Phase 1 milestone inspection in Tampa
Due within 180 days of your building department's notice.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate Phase 1 inspections for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Tampa we line it up with the notice and filing rules of the City of Tampa Construction Services. Phase I is due within 180 days after the owners receive the city's written notice. Tampa reports are filed in Accela Citizen Access as an RCT record.
Last updated
Who this is for
Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.
What Tampa sets for Phase 1

- Phase I must be completed within 180 days after the owners receive the city's written notice under s. 5-110.9.8.
- Reports are filed in Accela Citizen Access, where a registered user applies for an RCT record, and each report must be performed, signed and sealed by a Florida design professional.
- Buildings that should be in the program but have not received a notice are asked to contact CSDLSP@tampagov.net or 813-307-3980, and the city posts its Milestone Inspection Notification Letter.
- Construction Services is at 2555 E. Hanna Avenue and takes milestone questions at (813) 274-3100, option 1, or CSDLSP@tampagov.net.
How we handle Phase 1 inspections in Tampa
Tampa keeps to the statute's shape with its own filing route. The city's notice starts a 180-day Phase I clock, Phase II follows within 180 days of the Phase I report, and both are filed by a Florida design professional as an RCT record in Accela. We get the engineer registered and the record opened early, because the clock does not stop while the account is set up.[1]

Permits in Tampa
- City of Tampa Construction Services: Milestone notices, RCT filings in Accela and repair permits
What happens in a Phase 1 inspection?

- Review of available drawings, prior reports and repair records
- Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
- Visual assessment of load-bearing elements and primary structural members and systems
- A sealed report with a separate summary of material findings and recommendations
What must the Phase 1 report say?
- The seal and signature of the engineer or architect
- The manner and type of inspection
- Any substantial structural deterioration, its extent and recommended repairs
- Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
- Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
- Items requiring further inspection
Timeline from notice to owner summary

- Day 0: certified letter from the building department
- By day 14: association notifies unit owners of the inspection and due date
- By day 180: Phase 1 report submitted to the building department
- Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
| Topic | Rule in Tampa | Source |
|---|---|---|
| First inspection | Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after. | City of Tampa |
| Repairs | Tampa's page sets no repair deadline of its own, so the state 365-day rule governs. | City of Tampa |
| Notice | Phase I is due within 180 days after the owners receive the city's written notice. | City of Tampa |
Frequently asked questions
How long do we have to finish Phase 1 in Tampa?
Phase I must be completed within 180 days after the owners receive the city's written notice under s. 5-110.9.8. If the engineer cannot meet the date, ask for an extension before it passes.
We never received a Tampa notice. What should we do?
The city asks buildings that should be in the program but were not notified to contact CSDLSP@tampagov.net or 813-307-3980.
How do we file a milestone report in Tampa?
Through Accela Citizen Access, where a registered user applies for an RCT record. The report is performed, signed and sealed by a Florida design professional.
Sources
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.