Milestone and recertification inspections in Boca Raton
Boca's schedule, its 50-foot rule and the $500 fee.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We check your building against Boca's published schedule and arrange the inspection with a Florida-licensed engineer or architect.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Boca Raton's Building Recertification Inspection Program (Ordinance 5589, Code s. 19-162) covers condo and co-op buildings 3 stories or 50 feet or more, counting uninhabitable stories such as underground parking, at 30 years or 25 years within 3 miles of the coast, with threshold buildings at 30. The fee is $500 per recertification, and the city publishes its schedule for 2027 to 2031 (City of Boca Raton).
Last updated
What the state data shows
Local building departments reported 8,736 Phase 1 and 1,575 Phase 2 inspections completed across 2024 and 2025. They received 903 Phase 2 repair permit applications, with an average permit value of $337,229 in 2024 and $496,236 in 2025.
Is your Boca building covered?
- Condo or co-op ownership
- 3 stories or 50 feet or more, counting underground parking and other uninhabitable stories
- Within 3 miles of the coast at 25 years, otherwise 30; threshold buildings at 30
Planning from the published schedule
The city publishes its backlog and a Building Recertification Schedule for 2027 to 2031. Find your building, then book the inspection early in the due year so repairs and the owner summary fit inside the deadlines.[1]
Milestone inspection rules in Boca Raton

- Covered buildings recertify at 30 years, or at 25 years for condo and co-op properties within three miles of a coastline as defined in s. 376.031; threshold buildings recertify at 30 years.
- The program covers condo and co-op buildings three stories or more, or 50 feet or more in height, and it counts uninhabitable stories such as underground parking toward that height.
- The report combines a Structural Report and an Electrical Report on the city's own forms, with a narrative and color photos. The engineers tell the Building Official three business days before each inspection so city inspectors can attend, and any draft given to the owner goes to the city at the same time.
- The city publishes a revised backlog schedule and a Building Recertification Schedule for 2027 to 2031, which it says may be amended.
- The city notifies each owner at least 365 days before the building's recertification deadline with a Notice of Required Inspection by certified mail, and posts it at the building if the letter comes back unclaimed.
- If the report falls short, the owner has 30 days to correct and resubmit it, with up to three resubmittals before the matter goes to the Permitting and Construction Review Board. Extensions of up to 60 days are possible to submit the report or obtain permits.
- Applications are made online or by mail to the Building Recertification Department at 200 NW 2nd Avenue, with the submittal form, checklists, written reports, photos and payment; the coordinator is on 561-393-7894.
- Palm Beach County, home to Boca Raton, was one of the three counties with the most required Phase 2 inspections in 2024.
How we handle milestone inspections in Boca Raton
In Boca Raton the city program and the state milestone law cover similar buildings with slightly different tests. Boca counts underground parking toward its three-story or 50-foot threshold, so a building the state would not count can still be on the city's schedule. We check the published 2027 to 2031 schedule and scope one inspection for both where the city allows it.[1][5]

Permits for milestone inspections in Boca Raton
- City of Boca Raton Building Division: Building Recertification Inspection Program notices, schedule and filings
When is a milestone inspection due?
By 31 December of the year the building reaches 30 years from its certificate of occupancy, and every 10 years after that. If the certificate date is not available, the building official's records of occupancy set the date. Buildings that turned 30 before 1 July 2022 were due before 31 December 2024, and those that turned 30 between 1 July 2022 and 31 December 2024 were due before 31 December 2025.[5]
Is it 25 years within 3 miles of the coast?
Not automatically any more. The 2022 law set 25 years for buildings within 3 miles of the coastline. The 2023 law (SB 154) replaced that with a local choice, so the local enforcement agency now decides whether local circumstances, such as proximity to salt water, require 25 years. Many South Florida departments chose to keep the 3-mile line; Tampa and Pinellas use 30 years. Check your own department.[5][2][6][7][8][9]

How do Phase 1 and Phase 2 work?
- The building department sends written notice by certified mail, return receipt requested.
- The association tells unit owners within 14 days, with the due date.
- Phase 1, a visual examination and qualitative assessment, is completed within 180 days of the notice, when the architect or engineer submits the report to the building department.
- Phase 2, with destructive or nondestructive testing, is required only if Phase 1 finds substantial structural deterioration. A progress report with a timeline is due within 180 days of the Phase 1 report.
- The association sends the inspector's summary to every owner within 45 days of receiving a report.
- Repairs for substantial structural deterioration must start within 365 days of the Phase 2 report.
Who performs the inspection?
An architect licensed under chapter 481 or an engineer licensed under chapter 471 who is authorized to practise in Florida. A team may do the work with an architect or engineer as the registered design professional in responsible charge, and all work and reports are signed and sealed by the qualified team member. We arrange and coordinate the inspection; the professional performs it and seals the report.[5]

| Topic | Rule in Boca Raton | Source |
|---|---|---|
| Buildings covered | Boca Raton's recertification program dates from Ordinance 5589 of 24 August 2021, before the state law. | City of Boca Raton |
| Phase 1 and 2 | Some Palm Beach County jurisdictions accept a combined Phase 1 and Phase 2 inspection. | OPPAGA 26-04 |
| Phase 1 and 2 | Boca's recertification combines Phase 1 and Phase 2 of the milestone inspection into one inspection. | Boca Raton guidelines |
| Coastal rule | Boca's guidelines add a specific inspection of underground and lower-level garages. | Boca Raton guidelines |
| Fees | The city charges $500 per recertification. | City of Boca Raton |
| Who signs | The city uses separate electrical and structural safety report checklists. | City of Boca Raton |
Milestone inspections services in Boca Raton
Phase 1 milestone inspection in Boca Raton
The visual examination and report due within 180 days of the building department's notice.
Phase 2 milestone inspection in Boca Raton
Testing to assess substantial structural deterioration found in Phase 1, with a progress report due in 180 days.
Coastal 25-year inspections in Boca Raton
Where the building department requires the first milestone at 25 years because of salt water, county by county.
Repairs after Phase 2 in Boca Raton
The 365-day rule, local repair ordinances, permits and bid disclosures after a Phase 2 report.
Frequently asked questions
Does Boca's program replace the state milestone inspection?
No. Boca's program predates the state law and still applies, and condo and co-op buildings must also meet s. 553.899. Plan them together.
Our building is two residential floors over a garage. Is it covered?
Boca counts uninhabitable stories such as underground parking, so it may be covered by the city program. Check with the city.
When is a milestone inspection due in Boca Raton?
Covered buildings recertify at 30 years, or at 25 years for condo and co-op properties within three miles of a coastline as defined in s. 376.031; threshold buildings recertify at 30 years. The building department's notice letter is the document that fixes your date.
Is Boca Raton on a 25 or 30-year schedule?
Condo and co-op properties within three miles of a coastline recertify at 25 years, others at 30, and threshold buildings at 30.
Sources
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Recertification Guidelines, Building Recertification Inspection Program, City of Boca Raton. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Chapter 2023-203, Laws of Florida (CS/CS/SB 154), approved June 9 2023, Laws of Florida. Accessed October 27, 2026.
- Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- Condo Milestone Inspections, Pinellas County, Pinellas County. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.