Phase 1 milestone inspection in Miami-Dade County
Due within 180 days of your building department's notice.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate Phase 1 inspections for condo and co-op associations in Miami-Dade County, working to the rules of the Miami-Dade County Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Miami-Dade County we line it up with the notice and filing rules of the Miami-Dade County Building Department. Reports are due within 90 days of the county's notice, after courtesy notices two years and one year ahead. The county files for unincorporated areas, while cities such as Miami and Miami Beach run their own desks under the same code.
Last updated
Who this is for
Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.
What Miami-Dade County sets for Phase 1

- Courtesy notices go out two years and one year before the due year, and the recertification reports are due within 90 days of the Notice of Building Recertification.
- The county office handles unincorporated Miami-Dade. Cities such as Miami and Miami Beach run recertification through their own building departments under the same county code.
- The Building Official may extend the deadline by up to 60 days on a written request from the engineer or architect, with a signed and sealed statement that the building may stay occupied. The extension fee is $75.58.
- Threshold buildings, including those four stories or taller, are inspected separately by a qualified structural engineer and an electrical engineer, and the structural report carries a self-qualification letter and proof of the engineer's DBPR structural specialization.
- The county schedule turns on the year built. Coastal condo and co-op buildings three stories or more within three miles of the coastline and built in 1998 or later recertify at 25 years; other buildings built in 1993 or later at 30 years; every building then recertifies every 10 years.
How we handle Phase 1 inspections in Miami-Dade County
A Miami-Dade condo tower usually answers to two clocks. The county counts recertification from the year built and gives 90 days from its notice; the state milestone law counts from the certificate of occupancy and gives 180 days for Phase 1. We ask the engineer to scope one inspection that can serve both where the building official accepts it, and we keep each filing on its own deadline.[1][5]

Permits in Miami-Dade County
- Miami-Dade County Building, Recertification: Recertification notices, filings and fees for unincorporated Miami-Dade, and the county code every city follows
- City building departments (for example City of Miami, Miami Beach): Run recertification and milestone filings inside their own city limits
What happens in a Phase 1 inspection?

- Review of available drawings, prior reports and repair records
- Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
- Visual assessment of load-bearing elements and primary structural members and systems
- A sealed report with a separate summary of material findings and recommendations
What must the Phase 1 report say?
- The seal and signature of the engineer or architect
- The manner and type of inspection
- Any substantial structural deterioration, its extent and recommended repairs
- Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
- Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
- Items requiring further inspection
Timeline from notice to owner summary

- Day 0: certified letter from the building department
- By day 14: association notifies unit owners of the inspection and due date
- By day 180: Phase 1 report submitted to the building department
- Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
| Topic | Rule in Miami-Dade County | Source |
|---|---|---|
| Buildings covered | County Code s. 8-11(f) has required recertification since 1975 and covers nearly every building type, not only condos. | Miami-Dade County |
| Fees | The county's initial recertification review fee is $403.13, and a late submission costs $453.52. | Miami-Dade County |
| Repairs | Repairs must be permitted before the county recertifies the building. | Miami-Dade County |
| State data | 23 of the 24 buildings found unsafe or uninhabitable in Florida in 2025 were in Miami-Dade. | OPPAGA 26-04 |
Frequently asked questions
How long do we have to finish Phase 1 in Miami-Dade County?
Courtesy notices go out two years and one year before the due year, and the recertification reports are due within 90 days of the Notice of Building Recertification. If the engineer cannot meet the date, ask for an extension before it passes.
How much warning does Miami-Dade give before recertification is due?
The county sends courtesy notices two years and one year before the due year. Once the Notice of Building Recertification arrives, the reports are due within 90 days.
Do we file with Miami-Dade County or with our city?
The county handles unincorporated Miami-Dade. Inside cities such as Miami and Miami Beach, the city building department runs recertification under the same county code.
Can we get more time for a Miami-Dade recertification?
The Building Official may grant up to 60 days on a written request from the engineer or architect with a signed and sealed statement that the building may stay occupied. The fee is $75.58.
Sources
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.