Condo concrete restoration in Boca Raton
Balcony, garage and facade repairs, planned around your milestone report.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate concrete restoration for condo and co-op associations in Boca Raton, working to the rules of the City of Boca Raton Building Recertification Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Concrete restoration in Boca Raton follows the findings of the local inspection, and we line up the repair scope, permits and contractor once the engineer's report is in. Boca gives 365 days from its sufficiency determination to start repairs under an active permit. Boca's guidelines add a specific inspection of underground and lower-level garages.
Last updated
How big restoration projects get
In 2024, 56 of the 671 Phase 2 repair permits reported to the state were valued at over $1 million, and 215 were between $1,001 and $25,000. In 2025, 30 of 232 permits were over $1 million.
Repair rules in Boca Raton

- Once the city finds the report sufficient, the owner has 365 days to start the repairs under permit, unless the Building Official or engineer of record sets a shorter time, and the repair permit must stay active. After the work, the engineer re-inspects and files a sealed letter or amended report.
- The guidelines single out underground and lower-level garages, citing low ground elevation, a shallow and rising water table, porous ground and a corrosive coastal environment, and add an inspection of how the garage has been maintained.
- The guidelines list railings, guardrails and balcony and terrace enclosures among the facade items the engineer examines, and unpermitted balcony enclosures must be identified and legalized before the building can be recertified.
- Covered buildings recertify at 30 years, or at 25 years for condo and co-op properties within three miles of a coastline as defined in s. 376.031; threshold buildings recertify at 30 years.
- Palm Beach County, home to Boca Raton, was one of the three counties with the most required Phase 2 inspections in 2024.
- Citing NIST's preliminary findings on Champlain Towers South, the guidelines ask engineers to look closely at deck slabs, plaza decks, columns and transfer members for signs of distress such as efflorescence.
- The program covers condo and co-op buildings three stories or more, or 50 feet or more in height, and it counts uninhabitable stories such as underground parking toward that height.
- OPPAGA reported that some Palm Beach County jurisdictions accept a single combined Phase 1 and Phase 2 inspection.
How we handle concrete restoration in Boca Raton
Because Boca counts underground parking levels as stories, garage slabs and columns under a condo can bring the whole building into the program. When the recertification finds repairs, we line up a contractor who works to the engineer's scope and collect the photos and reports the city expects with the resubmittal.[2]

Permits for condo concrete restoration in Boca Raton
- City of Boca Raton Building Division: Building Recertification Inspection Program notices, schedule and filings
How does a restoration project run?

- The engineer's report identifies the deterioration and recommended repairs.
- A Florida-licensed engineer prepares repair drawings and specifications, often the engineer who did the inspection.
- Qualified restoration contractors bid on the same scope, each disclosing any interest in the inspection firm as the statute requires.
- The contractor obtains permits from the local building department.
- Repairs proceed in phases, usually stack by stack, with shoring where the engineer requires it.
- The engineer observes the work, and the building department inspects and closes the permits.
What deadlines apply to repairs?
The state sets the outer limit of 365 days from the Phase 2 report for repairs to commence, and each county or city must adopt its own repair ordinance. Fort Lauderdale's program allows 180 days from the safety report unless the Building Official sets otherwise, and the City of Miami gives 60 days after filing a recertification report to obtain repair permits without a violation.[4][6][7]

Who may bid on the repairs?
Any design professional or contractor licensed under chapter 489 who bids on repairs recommended by a milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless it is disclosed to the association in writing. Without the disclosure, the contract is voidable.[4]
| Topic | Rule in Boca Raton | Source |
|---|---|---|
| Phase 2 | Boca's recertification combines Phase 1 and Phase 2 of the milestone inspection into one inspection. | Boca Raton guidelines |
| Extensions | An insufficient report can be corrected within 30 days, up to three times. | Boca Raton guidelines |
| Penalties | Boca enforces through orders of enforcement and Special Magistrate fines. | Boca Raton guidelines |
| Fees | The city charges $500 per recertification. | City of Boca Raton |
| Timing | The city publishes a recertification schedule for 2027 to 2031. | City of Boca Raton |
| Filing | Recertification is filed online or by mail to the Building Recertification Department. | City of Boca Raton |
Condo concrete restoration services in Boca Raton
Balcony restoration in Boca Raton
Slab edge and soffit repairs, coatings and railing work on condo balconies, stack by stack.
Concrete spalling repair in Boca Raton
Repairing concrete that has cracked and broken away over corroding reinforcing steel.
Post-tensioned slab repair in Boca Raton
Repairs to slabs reinforced with tensioned steel tendons, which need specialist assessment before anyone cuts concrete.
Parking garage restoration in Boca Raton
Columns, beams and decks in condo garages, which take the worst of water, salt and car traffic.
Waterproofing and sealants in Boca Raton
Coatings, sealants and membranes that keep water out of the structure, and a required SIRS item.
Balcony railing replacement in Boca Raton
Replacing corroded or loose railings, often with the balcony slab repairs around their posts.
Frequently asked questions
How long do we have to make repairs in Boca Raton?
Once the city finds the report sufficient, the owner has 365 days to start the repairs under permit, unless the Building Official or engineer of record sets a shorter time, and the repair permit must stay active. After the work, the engineer re-inspects and files a sealed letter or amended report. Concrete is among the most common Phase 2 repairs Florida building officials report.
Is Boca Raton on a 25 or 30-year schedule?
Condo and co-op properties within three miles of a coastline recertify at 25 years, others at 30, and threshold buildings at 30.
Does a two-story building over a parking garage count in Boca Raton?
Boca's program counts uninhabitable stories such as underground parking when deciding whether a building is three stories or 50 feet, so it may be covered even if the state law would not count those levels.
Sources
- Recertification Guidelines, Building Recertification Inspection Program, City of Boca Raton. Accessed October 28, 2026.
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.