Milestone inspections in Miami-Dade County
Get your milestone inspection scheduled before the building department's deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate milestone inspections for condo and co-op associations in Miami-Dade County, working to the rules of the Miami-Dade County Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo and co-op buildings in Miami-Dade County that are three habitable stories or more need a milestone inspection by a Florida-licensed engineer or architect, which we arrange and coordinate. County Code s. 8-11(f) has required recertification since 1975 and covers nearly every building type, not only condos. Coastal condo and co-op buildings built in 1998 or later recertify at 25 years, other buildings built from 1993 at 30, then every 10 years.
Last updated
What the state data shows
Local building departments reported 8,736 Phase 1 and 1,575 Phase 2 inspections completed across 2024 and 2025. They received 903 Phase 2 repair permit applications, with an average permit value of $337,229 in 2024 and $496,236 in 2025.
Milestone inspection rules in Miami-Dade County

- The county schedule turns on the year built. Coastal condo and co-op buildings three stories or more within three miles of the coastline and built in 1998 or later recertify at 25 years; other buildings built in 1993 or later at 30 years; every building then recertifies every 10 years.
- The county office handles unincorporated Miami-Dade. Cities such as Miami and Miami Beach run recertification through their own building departments under the same county code.
- Courtesy notices go out two years and one year before the due year, and the recertification reports are due within 90 days of the Notice of Building Recertification.
- Of the 24 buildings found unsafe or uninhabitable statewide in 2025, 23 were in Miami-Dade, and Aventura alone reported 19.
- The county identifies the coastal condo and co-op buildings that fall under the three-mile rule through a GIS mapping project, so the county's notice, not a tape measure, settles which schedule applies.
- In the state's 2025 milestone data, Miami-Dade building officials reported 308 required Phase 2 inspections, the highest count among the counties that reported that year.
- OPPAGA found that some building departments in Miami-Dade accept one combined Phase 1 and Phase 2 milestone inspection instead of two separate visits.
- Fees from 1 October 2025: $403.13 for the initial structural and electrical review, $453.52 if the reports arrive after 90 days, $143.23 per discipline for a re-review and $169.04 per discipline for a quality control inspection.
How we handle milestone inspections in Miami-Dade County
A Miami-Dade condo tower usually answers to two clocks. The county counts recertification from the year built and gives 90 days from its notice; the state milestone law counts from the certificate of occupancy and gives 180 days for Phase 1. We ask the engineer to scope one inspection that can serve both where the building official accepts it, and we keep each filing on its own deadline.[1][5]

Permits for milestone inspections in Miami-Dade County
- Miami-Dade County Building, Recertification: Recertification notices, filings and fees for unincorporated Miami-Dade, and the county code every city follows
- City building departments (for example City of Miami, Miami Beach): Run recertification and milestone filings inside their own city limits
When is a milestone inspection due?
By 31 December of the year the building reaches 30 years from its certificate of occupancy, and every 10 years after that. If the certificate date is not available, the building official's records of occupancy set the date. Buildings that turned 30 before 1 July 2022 were due before 31 December 2024, and those that turned 30 between 1 July 2022 and 31 December 2024 were due before 31 December 2025.[5]
Is it 25 years within 3 miles of the coast?
Not automatically any more. The 2022 law set 25 years for buildings within 3 miles of the coastline. The 2023 law (SB 154) replaced that with a local choice, so the local enforcement agency now decides whether local circumstances, such as proximity to salt water, require 25 years. Many South Florida departments chose to keep the 3-mile line; Tampa and Pinellas use 30 years. Check your own department.[5][6][7][8][9][10]

How do Phase 1 and Phase 2 work?
- The building department sends written notice by certified mail, return receipt requested.
- The association tells unit owners within 14 days, with the due date.
- Phase 1, a visual examination and qualitative assessment, is completed within 180 days of the notice, when the architect or engineer submits the report to the building department.
- Phase 2, with destructive or nondestructive testing, is required only if Phase 1 finds substantial structural deterioration. A progress report with a timeline is due within 180 days of the Phase 1 report.
- The association sends the inspector's summary to every owner within 45 days of receiving a report.
- Repairs for substantial structural deterioration must start within 365 days of the Phase 2 report.
Who performs the inspection?
An architect licensed under chapter 481 or an engineer licensed under chapter 471 who is authorized to practise in Florida. A team may do the work with an architect or engineer as the registered design professional in responsible charge, and all work and reports are signed and sealed by the qualified team member. We arrange and coordinate the inspection; the professional performs it and seals the report.[5]

| Topic | Rule in Miami-Dade County | Source |
|---|---|---|
| Buildings covered | County Code s. 8-11(f) has required recertification since 1975 and covers nearly every building type, not only condos. | Miami-Dade County |
| Penalties | Late buildings face a $510 initial penalty, up to $10,000 per violation and a possible lien. | Miami-Dade County |
| Extensions | An extension of up to 60 days costs $75.58 and needs a sealed occupancy statement from the engineer or architect. | Miami-Dade County |
| Who signs | Threshold buildings need separate structural and electrical engineers, with proof of the structural engineer's specialization. | Miami-Dade County |
| Repairs | Repairs must be permitted before the county recertifies the building. | Miami-Dade County |
Milestone inspections services in Miami-Dade County
Phase 1 milestone inspection in Miami-Dade County
The visual examination and report due within 180 days of the building department's notice.
Phase 2 milestone inspection in Miami-Dade County
Testing to assess substantial structural deterioration found in Phase 1, with a progress report due in 180 days.
Coastal 25-year inspections in Miami-Dade County
Where the building department requires the first milestone at 25 years because of salt water, county by county.
Repairs after Phase 2 in Miami-Dade County
The 365-day rule, local repair ordinances, permits and bid disclosures after a Phase 2 report.
Frequently asked questions
When is a milestone inspection due in Miami-Dade County?
Unincorporated Miami-Dade follows County Code s. 8-11(f), a building recertification program in place since 1975 and amended on 1 June 2022. It reaches almost every building type; only single-family homes, duplexes and minor buildings of 2,000 square feet or less with an occupant load of 10 or less are exempt. The building department's notice letter is the document that fixes your date.
Which Miami-Dade buildings were due by 31 December 2024?
Coastal condo and co-op buildings three stories or more within three miles of the coast built from 1983 to 1997, and other buildings built from 1983 to 1992. Buildings built before 1983 keep their established schedule.
Do we file with Miami-Dade County or with our city?
The county handles unincorporated Miami-Dade. Inside cities such as Miami and Miami Beach, the city building department runs recertification under the same county code.
How much warning does Miami-Dade give before recertification is due?
The county sends courtesy notices two years and one year before the due year. Once the Notice of Building Recertification arrives, the reports are due within 90 days.
Sources
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Chapter 2023-203, Laws of Florida (CS/CS/SB 154), approved June 9 2023, Laws of Florida. Accessed October 27, 2026.
- Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- Condo Milestone Inspections, Pinellas County, Pinellas County. Accessed October 28, 2026.