Building recertification in Miami Beach
Structural and electrical engineers for threshold buildings, plus city forms.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange recertification with the engineers Miami Beach requires and include the guardrail and illumination forms so the filing is complete.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Miami Beach recertifies at 30 years and every 10 years after under Miami-Dade Code s. 8-11(f)(ii)(1). Threshold buildings, over 3 stories or 50 feet or large assembly buildings, need structural certification by a Florida-licensed structural engineer and electrical certification by an electrical engineer; others may use an architect or engineer. Filing is through the Citizen Self Service portal or email (City of Miami Beach).
Last updated
Miami Beach recertification checklist
- Structural certification (structural engineer for threshold buildings)
- Electrical certification (electrical engineer for threshold buildings)
- Parking lot guardrail form, if applicable
- Parking lot illumination form, if applicable
- The annual maintenance log the city refers to
- Submission through the Citizen Self Service portal or by email
Recertification in Miami Beach

- Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
- The county code behind the city program puts coastal condo and co-op buildings three stories or more, built from 1998 within three miles of the coast, on a 25-year first recertification. Miami Beach sits on barrier islands between the Atlantic and Biscayne Bay, so confirm on your notice which date the city applied.
- Under County Code s. 8C-6, a parking lot that abuts a canal, lake or other water needs compliant guardrails, and a missing guardrail needs a permit before recertification closes.
- The city's form set has separate Parking Lot Guardrails and Parking Lot Illumination recertification forms alongside the structural and electrical reports.
- Reports go to the building department through the city's Citizen Self Service portal or by email.
- The same page refers owners to a mandatory annual maintenance log, a record that is useful evidence when the reserve study is updated.
- The county guidelines that sit behind the city program require infrared thermography on electrical systems of 400 amperes or more, with photos in the electrical report.
How we handle building recertification in Miami Beach
Miami Beach recertification is a full packet, not one report. A threshold tower needs both engineers, the parking lot guardrail and illumination forms where there is a lot, and an updated report once repairs pass final inspection. We line up the professionals and the forms together so nothing is missing when the packet goes in through the Citizen Self Service portal.[1]

Permits for building recertification (40-year) in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
How is recertification different from a milestone inspection?
The milestone inspection is a state requirement in s. 553.899 for condo and co-op buildings. County recertification is local law that covers most building types, includes an electrical recertification, and has its own schedule, fees and penalties. A condo building in Miami-Dade or Broward may need to satisfy both, so ask the professional how one inspection can serve both programs.[3][2][4]

Miami-Dade recertification schedule

- Buildings built before 1983 keep their established recertification schedule.
- Coastal condo and co-op buildings 3 stories or more within 3 miles, built 1983 to 1997, and other buildings built 1983 to 1992, were due by 31 December 2024.
- Coastal condo and co-op buildings built 1998 or later recertify at 25 years.
- Other buildings built 1993 or later recertify at 30 years.
- Every 10 years after that.
- Courtesy notices are sent two years and one year ahead; reports are due within 90 days of the notice.
Broward Building Safety Inspection Program (Fort Lauderdale)

- First inspection at 25 years, then every 10 years
- Notices sent by certified mail from 1 June to 31 August each year
- Safety report due within 180 days of the notice
- Repairs within 180 days of the report unless the Building Official sets otherwise
- Review fee $375
| Topic | Rule in Miami Beach | Source |
|---|---|---|
| Local program | Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. | City of Miami Beach |
| Repairs | After repairs pass final inspection, an updated report goes in before the city issues its approval letter. | City of Miami Beach |
| Who signs | Threshold buildings in Miami Beach need a Florida-licensed structural engineer and a Florida-licensed electrical engineer. | City of Miami Beach |
Building recertification (40-year) services in Miami Beach
Structural recertification in Miami Beach
The structural report for Miami-Dade and Broward recertification, signed by a qualified engineer or architect.
Electrical recertification and thermography in Miami Beach
The electrical half of recertification, including infrared thermography where the program requires it.
Parking lot guardrails and lighting in Miami Beach
The parking lot illumination and guardrail certifications some recertification programs require.
Frequently asked questions
What is a threshold building in Miami Beach?
The city describes threshold buildings as over 3 stories or 50 feet, or large assembly buildings.
Can an architect sign our recertification?
For non-threshold buildings, the city allows an architect or engineer. Threshold buildings need a Florida-licensed structural engineer and an electrical engineer.
Does Miami Beach have a 40-year recertification?
Miami Beach recertifies buildings 30 years after the original certificate of occupancy and every 10 years after that, under Miami-Dade Code s. 8-11(f). The city notes the program used to be called the 40-year recertification. Whatever the local name, condo and co-op buildings must also meet the state milestone law.
Is a structural engineer required in Miami Beach?
For threshold buildings, yes, and an electrical engineer as well. Buildings below the threshold may use any Florida-licensed design professional.
Sources
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
