Milestone inspections in Miami Beach
Get your milestone inspection scheduled before the building department's deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate milestone inspections for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Condo and co-op buildings in Miami Beach that are three habitable stories or more need a milestone inspection by a Florida-licensed engineer or architect, which we arrange and coordinate. The county code sets 25 years for coastal condo buildings built from 1998, which the city's own page does not repeat, so check your notice. Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code.
Last updated
What the state data shows
Local building departments reported 8,736 Phase 1 and 1,575 Phase 2 inspections completed across 2024 and 2025. They received 903 Phase 2 repair permit applications, with an average permit value of $337,229 in 2024 and $496,236 in 2025.
Milestone inspection rules in Miami Beach

- The county code behind the city program puts coastal condo and co-op buildings three stories or more, built from 1998 within three miles of the coast, on a 25-year first recertification. Miami Beach sits on barrier islands between the Atlantic and Biscayne Bay, so confirm on your notice which date the city applied.
- Reports go to the building department through the city's Citizen Self Service portal or by email.
- Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 milestone inspections in 2025.
- Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
- After permitted repairs pass final inspection, the owner submits an updated report from a Florida-licensed design professional stating the building is structurally and electrically safe, and the Building Official then issues the recertification approval letter.
How we handle milestone inspections in Miami Beach
On Miami Beach the milestone inspection, the city recertification and the county's coastal schedule overlap. Threshold towers need a structural engineer and an electrical engineer, and the city wants an updated report after repairs before it issues the approval letter, so we scope the engineer's work once and keep the city's form set complete.[2][1][4]

Permits for milestone inspections in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
When is a milestone inspection due?
By 31 December of the year the building reaches 30 years from its certificate of occupancy, and every 10 years after that. If the certificate date is not available, the building official's records of occupancy set the date. Buildings that turned 30 before 1 July 2022 were due before 31 December 2024, and those that turned 30 between 1 July 2022 and 31 December 2024 were due before 31 December 2025.[4]
Is it 25 years within 3 miles of the coast?
Not automatically any more. The 2022 law set 25 years for buildings within 3 miles of the coastline. The 2023 law (SB 154) replaced that with a local choice, so the local enforcement agency now decides whether local circumstances, such as proximity to salt water, require 25 years. Many South Florida departments chose to keep the 3-mile line; Tampa and Pinellas use 30 years. Check your own department.[4][5][6][7][8][9]

How do Phase 1 and Phase 2 work?
- The building department sends written notice by certified mail, return receipt requested.
- The association tells unit owners within 14 days, with the due date.
- Phase 1, a visual examination and qualitative assessment, is completed within 180 days of the notice, when the architect or engineer submits the report to the building department.
- Phase 2, with destructive or nondestructive testing, is required only if Phase 1 finds substantial structural deterioration. A progress report with a timeline is due within 180 days of the Phase 1 report.
- The association sends the inspector's summary to every owner within 45 days of receiving a report.
- Repairs for substantial structural deterioration must start within 365 days of the Phase 2 report.
Who performs the inspection?
An architect licensed under chapter 481 or an engineer licensed under chapter 471 who is authorized to practise in Florida. A team may do the work with an architect or engineer as the registered design professional in responsible charge, and all work and reports are signed and sealed by the qualified team member. We arrange and coordinate the inspection; the professional performs it and seals the report.[4]

| Topic | Rule in Miami Beach | Source |
|---|---|---|
| First inspection | Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. | City of Miami Beach |
| First inspection | The county code sets 25 years for coastal condo buildings built from 1998, which the city's own page does not repeat, so check your notice. | Miami-Dade County |
| Filing | Reports are filed through the city's Citizen Self Service portal or by email. | City of Miami Beach |
Milestone inspections services in Miami Beach
Phase 1 milestone inspection in Miami Beach
The visual examination and report due within 180 days of the building department's notice.
Phase 2 milestone inspection in Miami Beach
Testing to assess substantial structural deterioration found in Phase 1, with a progress report due in 180 days.
Coastal 25-year inspections in Miami Beach
Where the building department requires the first milestone at 25 years because of salt water, county by county.
Repairs after Phase 2 in Miami Beach
The 365-day rule, local repair ordinances, permits and bid disclosures after a Phase 2 report.
Frequently asked questions
When is a milestone inspection due in Miami Beach?
Miami Beach recertifies buildings 30 years after the original certificate of occupancy and every 10 years after that, under Miami-Dade Code s. 8-11(f). The city notes the program used to be called the 40-year recertification. The building department's notice letter is the document that fixes your date.
Is Miami Beach on a 25 or 30-year schedule?
The city page states 30 years. The county code it applies sets 25 years for coastal condo and co-op buildings built from 1998, so the date on your notice is the one to follow.
How do we file in Miami Beach?
Through the city's Citizen Self Service portal or by email to the building department.
Sources
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Chapter 2023-203, Laws of Florida (CS/CS/SB 154), approved June 9 2023, Laws of Florida. Accessed October 27, 2026.
- Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- Condo Milestone Inspections, Pinellas County, Pinellas County. Accessed October 28, 2026.