Phase 1 milestone inspection in Boca Raton

Due within 180 days of your building department's notice.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate Phase 1 inspections for condo and co-op associations in Boca Raton, working to the rules of the City of Boca Raton Building Recertification Department from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Phase 1 is the visual examination and sealed report that opens every milestone inspection, and in Boca Raton we line it up with the notice and filing rules of the City of Boca Raton Building Recertification Department. Boca's engineers give the city three business days' notice of each inspection, and drafts go to the city too. Recertification is filed online or by mail to the Building Recertification Department.

Last updated

Who this is for

Associations that have received, or expect, the building department's certified letter, and managers who need the 180-day clock and owner notices handled.

What Boca Raton sets for Phase 1

Low and mid-rise oceanfront condominiums with tile roofs behind a sea grape dune in Boca Raton
  • The report combines a Structural Report and an Electrical Report on the city's own forms, with a narrative and color photos. The engineers tell the Building Official three business days before each inspection so city inspectors can attend, and any draft given to the owner goes to the city at the same time.
  • Applications are made online or by mail to the Building Recertification Department at 200 NW 2nd Avenue, with the submittal form, checklists, written reports, photos and payment; the coordinator is on 561-393-7894.
  • If the report falls short, the owner has 30 days to correct and resubmit it, with up to three resubmittals before the matter goes to the Permitting and Construction Review Board. Extensions of up to 60 days are possible to submit the report or obtain permits.
  • The city publishes a revised backlog schedule and a Building Recertification Schedule for 2027 to 2031, which it says may be amended.
  • The city notifies each owner at least 365 days before the building's recertification deadline with a Notice of Required Inspection by certified mail, and posts it at the building if the letter comes back unclaimed.
[1][2]

How we handle Phase 1 inspections in Boca Raton

In Boca Raton the city program and the state milestone law cover similar buildings with slightly different tests. Boca counts underground parking toward its three-story or 50-foot threshold, so a building the state would not count can still be on the city's schedule. We check the published 2027 to 2031 schedule and scope one inspection for both where the city allows it.[2][4]

Sounding hammer, crack gauge and moisture meter on a closed binder on a condo exterior walkway

Permits in Boca Raton

What happens in a Phase 1 inspection?

Sounding hammer, flashlight, tape measure, chalk, a concrete core sample and a notebook laid out on concrete
  • Review of available drawings, prior reports and repair records
  • Walk-through of common areas, garages, roofs, balconies, walkways and a sample of units
  • Visual assessment of load-bearing elements and primary structural members and systems
  • A sealed report with a separate summary of material findings and recommendations
[4]

What must the Phase 1 report say?

  • The seal and signature of the engineer or architect
  • The manner and type of inspection
  • Any substantial structural deterioration, its extent and recommended repairs
  • Whether unsafe or dangerous conditions, as the Florida Building Code defines them, were observed
  • Recommended remedial or preventive repairs for damaged items that are not substantial deterioration
  • Items requiring further inspection
[4]

Timeline from notice to owner summary

Condominium lobby mail room with brass mailboxes and a certified letter with a green return receipt card on the counter
  • Day 0: certified letter from the building department
  • By day 14: association notifies unit owners of the inspection and due date
  • By day 180: Phase 1 report submitted to the building department
  • Within 45 days of receiving the report: inspector summary to every owner, posted on the property and on the association website if one is required
[4]
Phase 1 inspections in Boca Raton: the local rules at a glance
TopicRule in Boca RatonSource
Who signsThe city uses separate electrical and structural safety report checklists.City of Boca Raton
Who signsBoca applies the state threshold building definition of more than three stories or 50 feet.City of Boca Raton
Buildings coveredBoca Raton's recertification program dates from Ordinance 5589 of 24 August 2021, before the state law.City of Boca Raton
Buildings coveredBoca counts uninhabitable stories such as underground parking when deciding whether a building is covered.City of Boca Raton
First inspectionBoca recertifies at 30 years, or 25 within three miles of the coast, with threshold buildings at 30.City of Boca Raton
FeesThe city charges $500 per recertification.City of Boca Raton
From the official pages, read 28 October 2026. Confirm dates with the City of Boca Raton Building Recertification Department. Sources: City of Boca Raton, Building Recertification Inspection Program, City of Boca Raton; Florida Department of State / Laws of Florida, Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022. Last updated October 28, 2026.

Frequently asked questions

How long do we have to finish Phase 1 in Boca Raton?

The report combines a Structural Report and an Electrical Report on the city's own forms, with a narrative and color photos. The engineers tell the Building Official three business days before each inspection so city inspectors can attend, and any draft given to the owner goes to the city at the same time. If the engineer cannot meet the date, ask for an extension before it passes.

Where can we see when our Boca Raton building is due?

The city publishes a recertification schedule for 2027 to 2031 and a revised backlog schedule on its program page.

How do we file in Boca Raton?

Online, or by mail to the Building Recertification Department at 200 NW 2nd Avenue with the submittal form, checklists, reports, photos and payment.

Sources

  1. Recertification Guidelines, Building Recertification Inspection Program, City of Boca Raton. Accessed October 28, 2026.
  2. Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
  3. Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  5. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.