Condo Safety Florida

Repairs after Phase 2 in Hollywood

Repairs must commence within 365 days of the Phase 2 report.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate repairs after Phase 2 for condo and co-op associations in Hollywood, working to the rules of the City of Hollywood Building Division from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

State law requires repairs for substantial structural deterioration to start within 365 days of the Phase 2 report, and Hollywood adds its own permit and filing steps. For conditions that threaten life or safety, permits are due within 180 days of the report. Broward County reported 155 required Phase 2 inspections in 2025.

Last updated

What repairs cost, from state data

Average Phase 2 repair permit values were $337,229 in 2024 and $496,236 in 2025. Concrete, electrical and structural repairs were the most common.

Repair deadlines and permits in Hollywood

Mid-rise and high-rise condominiums along a wide beachfront promenade in Hollywood, Florida
  • Where the report finds conditions that threaten life, health or safety, the owner has 180 days from the report date to obtain the required permits.
  • Broward County, which includes Hollywood, reported 155 required Phase 2 milestone inspections in 2025.
  • BORA Policy 05-05, which Hollywood's program follows, counts the Broward safety inspection as compliance with both phases of the state milestone inspection.
  • The city charges a $300 administrative fee to review the third-party inspection reports.
  • BORA's policy lets the Building Official extend the report deadline by up to 60 days, and gives up to 60 days to obtain repair permits on a sealed request from the professional.
[1][2][3]

How we handle repairs after Phase 2 in Hollywood

Hollywood's beachfront and Intracoastal towers meet the state milestone law through the Broward program, which starts at 25 years. The detail to watch is the clock. The city's page gives 90 days from the Notice of Required Inspection, so we book the engineer as soon as the letter arrives rather than planning on the 180 days quoted elsewhere in Broward.[1][3]

Underside of condo balconies with fresh unpainted concrete repair patches and new aluminium railings

Permits in Hollywood

Local repair windows we have checked

Condo parking garage under repair with bags of repair mortar, bundles of rebar, column formwork and yellow shoring posts
  • Fort Lauderdale: repairs within 180 days of the safety report unless the Building Official specifies otherwise
  • Palm Beach County: repairs commence within 365 days
  • City of Miami: submitting the recertification report gives 60 days to obtain repair permits without a violation
  • Orlando: 365 days to pull a permit after submitting
[5][6][7][8]

Bids and disclosures

A design professional or chapter 489 contractor bidding on repairs recommended by the milestone inspection may not have an interest in the inspection firm, or be a relative of someone who does, unless that is disclosed to the association in writing. A contract signed without the disclosure is voidable. We collect these disclosures and pass them to the board with each bid.[4]

Paying for repairs

Owner-controlled associations that must have a SIRS may use a line of credit or loan for milestone repairs with a majority of the total voting interests, and for budgets adopted on or before 31 December 2028 may pause reserve contributions for up to two budgets to fund milestone repairs.[9]

Drained condominium pool fenced off with orange safety netting, covered lounge chairs and an empty work platform on the tower
Repairs after Phase 2 in Hollywood: the local rules at a glance
TopicRule in HollywoodSource
NoticeHollywood's page gives 90 days from the notice to complete the inspection.City of Hollywood
NoticeAfter Surfside the city re-issued its certified letters and set up a Recertification Taskforce.City of Hollywood
RepairsFor conditions that threaten life or safety, permits are due within 180 days of the report.City of Hollywood
From the official pages, read 28 October 2026. Confirm dates with the City of Hollywood Building Division. Sources: City of Hollywood, Building Safety Inspection Program, City of Hollywood; Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page), Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024). Last updated October 28, 2026.

Frequently asked questions

How long do we have to start repairs in Hollywood?

Where the report finds conditions that threaten life, health or safety, the owner has 180 days from the report date to obtain the required permits. Repairs need building permits, so the contractor and drawings should be lined up before the deadline is close.

How long do we have to pull repair permits in Hollywood?

For conditions that threaten life, health or safety, 180 days from the report date.

What does Hollywood charge to review the reports?

A $300 administrative fee for the city's review of the third-party reports.

Sources

  1. Building Safety Inspection Program, City of Hollywood, City of Hollywood. Accessed October 28, 2026.
  2. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  3. Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  5. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
  6. Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
  7. Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
  8. Complete Your Milestone Inspection, City of Orlando, City of Orlando. Accessed October 28, 2026.
  9. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.