40-year recertification in Miami-Dade County

The county schedule, the 90-day report and the published fees.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange the structural and electrical recertification reports with qualified Florida-licensed engineers and coordinate filing, fees and any extension with the county.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Miami-Dade County recertification under Code s. 8-11(f) applies to almost every building except single-family homes, duplexes and minor buildings. Reports are due within 90 days of the county's notice, the engineer can ask for an extension of up to 60 days for $75.58, and the initial review fee is $403.13 from 1 October 2025. Non-compliance can bring an initial penalty of $510, up to $10,000 per violation, and a lien (Miami-Dade County).

Last updated

What the county needs from you

  • A structural report and an electrical report; threshold buildings need a qualified structural engineer and an electrical engineer
  • A self-qualification letter and proof of structural specialisation for threshold buildings
  • Structural glazing recertification every 5 years for threshold buildings, fee $380.90
  • Filing within 90 days of the notice, after courtesy notices two years and one year ahead
[1]

Recertification in Miami-Dade County

Aerial view of tall oceanfront condominium towers along a northern Miami-Dade County beach
  • Courtesy notices go out two years and one year before the due year, and the recertification reports are due within 90 days of the Notice of Building Recertification.
  • The county schedule turns on the year built. Coastal condo and co-op buildings three stories or more within three miles of the coastline and built in 1998 or later recertify at 25 years; other buildings built in 1993 or later at 30 years; every building then recertifies every 10 years.
  • Fees from 1 October 2025: $403.13 for the initial structural and electrical review, $453.52 if the reports arrive after 90 days, $143.23 per discipline for a re-review and $169.04 per discipline for a quality control inspection.
  • A missed deadline brings a citation without further notice, an initial penalty of $510, accumulating penalties up to $10,000 per violation and possible referral to the county's Lien Collection Unit.
  • Threshold buildings, including those four stories or taller, are inspected separately by a qualified structural engineer and an electrical engineer, and the structural report carries a self-qualification letter and proof of the engineer's DBPR structural specialization.
  • Parking lot illumination must meet County Code s. 8C-3, and guardrails must meet s. 8C-6 where a parking lot abuts a canal, lake or other body of water. If guardrails are missing, a permit to install them comes first, and both certificates go in the recertification packet.
  • Threshold buildings with structural glazing also need a facade inspection of the glazing adhesive every five years, filed within 90 days of notice with every page signed and sealed. The processing fee is $380.90.
  • The Building Official may extend the deadline by up to 60 days on a written request from the engineer or architect, with a signed and sealed statement that the building may stay occupied. The extension fee is $75.58.
[1]

How we handle building recertification in Miami-Dade County

Recertification here is older than the state law and wider. It applies to offices, warehouses and rental buildings as well as condos, it includes an electrical report, and it has its own fees and penalties. For a condo board it runs alongside the state milestone law, so we plan the two together and keep the 90-day county clock in front of the manager.[1][6]

Aged condominium balconies with hairline cracks and rust stains running down from old railing posts

Permits for building recertification (40-year) in Miami-Dade County

  • Miami-Dade County Building, Recertification: Recertification notices, filings and fees for unincorporated Miami-Dade, and the county code every city follows
  • City building departments (for example City of Miami, Miami Beach): Run recertification and milestone filings inside their own city limits

How is recertification different from a milestone inspection?

The milestone inspection is a state requirement in s. 553.899 for condo and co-op buildings. County recertification is local law that covers most building types, includes an electrical recertification, and has its own schedule, fees and penalties. A condo building in Miami-Dade or Broward may need to satisfy both, so ask the professional how one inspection can serve both programs.[6][1][7]

A 1970s mid-rise condominium beside a 2000s high-rise condominium with royal palms between them

Miami-Dade recertification schedule

Older condominium tower with an aged facade on the shore of Biscayne Bay with small boats in front
  • Buildings built before 1983 keep their established recertification schedule.
  • Coastal condo and co-op buildings 3 stories or more within 3 miles, built 1983 to 1997, and other buildings built 1983 to 1992, were due by 31 December 2024.
  • Coastal condo and co-op buildings built 1998 or later recertify at 25 years.
  • Other buildings built 1993 or later recertify at 30 years.
  • Every 10 years after that.
  • Courtesy notices are sent two years and one year ahead; reports are due within 90 days of the notice.
[1]

Broward Building Safety Inspection Program (Fort Lauderdale)

A 1990s ten-storey beachfront condominium behind sea grape and palms on a coastal road
  • First inspection at 25 years, then every 10 years
  • Notices sent by certified mail from 1 June to 31 August each year
  • Safety report due within 180 days of the notice
  • Repairs within 180 days of the report unless the Building Official sets otherwise
  • Review fee $375
[7]
Building recertification in Miami-Dade County: the local rules at a glance
TopicRule in Miami-Dade CountySource
Local programCounty Code s. 8-11(f) has required recertification since 1975 and covers nearly every building type, not only condos.Miami-Dade County
ElectricalElectrical systems of 400 amperes or more need infrared thermography as part of county recertification.Miami-Dade County
FilingThe county files for unincorporated areas, while cities such as Miami and Miami Beach run their own desks under the same code.Miami-Dade County
RepairsRepairs must be permitted before the county recertifies the building.Miami-Dade County
State data23 of the 24 buildings found unsafe or uninhabitable in Florida in 2025 were in Miami-Dade.OPPAGA 26-04
From the official pages, read 28 October 2026. Confirm dates with the Miami-Dade County Building Department. Sources: Miami-Dade County, Recertification (Miami-Dade County Building); City of Miami, Get a Building Recertification (City of Miami); City of Miami Beach, Building Recertification, City of Miami Beach; Florida Legislature, OPPAGA, Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026. Last updated October 28, 2026.

Frequently asked questions

How is Miami-Dade recertification different from the state milestone inspection?

Recertification is a county program covering most building types, with structural and electrical reports, a 90-day filing window and county fees. The milestone inspection is a state law for condo and co-op buildings three habitable stories or more. A Miami-Dade condo building usually needs both.

Can we get more time?

The engineer can request an extension of up to 60 days for a fee of $75.58.

Does the county help owners pay special assessments?

Miami-Dade has run a Condominium Special Assessment Loan Program for eligible owners. Check the county's housing page for whether an application window is open before relying on it.

Does Miami-Dade County have a 40-year recertification?

Unincorporated Miami-Dade follows County Code s. 8-11(f), a building recertification program in place since 1975 and amended on 1 June 2022. It reaches almost every building type; only single-family homes, duplexes and minor buildings of 2,000 square feet or less with an occupant load of 10 or less are exempt. Whatever the local name, condo and co-op buildings must also meet the state milestone law.

How much warning does Miami-Dade give before recertification is due?

The county sends courtesy notices two years and one year before the due year. Once the Notice of Building Recertification arrives, the reports are due within 90 days.

Sources

  1. Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
  2. Condominium Special Assessment Program Relaunched, Miami-Dade County Housing and Community Development. Accessed October 28, 2026.
  3. Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
  4. Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
  5. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  6. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  7. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.