Milestone inspections in Palm Beach County
Get your milestone inspection scheduled before the building department's deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate milestone inspections for condo and co-op associations in Palm Beach County, working to the rules of the Palm Beach County Building Division from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo and co-op buildings in Palm Beach County that are three habitable stories or more need a milestone inspection by a Florida-licensed engineer or architect, which we arrange and coordinate. Unincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30. Palm Beach County buildings that reached the trigger age before 1 July 2022 were due by 31 December 2024.
Last updated
What the state data shows
Local building departments reported 8,736 Phase 1 and 1,575 Phase 2 inspections completed across 2024 and 2025. They received 903 Phase 2 repair permit applications, with an average permit value of $337,229 in 2024 and $496,236 in 2025.
Milestone inspection rules in Palm Beach County

- Buildings that reached 25 or 30 years before 1 July 2022 were due by 31 December 2024, and those reaching that age between 1 July 2022 and 31 December 2024 were due by 31 December 2025. Later buildings are due by 31 December of the year they reach the trigger age.
- The county page covers unincorporated Palm Beach County only. Cities with their own building departments, such as Boca Raton, apply their own rules.
- The county sends certified letters to associations in the year the inspection is due, and the inspection must be completed within 180 days of receiving the letter unless a fixed legacy deadline applies.
- Phase 1, Phase 2 and Phase One Amended reports all use Form EB18-2024 and are uploaded through the county's Milestone Inspection Form Submission portal with the building's Reference ID, one building and one report type at a time, and only by the architect or engineer who prepared the report.
- In the state's 2025 data, 17 of the 39 Palm Beach municipal building officials did not report milestone figures, the largest gap of the three South Florida counties.
- Palm Beach was one of the three counties, with Broward and Miami-Dade, that reported the most required Phase 2 inspections in 2024.
- OPPAGA found that some jurisdictions in Palm Beach County accept one combined Phase 1 and Phase 2 inspection.
- A 60-day Phase 1 extension needs a written request from the architect or engineer, good cause from the owner, no evidence of unsafe conditions and a sealed statement that the building may stay occupied; a Phase 2 extension needs the request and the sealed statement.
How we handle milestone inspections in Palm Beach County
The Palm Beach County filing is strict about who submits and how. Only the architect or engineer who prepared the report can upload it, one building and one report type at a time, on Form EB18-2024 with the building's Reference ID. We make sure the professional we arrange has the Reference ID and the county's form before the inspection starts, so the 180-day window is spent inspecting rather than chasing paperwork.[1]

Permits for milestone inspections in Palm Beach County
- Palm Beach County Building Division: Milestone inspection notices and filings for unincorporated Palm Beach County
When is a milestone inspection due?
By 31 December of the year the building reaches 30 years from its certificate of occupancy, and every 10 years after that. If the certificate date is not available, the building official's records of occupancy set the date. Buildings that turned 30 before 1 July 2022 were due before 31 December 2024, and those that turned 30 between 1 July 2022 and 31 December 2024 were due before 31 December 2025.[4]
Is it 25 years within 3 miles of the coast?
Not automatically any more. The 2022 law set 25 years for buildings within 3 miles of the coastline. The 2023 law (SB 154) replaced that with a local choice, so the local enforcement agency now decides whether local circumstances, such as proximity to salt water, require 25 years. Many South Florida departments chose to keep the 3-mile line; Tampa and Pinellas use 30 years. Check your own department.[4][5][6][1][7][8]

How do Phase 1 and Phase 2 work?
- The building department sends written notice by certified mail, return receipt requested.
- The association tells unit owners within 14 days, with the due date.
- Phase 1, a visual examination and qualitative assessment, is completed within 180 days of the notice, when the architect or engineer submits the report to the building department.
- Phase 2, with destructive or nondestructive testing, is required only if Phase 1 finds substantial structural deterioration. A progress report with a timeline is due within 180 days of the Phase 1 report.
- The association sends the inspector's summary to every owner within 45 days of receiving a report.
- Repairs for substantial structural deterioration must start within 365 days of the Phase 2 report.
Who performs the inspection?
An architect licensed under chapter 481 or an engineer licensed under chapter 471 who is authorized to practise in Florida. A team may do the work with an architect or engineer as the registered design professional in responsible charge, and all work and reports are signed and sealed by the qualified team member. We arrange and coordinate the inspection; the professional performs it and seals the report.[4]

| Topic | Rule in Palm Beach County | Source |
|---|---|---|
| First inspection | Unincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30. | Palm Beach County |
| Repairs | Repairs must start within 365 days of the county receiving the Phase 2 report. | Palm Beach County |
| Penalties | The county lists daily fines of up to $500 or more and referral to a special magistrate. | Palm Beach County |
| Repairs | After repairs the original inspector files a Phase One Amended report on Form EB18-2024. | Palm Beach County |
| Contact | The county answers milestone questions at 561-233-5020. | Palm Beach County |
Milestone inspections services in Palm Beach County
Phase 1 milestone inspection in Palm Beach County
The visual examination and report due within 180 days of the building department's notice.
Phase 2 milestone inspection in Palm Beach County
Testing to assess substantial structural deterioration found in Phase 1, with a progress report due in 180 days.
Coastal 25-year inspections in Palm Beach County
Where the building department requires the first milestone at 25 years because of salt water, county by county.
Repairs after Phase 2 in Palm Beach County
The 365-day rule, local repair ordinances, permits and bid disclosures after a Phase 2 report.
Frequently asked questions
When is a milestone inspection due in Palm Beach County?
In unincorporated Palm Beach County, condo and co-op buildings three stories or more that sit within three miles of a coastline get their first milestone inspection at 25 years; buildings farther inland wait until 30. Every building then repeats every 10 years. The building department's notice letter is the document that fixes your date.
Does the county rule apply in West Palm Beach or Boca Raton?
The county page covers unincorporated Palm Beach County. Cities with their own building departments apply their own rules, so check your city.
Who uploads the report to Palm Beach County?
Only the architect or engineer who prepared it, through the county portal on Form EB18-2024 with the building's Reference ID.
Sources
- Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Chapter 2023-203, Laws of Florida (CS/CS/SB 154), approved June 9 2023, Laws of Florida. Accessed October 27, 2026.
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- Condo Milestone Inspections, Pinellas County, Pinellas County. Accessed October 28, 2026.