Phase 2 milestone inspection in Tampa
Testing and a repair program when Phase 1 finds deterioration.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate Phase 2 inspections for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Phase 2 adds destructive or nondestructive testing when Phase 1 finds substantial structural deterioration, and in Tampa it follows local filing rules as well as s. 553.899. Phase II is due within 180 days after the Phase I report. Tampa reports are filed in Accela Citizen Access as an RCT record.
Last updated
Who this is for
Associations whose Phase 1 report found substantial structural deterioration, and boards preparing for the cost of the repairs that usually follow.
Phase 2 repair costs in the state data
OPPAGA counted 903 Phase 2 repair permit applications for 2024 and 2025, from under $1,000 to $30 million. The average permit value was $337,229 in 2024 and $496,236 in 2025, and the most common repairs were concrete, electrical and structural.
Phase 2 in Tampa

- If Phase I finds substantial structural deterioration, the Phase II report is due to the city within 180 days after the Phase I report is submitted.
- Reports are filed in Accela Citizen Access, where a registered user applies for an RCT record, and each report must be performed, signed and sealed by a Florida design professional.
- The city's page sets inspection deadlines but no repair deadline of its own, so the state rule applies, under which repairs for substantial structural deterioration must start within 365 days of the Phase II report.
How we handle Phase 2 inspections in Tampa
Tampa keeps to the statute's shape with its own filing route. The city's notice starts a 180-day Phase I clock, Phase II follows within 180 days of the Phase I report, and both are filed by a Florida design professional as an RCT record in Accela. We get the engineer registered and the record opened early, because the clock does not stop while the account is set up.[1]

Permits in Tampa
- City of Tampa Construction Services: Milestone notices, RCT filings in Accela and repair permits
What does Phase 2 testing involve?
The inspector decides the testing, which can be destructive, such as cores or opening up a slab edge, or nondestructive. The statute tells the inspector to prefer locations that are least disruptive and most easily repaired while still representative of the structure. Plan for unit access, noise and temporary protection.[2]

Phase 2 deadlines

- Within 180 days of the Phase 1 report: progress report to the building department with a timeline for completing Phase 2
- On completion: sealed Phase 2 report and summary to the association, any non-condo owner and the building official
- Within 45 days of receiving it: summary to every owner
- Within 365 days of the Phase 2 report: repairs for substantial structural deterioration must have commenced, or the building department must check whether the building is unsafe for occupancy
| Topic | Rule in Tampa | Source |
|---|---|---|
| Notice | Phase I is due within 180 days after the owners receive the city's written notice. | City of Tampa |
| Notice | Tampa asks buildings that were not notified to contact the city directly. | City of Tampa |
| Contact | Tampa Construction Services takes milestone questions at (813) 274-3100, option 1. | City of Tampa |
Frequently asked questions
What happens after a Phase 2 finding in Tampa?
If Phase I finds substantial structural deterioration, the Phase II report is due to the city within 180 days after the Phase I report is submitted. The Phase 2 report also sets out the repairs the engineer recommends, which become the repair scope.
When is Phase II due in Tampa?
Within 180 days after the Phase I report is submitted, if Phase I found substantial structural deterioration.
How do we file a milestone report in Tampa?
Through Accela Citizen Access, where a registered user applies for an RCT record. The report is performed, signed and sealed by a Florida design professional.
Does Tampa set a repair deadline?
The city's page does not. The state rule applies, so repairs for substantial structural deterioration must start within 365 days of the Phase II report.
Sources
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.