Condo Safety Florida

Phase 1 milestone inspection in Hollywood

Due within 180 days of your building department's notice.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate Phase 1 inspections for condo and co-op associations in Hollywood, working to the rules of the City of Hollywood Building Division from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Hollywood we line it up with the notice and filing rules of the City of Hollywood Building Division. Hollywood's page gives 90 days from the notice to complete the inspection. After Surfside the city re-issued its certified letters and set up a Recertification Taskforce.

Last updated

Who this is for

Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.

What Hollywood sets for Phase 1

Mid-rise and high-rise condominiums along a wide beachfront promenade in Hollywood, Florida
  • The city issues a Notice of Required Inspection, and its page gives the owner 90 days from receiving it to complete the inspection, shorter than the 180 days in BORA's policy text, so work to the date on your notice.
  • After the Surfside collapse the city re-issued certified letters to the properties on its list, set up a Recertification Taskforce and assigned dedicated staff.
  • The owner is responsible for hiring the third-party Florida registered professionals who perform the inspections and prepare the reports.
  • The BORA policy has the electrical safety report prepared by a Florida-licensed professional specializing in electrical design, on the BORA electrical form.
  • BORA's policy lets the Building Official extend the report deadline by up to 60 days, and gives up to 60 days to obtain repair permits on a sealed request from the professional.
[1][2]

How we handle Phase 1 inspections in Hollywood

Hollywood's beachfront and Intracoastal towers meet the state milestone law through the Broward program, which starts at 25 years. The detail to watch is the clock. The city's page gives 90 days from the Notice of Required Inspection, so we book the engineer as soon as the letter arrives rather than planning on the 180 days quoted elsewhere in Broward.[1][2]

Sounding hammer, crack gauge and moisture meter on a closed binder on a condo exterior walkway

Permits in Hollywood

What happens in a Phase 1 inspection?

Sounding hammer, flashlight, tape measure, chalk, a concrete core sample and a notebook laid out on concrete
  • Review of available drawings, prior reports and repair records
  • Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
  • Visual assessment of load-bearing elements and primary structural members and systems
  • A sealed report with a separate summary of material findings and recommendations
[3]

What must the Phase 1 report say?

  • The seal and signature of the engineer or architect
  • The manner and type of inspection
  • Any substantial structural deterioration, its extent and recommended repairs
  • Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
  • Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
  • Items requiring further inspection
[3]

Timeline from notice to owner summary

Condominium lobby mail room with brass mailboxes and a certified letter with a green return receipt card on the counter
  • Day 0: certified letter from the building department
  • By day 14: association notifies unit owners of the inspection and due date
  • By day 180: Phase 1 report submitted to the building department
  • Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
[3]
Phase 1 inspections in Hollywood: the local rules at a glance
TopicRule in HollywoodSource
First inspectionHollywood inspects buildings at 25 years and every 10 years after, under its 25-Year or Older Building Safety Program.City of Hollywood
RepairsFor conditions that threaten life or safety, permits are due within 180 days of the report.City of Hollywood
FeesHollywood charges a $300 administrative fee to review the reports.City of Hollywood
From the official pages, read 28 October 2026. Confirm dates with the City of Hollywood Building Division. Source: City of Hollywood, Building Safety Inspection Program, City of Hollywood. Last updated October 28, 2026.

Frequently asked questions

How long do we have to finish Phase 1 in Hollywood?

The city issues a Notice of Required Inspection, and its page gives the owner 90 days from receiving it to complete the inspection, shorter than the 180 days in BORA's policy text, so work to the date on your notice. If the engineer cannot meet the date, ask for an extension before it passes.

How long do we have after a Hollywood notice?

The city's page gives 90 days from receiving the Notice of Required Inspection to complete the inspection. Follow the date on your notice.

Did Hollywood send new letters after Surfside?

Yes. The city says it re-issued certified letters to the properties on its list and set up a Recertification Taskforce.

Sources

  1. Building Safety Inspection Program, City of Hollywood, City of Hollywood. Accessed October 28, 2026.
  2. Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
  3. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  4. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
  5. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.