Repairs after Phase 2 in Fort Lauderdale

Repairs must commence within 365 days of the Phase 2 report.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate repairs after Phase 2 for condo and co-op associations in Fort Lauderdale, working to the rules of the City of Fort Lauderdale Building Services from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

State law requires repairs for substantial structural deterioration to start within 365 days of the Phase 2 report, and Fort Lauderdale adds its own permit and filing steps. Repairs are due within 180 days of the report unless the Building Official sets another timeline. Broward reported 155 required Phase 2 milestone inspections in 2025.

Last updated

What repairs cost, from state data

Average Phase 2 repair permit values were $337,229 in 2024 and $496,236 in 2025. Concrete, electrical and structural repairs were the most common.

Repair deadlines and permits in Fort Lauderdale

Mid-rise and high-rise beachfront condominiums behind palms and a wide beach in Fort Lauderdale
  • Repairs are due within 180 days of the report unless the Building Official sets another timeline, and the engineer or architect gives the owner and the city a sealed letter, valid for up to 180 days, on whether the building may stay occupied during the work.
  • Broward building officials reported 155 required Phase 2 milestone inspections in 2025, while 7 of the county's 31 municipal building officials did not report that year.
  • BORA Policy 05-05 treats the Broward safety inspection as compliance for both Phase 1 and Phase 2 of the state milestone inspection.
  • A late report goes to a Special Magistrate or the Code Enforcement Board, and a building whose required repairs are not made can be found unsafe and sent to the Unsafe Structures Board.
  • Reports are digitally signed and sealed and uploaded as separate files through the BSIP application in the LauderBuild Plan Room; paper submissions are no longer accepted, and the review fee is $375.
[1][2][3]

How we handle repairs after Phase 2 in Fort Lauderdale

Fort Lauderdale boards plan around a summer notice season. Letters arrive between June and August, the report is due 180 days later, and repairs are due 180 days after the report, so a building noticed in July is usually repairing by the following summer. Because BORA counts the Broward inspection as both milestone phases, we scope one structural and electrical inspection for the LauderBuild filing.[1][2]

Underside of condo balconies with fresh unpainted concrete repair patches and new aluminium railings

Permits in Fort Lauderdale

Local repair windows we have checked

Condo parking garage under repair with bags of repair mortar, bundles of rebar, column formwork and yellow shoring posts
  • Fort Lauderdale: repairs within 180 days of the safety report unless the Building Official specifies otherwise
  • Palm Beach County: repairs commence within 365 days
  • City of Miami: submitting the recertification report gives 60 days to obtain repair permits without a violation
  • Orlando: 365 days to pull a permit after submitting
[1][5][6][7]

Bids and disclosures

A design professional or chapter 489 contractor bidding on repairs recommended by the milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless that is disclosed to the association in writing. A contract signed without the disclosure is voidable. We collect these disclosures and pass them to the board with each bid.[4]

Paying for repairs

Owner-controlled associations that must have a SIRS may use a line of credit or loan for milestone repairs with a majority of the total voting interests, and for budgets adopted on or before 31 December 2028 may pause reserve contributions for up to two budgets to fund milestone repairs.[8]

Drained condominium pool fenced off with orange safety netting, covered lounge chairs and an empty work platform on the tower
Repairs after Phase 2 in Fort Lauderdale: the local rules at a glance
TopicRule in Fort LauderdaleSource
ExtensionsThe Building Official may allow up to 60 extra days to file, and 60 days to obtain repair permits.BORA Policy 05-05
NoticeNotices go out by certified mail between 1 June and 31 August each year.City of Fort Lauderdale
Report deadlineThe safety report is due within 180 days of the notice, on separate structural and electrical forms.City of Fort Lauderdale
From the official pages, read 28 October 2026. Confirm dates with the City of Fort Lauderdale Building Services. Sources: City of Fort Lauderdale, Building Safety Inspection Program, City of Fort Lauderdale; Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page), Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024). Last updated October 28, 2026.

Frequently asked questions

How long do we have to start repairs in Fort Lauderdale?

Repairs are due within 180 days of the report unless the Building Official sets another timeline, and the engineer or architect gives the owner and the city a sealed letter, valid for up to 180 days, on whether the building may stay occupied during the work. Repairs need building permits, so the contractor and drawings should be lined up before the deadline is close.

Is the Broward safety inspection the same as the milestone inspection?

BORA Policy 05-05 says the Broward Building Safety Inspection serves as compliance for both Phase 1 and Phase 2 of the state milestone inspection, so one well-scoped inspection covers both.

How common are Phase 2 findings in Broward?

Broward building officials reported 155 required Phase 2 milestone inspections in 2025.

Sources

  1. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
  2. Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
  3. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  5. Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
  6. Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
  7. Complete Your Milestone Inspection, City of Orlando, City of Orlando. Accessed October 28, 2026.
  8. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.