Phase 2 milestone inspection in Miami Beach

Testing and a repair program when Phase 1 finds deterioration.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate Phase 2 inspections for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Phase 2 adds destructive or nondestructive testing when Phase 1 finds substantial structural deterioration, and in Miami Beach it follows local filing rules as well as s. 553.899. Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 inspections in 2025. Reports are filed through the city's Citizen Self Service portal or by email.

Last updated

Who this is for

Associations whose Phase 1 report found substantial structural deterioration, and boards preparing for the cost of the repairs that usually follow.

Phase 2 repair costs in the state data

OPPAGA counted 903 Phase 2 repair permit applications for 2024 and 2025, from under $1,000 to $30 million. The average permit value was $337,229 in 2024 and $496,236 in 2025, and the most common repairs were concrete, electrical and structural.

Phase 2 in Miami Beach

Mid-century and modern oceanfront condominium buildings behind sea oats on Miami Beach
  • Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 milestone inspections in 2025.
  • Reports go to the building department through the city's Citizen Self Service portal or by email.
  • After permitted repairs pass final inspection, the owner submits an updated report from a Florida-licensed design professional stating the building is structurally and electrically safe, and the Building Official then issues the recertification approval letter.
  • Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
  • The same page refers owners to a mandatory annual maintenance log, a record that is useful evidence when the reserve study is updated.
[1][2]

How we handle Phase 2 inspections in Miami Beach

On Miami Beach the milestone inspection, the city recertification and the county's coastal schedule overlap. Threshold towers need a structural engineer and an electrical engineer, and the city wants an updated report after repairs before it issues the approval letter, so we scope the engineer's work once and keep the city's form set complete.[2][3][4]

Clear crack monitoring gauge screwed across a diagonal crack in a condominium stairwell wall

Permits in Miami Beach

What does Phase 2 testing involve?

The inspector decides the testing, which can be destructive, such as cores or opening up a slab edge, or nondestructive. The statute tells the inspector to prefer locations that are least disruptive and most easily repaired while still representative of the structure. Plan for unit access, noise and temporary protection.[4]

Concrete core samples, one showing a corroded rebar end, beside a cored hole and a core drill bit on a balcony slab

Phase 2 deadlines

Rebar scanner and sounding hammer on a condo balcony slab marked with chalk grid lines
  • Within 180 days of the Phase 1 report: progress report to the building department with a timeline for completing Phase 2
  • On completion: sealed Phase 2 report and summary to the association, any non-condo owner and the building official
  • Within 45 days of receiving it: summary to every owner
  • Within 365 days of the Phase 2 report: repairs for substantial structural deterioration must have commenced, or the building department must check whether the building is unsafe for occupancy
[4]
Phase 2 inspections in Miami Beach: the local rules at a glance
TopicRule in Miami BeachSource
Structures coveredLots that abut a canal, lake or other water need guardrails under County Code s. 8C-6.Miami-Dade County
Phase 2Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 inspections in 2025.OPPAGA 26-04
FilingReports are filed through the city's Citizen Self Service portal or by email.City of Miami Beach
From the official pages, read 28 October 2026. Confirm dates with the City of Miami Beach Building Department. Sources: Florida Legislature, OPPAGA, Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026; City of Miami Beach, Building Recertification, City of Miami Beach; Miami-Dade County, Recertification (Miami-Dade County Building). Last updated October 28, 2026.

Frequently asked questions

What happens after a Phase 2 finding in Miami Beach?

Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 milestone inspections in 2025. The Phase 2 report also sets out the repairs the engineer recommends, which become the repair scope.

How do we file in Miami Beach?

Through the city's Citizen Self Service portal or by email to the building department.

Is a structural engineer required in Miami Beach?

For threshold buildings, yes, and an electrical engineer as well. Buildings below the threshold may use any Florida-licensed design professional.

Sources

  1. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  2. Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
  3. Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.