Electrical recertification and thermography in Miami Beach
The electrical report county recertification requires.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate electrical recertification for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Electrical recertification in Miami Beach is the electrical half of the local program, and we arrange it with the qualified electrical professional the rules call for. Threshold buildings in Miami Beach need a Florida-licensed structural engineer and a Florida-licensed electrical engineer. County guidelines require thermography on electrical systems of 400 amperes or more.
Last updated
Electrical reports in Miami Beach

- Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
- The county guidelines that sit behind the city program require infrared thermography on electrical systems of 400 amperes or more, with photos in the electrical report.
- The city's form set has separate Parking Lot Guardrails and Parking Lot Illumination recertification forms alongside the structural and electrical reports.
- Under County Code s. 8C-6, a parking lot that abuts a canal, lake or other water needs compliant guardrails, and a missing guardrail needs a permit before recertification closes.
How we handle electrical recertification in Miami Beach
Miami Beach recertification is a full packet, not one report. A threshold tower needs both engineers, the parking lot guardrail and illumination forms where there is a lot, and an updated report once repairs pass final inspection. We line up the professionals and the forms together so nothing is missing when the packet goes in through the Citizen Self Service portal.[1]
Permits in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
What the electrical report covers
The professional inspects the building's electrical systems listed in the county's recertification guidelines and reports deficiencies that need repair. Larger systems also get infrared thermography, which uses a thermal camera to spot overheating connections. Ask the engineer which items your building's system size requires.[2][5]

City of Miami filing names
- RC-S: structural report
- RC-E: electrical report
- RC-C and RC-PHO: the further files the city names in its filing guide
| Topic | Rule in Miami Beach | Source |
|---|---|---|
| Local program | Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. | City of Miami Beach |
| Filing | Reports are filed through the city's Citizen Self Service portal or by email. | City of Miami Beach |
| Repairs | After repairs pass final inspection, an updated report goes in before the city issues its approval letter. | City of Miami Beach |
Frequently asked questions
Does Miami Beach require an electrical report or thermography?
Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional. Infrared thermography finds hot connections before they fail, and it gives the reserve study a firmer view of the electrical system.
Is a structural engineer required in Miami Beach?
For threshold buildings, yes, and an electrical engineer as well. Buildings below the threshold may use any Florida-licensed design professional.
Do we need the guardrail form if we have no parking lot?
The guardrail and illumination forms relate to parking lots. The professional preparing your recertification will confirm which forms apply to your building.
Sources
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
