Condo milestone inspections in Florida
Get your milestone inspection scheduled before the building department's deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange Phase 1 and, if needed, Phase 2 inspections with a Florida-licensed engineer or architect, coordinate access and owner notices, and help the board plan what comes after the report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
A Florida building three habitable stories or more that is wholly or partly a residential condominium or cooperative needs a milestone inspection by 31 December of the year it turns 30, then every 10 years. The local building department may require it at 25 years where conditions such as proximity to salt water call for it. Phase 1 must be completed within 180 days of the department's notice, and the inspection is performed by a Florida-licensed architect or engineer (s. 553.899, Florida Statutes).
Last updated
Who needs a milestone inspection
The condominium or cooperative association, and any owner of a part of the building that is not under condo or co-op ownership, such as a commercial unit owner in a mixed-use tower. Each is responsible for compliance, and the association pays for the parts it maintains.
- Buildings three habitable stories or more, as the Florida Building Code measures stories
- Wholly or partly residential condominium (chapter 718) or cooperative (chapter 719) ownership
- Not single-family, two, three or four-family dwellings with three or fewer habitable stories above ground
What the state data shows
Local building departments reported 8,736 Phase 1 and 1,575 Phase 2 inspections completed across 2024 and 2025. They received 903 Phase 2 repair permit applications, with an average permit value of $337,229 in 2024 and $496,236 in 2025.
When is a milestone inspection due?
By 31 December of the year the building reaches 30 years from its certificate of occupancy, and every 10 years after that. If the certificate date is not available, the building official's records of occupancy set the date. Buildings that turned 30 before 1 July 2022 were due before 31 December 2024, and those that turned 30 between 1 July 2022 and 31 December 2024 were due before 31 December 2025.[1]
Is it 25 years within 3 miles of the coast?
Not automatically any more. The 2022 law set 25 years for buildings within 3 miles of the coastline. The 2023 law (SB 154) replaced that with a local choice, so the local enforcement agency now decides whether local circumstances, such as proximity to salt water, require 25 years. Many South Florida departments chose to keep the 3-mile line; Tampa and Pinellas use 30 years. Check your own department.[1][3][4][5][6][7]

How do Phase 1 and Phase 2 work?
- The building department sends written notice by certified mail, return receipt requested.
- The association tells unit owners within 14 days, with the due date.
- Phase 1, a visual examination and qualitative assessment, is completed within 180 days of the notice, when the architect or engineer submits the report to the building department.
- Phase 2, with destructive or nondestructive testing, is required only if Phase 1 finds substantial structural deterioration. A progress report with a timeline is due within 180 days of the Phase 1 report.
- The association sends the inspector's summary to every owner within 45 days of receiving a report.
- Repairs for substantial structural deterioration must start within 365 days of the Phase 2 report.
Who performs the inspection?
An architect licensed under chapter 481 or an engineer licensed under chapter 471 who is authorized to practise in Florida. A team may do the work with an architect or engineer as the registered design professional in responsible charge, and all work and reports are signed and sealed by the qualified team member. We arrange and coordinate the inspection; the professional performs it and seals the report.[1]

| Item | Figure | Source |
|---|---|---|
| Average Phase 2 repair permit value, 2024 | $337,229 | OPPAGA Report 26-04 |
| Average Phase 2 repair permit value, 2025 | $496,236 | OPPAGA Report 26-04 |
| Range of Phase 2 repair permit values | Under $1,000 to $30 million | OPPAGA Report 26-04 |
| Miami-Dade recertification initial review fee | $403.13 | Miami-Dade County |
| Fort Lauderdale safety inspection review fee | $375 | City of Fort Lauderdale |
| Boca Raton recertification fee | $500 | City of Boca Raton |
Milestone inspections services
Phase 1 milestone inspection
The visual examination and report due within 180 days of the building department's notice.
Phase 2 milestone inspection
Testing to assess substantial structural deterioration found in Phase 1, with a progress report due in 180 days.
Coastal 25-year inspections
Where the building department requires the first milestone at 25 years because of salt water, county by county.
Repairs after Phase 2
The 365-day rule, local repair ordinances, permits and bid disclosures after a Phase 2 report.
Frequently asked questions
What happens if we miss the milestone deadline?
The local enforcement agency may set its own timelines and penalties. It may also extend the deadline for good cause, for example when the association has a signed contract with an architect or engineer and the work cannot reasonably finish in time. OPPAGA counted 1,587 extensions across 2024 and 2025.
Does a milestone inspection check building code compliance?
No. The statute says the purpose is not to decide whether an existing building complies with the Florida Building Code or the fire safety code. It attests to the life safety and adequacy of the structural components.
Can an older structural report count?
The building department may accept a structural integrity and condition report prepared before 1 July 2022 if it substantially complies with s. 553.899. The next 10-year inspection is then based on that report's date, and owners must still get the summary.
What counts as substantial structural deterioration?
Substantial structural distress or weakness that harms the building's general structural condition and integrity. Surface cracks, sagging, deflection, leaks or peeling finishes do not count unless the engineer or architect decides they are a sign of it.
Who pays for the milestone inspection?
The association pays for the portions of the building it maintains under its governing documents. Owners of any non-condo portion share responsibility for compliance.
Sources
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Chapter 2023-203, Laws of Florida (CS/CS/SB 154), approved June 9 2023, Laws of Florida. Accessed October 27, 2026.
- Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- Condo Milestone Inspections, Pinellas County, Pinellas County. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.