Condo concrete restoration in Miami-Dade County
Balcony, garage and facade repairs, planned around your milestone report.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate concrete restoration for condo and co-op associations in Miami-Dade County, working to the rules of the Miami-Dade County Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Concrete restoration in Miami-Dade County follows the findings of the local inspection, and we line up the repair scope, permits and contractor once the engineer's report is in. 23 of the 24 buildings found unsafe or uninhabitable in Florida in 2025 were in Miami-Dade. Repairs must be permitted before the county recertifies the building.
Last updated
How big restoration projects get
In 2024, 56 of the 671 Phase 2 repair permits reported to the state were valued at over $1 million, and 215 were between $1,001 and $25,000. In 2025, 30 of 232 permits were over $1 million.
Repair rules in Miami-Dade County

- Of the 24 buildings found unsafe or uninhabitable statewide in 2025, 23 were in Miami-Dade, and Aventura alone reported 19.
- Where the reports call for repairs, the county requires the work to go through proper permitting before it will recertify the building.
- The county schedule turns on the year built. Coastal condo and co-op buildings three stories or more within three miles of the coastline and built in 1998 or later recertify at 25 years; other buildings built in 1993 or later at 30 years; every building then recertifies every 10 years.
- In the state's 2025 milestone data, Miami-Dade building officials reported 308 required Phase 2 inspections, the highest count among the counties that reported that year.
- The county identifies the coastal condo and co-op buildings that fall under the three-mile rule through a GIS mapping project, so the county's notice, not a tape measure, settles which schedule applies.
- Parking lot illumination must meet County Code s. 8C-3, and guardrails must meet s. 8C-6 where a parking lot abuts a canal, lake or other body of water. If guardrails are missing, a permit to install them comes first, and both certificates go in the recertification packet.
- Threshold buildings with structural glazing also need a facade inspection of the glazing adhesive every five years, filed within 90 days of notice with every page signed and sealed. The processing fee is $380.90.
- A missed deadline brings a citation without further notice, an initial penalty of $510, accumulating penalties up to $10,000 per violation and possible referral to the county's Lien Collection Unit.
How we handle concrete restoration in Miami-Dade County
Repairs that come out of a Miami-Dade recertification have to be permitted before the building can be recertified, and the county's 2025 numbers, 308 required Phase 2 inspections and 23 of the state's 24 unsafe or uninhabitable findings, show why the repair scope should be priced as soon as the engineer's findings arrive. We line up the scope, the permit and the contractor so the recertification can close.[2][1]

Permits for condo concrete restoration in Miami-Dade County
- Miami-Dade County Building, Recertification: Recertification notices, filings and fees for unincorporated Miami-Dade, and the county code every city follows
- City building departments (for example City of Miami, Miami Beach): Run recertification and milestone filings inside their own city limits
How does a restoration project run?

- The engineer's report identifies the deterioration and recommended repairs.
- A Florida-licensed engineer prepares repair drawings and specifications, often the engineer who did the inspection.
- Qualified restoration contractors bid on the same scope, each disclosing any interest in the inspection firm as the statute requires.
- The contractor obtains permits from the local building department.
- Repairs proceed in phases, usually stack by stack, with shoring where the engineer requires it.
- The engineer observes the work, and the building department inspects and closes the permits.
What deadlines apply to repairs?
The state sets the outer limit of 365 days from the Phase 2 report for repairs to commence, and each county or city must adopt its own repair ordinance. Fort Lauderdale's program allows 180 days from the safety report unless the Building Official sets otherwise, and the City of Miami gives 60 days after filing a recertification report to obtain repair permits without a violation.[4][5][6]

Who may bid on the repairs?
Any design professional or contractor licensed under chapter 489 who bids on repairs recommended by a milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless it is disclosed to the association in writing. Without the disclosure, the contract is voidable.[4]
| Topic | Rule in Miami-Dade County | Source |
|---|---|---|
| First inspection | County Code s. 8-11(f) has required recertification since 1975 and covers nearly every building type, not only condos. | Miami-Dade County |
| Extensions | An extension of up to 60 days costs $75.58 and needs a sealed occupancy statement from the engineer or architect. | Miami-Dade County |
| Phase 2 | Some Miami-Dade jurisdictions accept a combined Phase 1 and Phase 2 inspection. | OPPAGA 26-04 |
| Funding help | The county's Condominium Special Assessment Loan Program has offered eligible owners up to $50,000; ask whether a round is open. | Miami-Dade County |
| Notice | Reports are due within 90 days of the county's notice, after courtesy notices two years and one year ahead. | Miami-Dade County |
| Fees | The county's initial recertification review fee is $403.13, and a late submission costs $453.52. | Miami-Dade County |
Condo concrete restoration services in Miami-Dade County
Balcony restoration in Miami-Dade County
Slab edge and soffit repairs, coatings and railing work on condo balconies, stack by stack.
Concrete spalling repair in Miami-Dade County
Repairing concrete that has cracked and broken away over corroding reinforcing steel.
Post-tensioned slab repair in Miami-Dade County
Repairs to slabs reinforced with tensioned steel tendons, which need specialist assessment before anyone cuts concrete.
Parking garage restoration in Miami-Dade County
Columns, beams and decks in condo garages, which take the worst of water, salt and car traffic.
Waterproofing and sealants in Miami-Dade County
Coatings, sealants and membranes that keep water out of the structure, and a required SIRS item.
Balcony railing replacement in Miami-Dade County
Replacing corroded or loose railings, often with the balcony slab repairs around their posts.
Frequently asked questions
How long do we have to make repairs in Miami-Dade County?
Where the reports call for repairs, the county requires the work to go through proper permitting before it will recertify the building. Concrete is among the most common Phase 2 repairs Florida building officials report.
How often do Miami-Dade milestone inspections lead to Phase 2?
Miami-Dade building officials reported 308 required Phase 2 inspections in 2025, the highest count among the counties that reported that year.
Which Miami-Dade buildings were due by 31 December 2024?
Coastal condo and co-op buildings three stories or more within three miles of the coast built from 1983 to 1997, and other buildings built from 1983 to 1992. Buildings built before 1983 keep their established schedule.
Sources
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Condominium Special Assessment Program Relaunched, Miami-Dade County Housing and Community Development. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.