Condo Safety Florida

Phase 1 milestone inspection in Palm Beach County

Due within 180 days of your building department's notice.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate Phase 1 inspections for condo and co-op associations in Palm Beach County, working to the rules of the Palm Beach County Building Division from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Palm Beach County we line it up with the notice and filing rules of the Palm Beach County Building Division. The county's certified letter arrives in the due year, and the inspection is due within 180 days of it. Reports use Form EB18-2024 and are uploaded through the county portal by the architect or engineer who prepared them.

Last updated

Who this is for

Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.

What Palm Beach County sets for Phase 1

Condominium towers on the Intracoastal Waterway in Palm Beach County behind a marina and a drawbridge
  • The county sends certified letters to associations in the year the inspection is due, and the inspection must be completed within 180 days of receiving the letter unless a fixed legacy deadline applies.
  • Phase 1, Phase 2 and Phase One Amended reports all use Form EB18-2024 and are uploaded through the county's Milestone Inspection Form Submission portal with the building's Reference ID, one building and one report type at a time, and only by the architect or engineer who prepared the report.
  • The county page covers unincorporated Palm Beach County only. Cities with their own building departments, such as Boca Raton, apply their own rules.
  • A 60-day Phase 1 extension needs a written request from the architect or engineer, good cause from the owner, no evidence of unsafe conditions and a sealed statement that the building may stay occupied; a Phase 2 extension needs the request and the sealed statement.
  • Buildings that reached 25 or 30 years before 1 July 2022 were due by 31 December 2024, and those reaching that age between 1 July 2022 and 31 December 2024 were due by 31 December 2025. Later buildings are due by 31 December of the year they reach the trigger age.
[1][2]

How we handle Phase 1 inspections in Palm Beach County

The Palm Beach County filing is strict about who submits and how. Only the architect or engineer who prepared the report can upload it, one building and one report type at a time, on Form EB18-2024 with the building's Reference ID. We make sure the professional we arrange has the Reference ID and the county's form before the inspection starts, so the 180-day window is spent inspecting rather than chasing paperwork.[1]

Sounding hammer, crack gauge and moisture meter on a closed binder on a condo exterior walkway

Permits in Palm Beach County

What happens in a Phase 1 inspection?

Sounding hammer, flashlight, tape measure, chalk, a concrete core sample and a notebook laid out on concrete
  • Review of available drawings, prior reports and repair records
  • Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
  • Visual assessment of load-bearing elements and primary structural members and systems
  • A sealed report with a separate summary of material findings and recommendations
[3]

What must the Phase 1 report say?

  • The seal and signature of the engineer or architect
  • The manner and type of inspection
  • Any substantial structural deterioration, its extent and recommended repairs
  • Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
  • Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
  • Items requiring further inspection
[3]

Timeline from notice to owner summary

Condominium lobby mail room with brass mailboxes and a certified letter with a green return receipt card on the counter
  • Day 0: certified letter from the building department
  • By day 14: association notifies unit owners of the inspection and due date
  • By day 180: Phase 1 report submitted to the building department
  • Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
[3]
Phase 1 inspections in Palm Beach County: the local rules at a glance
TopicRule in Palm Beach CountySource
First inspectionUnincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30.Palm Beach County
ContactThe county answers milestone questions at 561-233-5020.Palm Beach County
RepairsRepairs must start within 365 days of the county receiving the Phase 2 report.Palm Beach County
Phase 2After repairs the original inspector files a Phase One Amended report on Form EB18-2024.Palm Beach County
From the official pages, read 28 October 2026. Confirm dates with the Palm Beach County Building Division. Source: Palm Beach County, Mandatory Milestone Inspections, Palm Beach County Building Division. Last updated October 28, 2026.

Frequently asked questions

How long do we have to finish Phase 1 in Palm Beach County?

The county sends certified letters to associations in the year the inspection is due, and the inspection must be completed within 180 days of receiving the letter unless a fixed legacy deadline applies. If the engineer cannot meet the date, ask for an extension before it passes.

Does the county rule apply in West Palm Beach or Boca Raton?

The county page covers unincorporated Palm Beach County. Cities with their own building departments apply their own rules, so check your city.

When does the 180 days start in Palm Beach County?

From the county's certified letter, which goes out in the year the inspection is due, unless a fixed legacy deadline applies to your building.

Who uploads the report to Palm Beach County?

Only the architect or engineer who prepared it, through the county portal on Form EB18-2024 with the building's Reference ID.

Sources

  1. Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
  2. Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
  3. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  4. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.