Phase 1 milestone inspection in Orlando

Due within 180 days of your building department's notice.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate Phase 1 inspections for condo and co-op associations in Orlando, working to the rules of the City of Orlando Building Official from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Orlando we line it up with the notice and filing rules of the City of Orlando Building Official. Inspections are due within 180 days of the city's certified letter. Phase One reports go in through Orlando's online form, with a response within one business day.

Last updated

Who this is for

Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.

What Orlando sets for Phase 1

Condominium towers around a downtown Orlando lake with a fountain and oak trees
  • The city mails certified letters to associations whose inspection is due, and the inspection is due within 180 days of receiving the letter unless an earlier legacy date applies.
  • The Phase One report and forms are uploaded through the city's online form; the city aims to respond within one business day and then allows five business days for review.
  • The city page lists 30-year deadlines in its steps but says 25 or 30 years in its FAQ, so confirm with the building official which trigger applies before relying on either.
  • The city takes milestone questions at 407.246.3443.
[1]

How we handle Phase 1 inspections in Orlando

Orlando's process is quick on paper. Phase One goes in through an online form with a response promised within one business day, and Phase Two forms go by email to the building official. The open question is the trigger, since the city page shows both 30 and 25 or 30 years, so we confirm the date with the building official before the board budgets.[1]

Sounding hammer, crack gauge and moisture meter on a closed binder on a condo exterior walkway

Permits in Orlando

What happens in a Phase 1 inspection?

Sounding hammer, flashlight, tape measure, chalk, a concrete core sample and a notebook laid out on concrete
  • Review of available drawings, prior reports and repair records
  • Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
  • Visual assessment of load-bearing elements and primary structural members and systems
  • A sealed report with a separate summary of material findings and recommendations
[3]

What must the Phase 1 report say?

  • The seal and signature of the engineer or architect
  • The manner and type of inspection
  • Any substantial structural deterioration, its extent and recommended repairs
  • Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
  • Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
  • Items requiring further inspection
[3]

Timeline from notice to owner summary

Condominium lobby mail room with brass mailboxes and a certified letter with a green return receipt card on the counter
  • Day 0: certified letter from the building department
  • By day 14: association notifies unit owners of the inspection and due date
  • By day 180: Phase 1 report submitted to the building department
  • Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
[3]
Phase 1 inspections in Orlando: the local rules at a glance
TopicRule in OrlandoSource
Buildings coveredOrlando's rule covers condo buildings three stories or taller, including condos inside apartment communities.City of Orlando
RepairsOrlando gives 365 days after submitting to pull a repair permit.City of Orlando
State dataOrange County had 1 unsafe or uninhabitable finding in 2025, and Osceola had 10 in 2024.OPPAGA 26-04
From the official pages, read 28 October 2026. Confirm dates with the City of Orlando Building Official. Sources: City of Orlando, Complete Your Milestone Inspection, City of Orlando; Florida Legislature, OPPAGA, Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026. Last updated October 28, 2026.

Frequently asked questions

How long do we have to finish Phase 1 in Orlando?

The city mails certified letters to associations whose inspection is due, and the inspection is due within 180 days of receiving the letter unless an earlier legacy date applies. If the engineer cannot meet the date, ask for an extension before it passes.

How do we submit Phase One in Orlando?

Through the city's online form. The city aims to respond within one business day and then allows five business days for review.

Our condo units are in a former apartment complex. Do we need a milestone inspection in Orlando?

Orlando's page says the requirement includes condos within an apartment community, as long as the building is three stories or taller.

Sources

  1. Complete Your Milestone Inspection, City of Orlando, City of Orlando. Accessed October 28, 2026.
  2. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  3. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.