Phase 1 milestone inspection in Miami
Due within 180 days of your building department's notice.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate Phase 1 inspections for condo and co-op associations in Miami, working to the rules of the City of Miami Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Miami we line it up with the notice and filing rules of the City of Miami Building Department. Overdue buildings built from 1982 to 1984 cannot use the city's online filing route. The city says a response takes about six weeks.
Last updated
Who this is for
Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.
What Miami sets for Phase 1

- Buildings built in 1982, 1983 or 1984 that show as overdue cannot use the city's online process and have to contact the recertification team directly.
- The city says to expect a response in about six weeks, and takes questions at buildingrecertifications@miamigov.com or (305) 416-1177.
- The city allows one extension, for a $500 fee, and only if it is requested before the due date.
- For threshold buildings, the county guidelines the city applies call for separate structural and electrical engineers, and the structural engineer shows proof of structural specialization.
- Because the city applies Miami-Dade's Code s. 8-11(f), the county's age rules decide the due year. Coastal condo and co-op buildings built from 1998 within three miles of the coast come due at 25 years, and most other buildings built from 1993 at 30.
How we handle Phase 1 inspections in Miami
A City of Miami condo tower files the state milestone inspection and the county recertification through the same iBuild and ProjectDox route. Lining them up matters because the city leaves little slack, one paid extension asked for before the due date and 60 days after filing to pull repair permits, so we schedule the engineer to deliver both reports together where the city accepts it.[1][4]

Permits in Miami
- City of Miami Building Department, Unsafe Structures Services: Recertification and milestone filings, extensions and repair permits inside city limits
What happens in a Phase 1 inspection?

- Review of available drawings, prior reports and repair records
- Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
- Visual assessment of load-bearing elements and primary structural members and systems
- A sealed report with a separate summary of material findings and recommendations
What must the Phase 1 report say?
- The seal and signature of the engineer or architect
- The manner and type of inspection
- Any substantial structural deterioration, its extent and recommended repairs
- Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
- Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
- Items requiring further inspection
Timeline from notice to owner summary

- Day 0: certified letter from the building department
- By day 14: association notifies unit owners of the inspection and due date
- By day 180: Phase 1 report submitted to the building department
- Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
| Topic | Rule in Miami | Source |
|---|---|---|
| Filing | City of Miami reports go in through iBuild and ProjectDox under set file names such as RC-S and RC-E. | City of Miami |
| Repairs | After a report is filed, the city gives 60 days to obtain repair permits without a violation. | City of Miami |
| State data | Miami-Dade accounted for 23 of Florida's 24 unsafe or uninhabitable findings in 2025. | OPPAGA 26-04 |
Frequently asked questions
How long do we have to finish Phase 1 in Miami?
The city says to expect a response in about six weeks, and takes questions at buildingrecertifications@miamigov.com or (305) 416-1177. If the engineer cannot meet the date, ask for an extension before it passes.
Do we file with Miami-Dade County or the City of Miami?
Buildings inside City of Miami limits file with the city through iBuild and ProjectDox. The county handles unincorporated Miami-Dade.
How long does the City of Miami take to respond?
The city says about six weeks after the report is submitted.
Can we extend a City of Miami recertification?
Once. The city charges $500 for a one-time extension, and it has to be requested before the due date.
Sources
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.