Phase 2 milestone inspection in Fort Lauderdale

Testing and a repair program when Phase 1 finds deterioration.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate Phase 2 inspections for condo and co-op associations in Fort Lauderdale, working to the rules of the City of Fort Lauderdale Building Services from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Phase 2 adds destructive or nondestructive testing when Phase 1 finds substantial structural deterioration, and in Fort Lauderdale it follows local filing rules as well as s. 553.899. Broward's policy counts its safety inspection as both phases of the state milestone inspection. Broward reported 155 required Phase 2 milestone inspections in 2025.

Last updated

Who this is for

Associations whose Phase 1 report found substantial structural deterioration, and boards preparing for the cost of the repairs that usually follow.

Phase 2 repair costs in the state data

OPPAGA counted 903 Phase 2 repair permit applications for 2024 and 2025, from under $1,000 to $30 million. The average permit value was $337,229 in 2024 and $496,236 in 2025, and the most common repairs were concrete, electrical and structural.

Phase 2 in Fort Lauderdale

Mid-rise and high-rise beachfront condominiums behind palms and a wide beach in Fort Lauderdale
  • BORA Policy 05-05 treats the Broward safety inspection as compliance for both Phase 1 and Phase 2 of the state milestone inspection.
  • Broward building officials reported 155 required Phase 2 milestone inspections in 2025, while 7 of the county's 31 municipal building officials did not report that year.
  • Reports are digitally signed and sealed and uploaded as separate files through the BSIP application in the LauderBuild Plan Room; paper submissions are no longer accepted, and the review fee is $375.
  • Repairs are due within 180 days of the report unless the Building Official sets another timeline, and the engineer or architect gives the owner and the city a sealed letter, valid for up to 180 days, on whether the building may stay occupied during the work.
  • The Broward program expressly includes balconies, elevated decks, and docks and seawalls that are attached to or support a structure, and it states that parking garages and guardrails are not exempt.
[1][2][3]

How we handle Phase 2 inspections in Fort Lauderdale

Fort Lauderdale boards plan around a summer notice season. Letters arrive between June and August, the report is due 180 days later, and repairs are due 180 days after the report, so a building noticed in July is usually repairing by the following summer. Because BORA counts the Broward inspection as both milestone phases, we scope one structural and electrical inspection for the LauderBuild filing.[3][1]

Clear crack monitoring gauge screwed across a diagonal crack in a condominium stairwell wall

Permits in Fort Lauderdale

What does Phase 2 testing involve?

The inspector decides the testing, which can be destructive, such as cores or opening up a slab edge, or nondestructive. The statute tells the inspector to prefer locations that are least disruptive and most easily repaired while still representative of the structure. Plan for unit access, noise and temporary protection.[4]

Concrete core samples, one showing a corroded rebar end, beside a cored hole and a core drill bit on a balcony slab

Phase 2 deadlines

Rebar scanner and sounding hammer on a condo balcony slab marked with chalk grid lines
  • Within 180 days of the Phase 1 report: progress report to the building department with a timeline for completing Phase 2
  • On completion: sealed Phase 2 report and summary to the association, any non-condo owner and the building official
  • Within 45 days of receiving it: summary to every owner
  • Within 365 days of the Phase 2 report: repairs for substantial structural deterioration must have commenced, or the building department must check whether the building is unsafe for occupancy
[4]
Phase 2 inspections in Fort Lauderdale: the local rules at a glance
TopicRule in Fort LauderdaleSource
Who signsA Florida-licensed professional specializing in electrical design prepares the electrical report.BORA Policy 05-05
Who signsThreshold towers need the structural portion from a structural specialist who qualifies as a Special Inspector.BORA Policy 05-05
NoticeNotices go out by certified mail between 1 June and 31 August each year.City of Fort Lauderdale
Report deadlineThe safety report is due within 180 days of the notice, on separate structural and electrical forms.City of Fort Lauderdale
From the official pages, read 28 October 2026. Confirm dates with the City of Fort Lauderdale Building Services. Sources: Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page), Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024); City of Fort Lauderdale, Building Safety Inspection Program, City of Fort Lauderdale. Last updated October 28, 2026.

Frequently asked questions

What happens after a Phase 2 finding in Fort Lauderdale?

BORA Policy 05-05 treats the Broward safety inspection as compliance for both Phase 1 and Phase 2 of the state milestone inspection. The Phase 2 report also sets out the repairs the engineer recommends, which become the repair scope.

Is the Broward safety inspection the same as the milestone inspection?

BORA Policy 05-05 says the Broward Building Safety Inspection serves as compliance for both Phase 1 and Phase 2 of the state milestone inspection, so one well-scoped inspection covers both.

How do we file in Fort Lauderdale?

Digitally signed and sealed reports go through the BSIP application in the LauderBuild Plan Room, with a $375 review fee. Paper is no longer accepted.

How long do we have for repairs in Fort Lauderdale?

180 days from the report unless the Building Official sets another timeline. Longer work needs an active permit and the engineer's approved timeline.

Sources

  1. Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
  2. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  3. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.