Phase 1 milestone inspection in Miami Beach
Due within 180 days of your building department's notice.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate Phase 1 inspections for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Miami Beach we line it up with the notice and filing rules of the City of Miami Beach Building Department. Reports are filed through the city's Citizen Self Service portal or by email. Threshold buildings in Miami Beach need a Florida-licensed structural engineer and a Florida-licensed electrical engineer.
Last updated
Who this is for
Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.
What Miami Beach sets for Phase 1

- Reports go to the building department through the city's Citizen Self Service portal or by email.
- Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
- The county code behind the city program puts coastal condo and co-op buildings three stories or more, built from 1998 within three miles of the coast, on a 25-year first recertification. Miami Beach sits on barrier islands between the Atlantic and Biscayne Bay, so confirm on your notice which date the city applied.
How we handle Phase 1 inspections in Miami Beach
On Miami Beach the milestone inspection, the city recertification and the county's coastal schedule overlap. Threshold towers need a structural engineer and an electrical engineer, and the city wants an updated report after repairs before it issues the approval letter, so we scope the engineer's work once and keep the city's form set complete.[1][2][3]

Permits in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
What happens in a Phase 1 inspection?

- Review of available drawings, prior reports and repair records
- Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
- Visual assessment of load-bearing elements and primary structural members and systems
- A sealed report with a separate summary of material findings and recommendations
What must the Phase 1 report say?
- The seal and signature of the engineer or architect
- The manner and type of inspection
- Any substantial structural deterioration, its extent and recommended repairs
- Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
- Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
- Items requiring further inspection
Timeline from notice to owner summary

- Day 0: certified letter from the building department
- By day 14: association notifies unit owners of the inspection and due date
- By day 180: Phase 1 report submitted to the building department
- Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
| Topic | Rule in Miami Beach | Source |
|---|---|---|
| First inspection | Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. | City of Miami Beach |
| Repairs | After repairs pass final inspection, an updated report goes in before the city issues its approval letter. | City of Miami Beach |
| Filing | Reports are filed through the city's Citizen Self Service portal or by email. | City of Miami Beach |
Frequently asked questions
How do we file in Miami Beach?
Through the city's Citizen Self Service portal or by email to the building department.
Is a structural engineer required in Miami Beach?
For threshold buildings, yes, and an electrical engineer as well. Buildings below the threshold may use any Florida-licensed design professional.
Is Miami Beach on a 25 or 30-year schedule?
The city page states 30 years. The county code it applies sets 25 years for coastal condo and co-op buildings built from 1998, so the date on your notice is the one to follow.
Sources
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
