Condo Safety Florida

Electrical recertification and thermography in Miami

The electrical report county recertification requires.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate electrical recertification for condo and co-op associations in Miami, working to the rules of the City of Miami Building Department from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Electrical recertification in Miami is the electrical half of the local program, and we arrange it with the qualified electrical professional the rules call for. The city's filing set includes electrical and thermography reports and, where there is a lot, a parking lot illumination certificate. Electrical systems rated 400 amperes or more get an infrared thermography survey under the county guidelines.

Last updated

Electrical reports in Miami

Brickell and downtown Miami condominium towers along Biscayne Bay
  • The city's filing set includes structural, electrical and thermography reports, plus a parking lot illumination certificate where the building has a parking lot.
  • Under the county guidelines the city follows, electrical systems rated 400 amperes or more get an infrared thermography survey, and photos are now part of the report.
  • For threshold buildings, the county guidelines the city applies call for separate structural and electrical engineers, and the structural engineer shows proof of structural specialization.
  • The city allows one extension, for a $500 fee, and only if it is requested before the due date.
  • The city says to expect a response in about six weeks, and takes questions at buildingrecertifications@miamigov.com or (305) 416-1177.
[1][2]

How we handle electrical recertification in Miami

The City of Miami runs its own recertification desk under the county code, with firm mechanics. File types are named, overdue buildings from 1982 to 1984 cannot file online, there is a single paid extension, and the 60-day permit window opens as soon as the report is in. We assemble the filing set with the engineer so it goes in complete the first time.[1]

Permits in Miami

What the electrical report covers

The professional inspects the building's electrical systems listed in the county's recertification guidelines and reports deficiencies that need repair. Larger systems also get infrared thermography, which uses a thermal camera to spot overheating connections. Ask the engineer which items your building's system size requires.[2][1]

Thermal imaging camera on a tripod showing a hot spot on a breaker in an open condominium electrical panel

City of Miami filing names

  • RC-S: structural report
  • RC-E: electrical report
  • RC-C and RC-PHO: the further files the city names in its filing guide
[1]
Electrical recertification in Miami: the local rules at a glance
TopicRule in MiamiSource
Local programCity of Miami reports go in through iBuild and ProjectDox under set file names such as RC-S and RC-E.City of Miami
Parking lotsGuardrails are required where a lot borders a canal, lake or other water, under County Code s. 8C-6.Miami-Dade County
TimingOverdue buildings built from 1982 to 1984 cannot use the city's online filing route.City of Miami
RepairsAfter a report is filed, the city gives 60 days to obtain repair permits without a violation.City of Miami
State dataMiami-Dade accounted for 23 of Florida's 24 unsafe or uninhabitable findings in 2025.OPPAGA 26-04
From the official pages, read 28 October 2026. Confirm dates with the City of Miami Building Department. Sources: City of Miami, Get a Building Recertification (City of Miami); Miami-Dade County, Recertification (Miami-Dade County Building); Florida Legislature, OPPAGA, Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026. Last updated October 28, 2026.

Frequently asked questions

Does Miami require an electrical report or thermography?

The city's filing set includes structural, electrical and thermography reports, plus a parking lot illumination certificate where the building has a parking lot. Infrared thermography finds hot connections before they fail, and it gives the reserve study a firmer view of the electrical system.

Which electrical and parking items does the City of Miami ask for?

Electrical and thermography reports, and a parking lot illumination certificate where the building has a parking lot.

How long does the City of Miami take to respond?

The city says about six weeks after the report is submitted.

Sources

  1. Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
  2. Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
  3. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  5. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  6. Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.