it.
- The engineer observes the work, and the building department inspects and closes the permits.
What deadlines apply to repairs?
The state sets the outer limit of 365 days from the Phase 2 report for repairs to commence, and each county or city must adopt its own repair ordinance. Fort Lauderdale's program allows 180 days from the safety report unless the Building Official sets otherwise, and the City of Miami gives 60 days after filing a recertification report to obtain repair permits without a violation.[3][1][5]

Who may bid on the repairs?
Any design professional or contractor licensed under chapter 489 who bids on repairs recommended by a milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless it is disclosed to the association in writing. Without the disclosure, the contract is voidable.[3]
| Topic | Rule in Fort Lauderdale | Source |
|---|---|---|
| Coastal rule | Fort Lauderdale's first safety inspection comes at 25 years for every covered building, then every ten years. | City of Fort Lauderdale |
| Notice | Notices go out by certified mail between 1 June and 31 August each year. | City of Fort Lauderdale |
| Report deadline | The safety report is due within 180 days of the notice, on separate structural and electrical forms. | City of Fort Lauderdale |
| Filing | Reports are filed online in the LauderBuild Plan Room, and the review fee is $375. | City of Fort Lauderdale |
Condo concrete restoration services in Fort Lauderdale
Balcony restoration in Fort Lauderdale
Slab edge and soffit repairs, coatings and railing work on condo balconies, stack by stack.
Concrete spalling repair in Fort Lauderdale
Repairing concrete that has cracked and broken away over corroding reinforcing steel.
Post-tensioned slab repair in Fort Lauderdale
Repairs to slabs reinforced with tensioned steel tendons, which need specialist assessment before anyone cuts concrete.
Parking garage restoration in Fort Lauderdale
Columns, beams and decks in condo garages, which take the worst of water, salt and car traffic.
Waterproofing and sealants in Fort Lauderdale
Coatings, sealants and membranes that keep water out of the structure, and a required SIRS item.
Balcony railing replacement in Fort Lauderdale
Replacing corroded or loose railings, often with the balcony slab repairs around their posts.
Frequently asked questions
Is 180 days to finish or to start repairs?
The city's page says repairs within 180 days of the report unless the Building Official specifies otherwise. Ask the city how that applies to a large project.
How many Broward buildings need Phase 2?
Broward building officials reported 155 required Phase 2 milestone inspections in 2025.
How long do we have to make repairs in Fort Lauderdale?
Repairs are due within 180 days of the report unless the Building Official sets another timeline, and the engineer or architect gives the owner and the city a sealed letter, valid for up to 180 days, on whether the building may stay occupied during the work. Concrete is among the most common Phase 2 repairs Florida building officials report.
Are balconies and garages part of the Fort Lauderdale inspection?
Yes. The Broward policy includes balconies, elevated decks and attached docks and seawalls, and says parking garages and guardrails are not exempt.
Sources
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
