Condo Safety Florida

SIRS with a milestone inspection in Palm Beach County

One schedule for both, inside the 31 December 2026 outside date.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate a SIRS done with a milestone inspection for condo and co-op associations in Palm Beach County, working to the rules of the Palm Beach County Building Division from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

A SIRS may be completed alongside a milestone inspection due on or before 31 December 2026, so in Palm Beach County the timing of the local milestone notice decides the plan. Unincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30. The county's certified letter arrives in the due year, and the inspection is due within 180 days of it.

Last updated

Lining up the SIRS with the Palm Beach County milestone notice

Condominium towers on the Intracoastal Waterway in Palm Beach County behind a marina and a drawbridge
  • The county sends certified letters to associations in the year the inspection is due, and the inspection must be completed within 180 days of receiving the letter unless a fixed legacy deadline applies.
  • Buildings that reached 25 or 30 years before 1 July 2022 were due by 31 December 2024, and those reaching that age between 1 July 2022 and 31 December 2024 were due by 31 December 2025. Later buildings are due by 31 December of the year they reach the trigger age.
  • Phase 1, Phase 2 and Phase One Amended reports all use Form EB18-2024 and are uploaded through the county's Milestone Inspection Form Submission portal with the building's Reference ID, one building and one report type at a time, and only by the architect or engineer who prepared the report.
  • The county page covers unincorporated Palm Beach County only. Cities with their own building departments, such as Boca Raton, apply their own rules.
  • OPPAGA found that some jurisdictions in Palm Beach County accept one combined Phase 1 and Phase 2 inspection.
[1][2][3]

How we handle a SIRS done with a milestone inspection in Palm Beach County

For associations along the Intracoastal and the beaches of unincorporated Palm Beach County, the county's three-mile line can bring the milestone inspection five years earlier than inland. That earlier inspection can feed the SIRS, because a milestone inspection completed within the previous five years may replace the visual inspection portion of the study.[1][4]

Small survey drone resting on a high-rise condominium roof beside air conditioning units and a cooling tower

Permits in Palm Beach County

How the two duties fit together

The milestone inspection is a structural safety inspection under s. 553.899, performed by a Florida-licensed architect or engineer and filed with the building official. The SIRS is a reserve study under s. 718.112(2)(g) that sets what owners must save. They look at the same building, so doing them together can save time, but they answer different questions and produce different reports.[4][5]

Moisture meter, tablet and tape measure on a condominium roof membrane during a reserve study visual inspection

Reusing a recent milestone inspection

If the milestone inspection, or an inspection for a similar local requirement such as a county recertification, was performed within the past 5 years and meets the SIRS rules, it may be used in place of the visual inspection portion of the SIRS. The financial analysis and funding plan still have to be prepared.[4]

Open equipment case with inspection instruments and a ground penetrating radar cart on a condominium walkway

The 2-year delay and the 2026 outside date

Section 718.112(2)(g)9 lets an association that completes a milestone inspection delay a required SIRS for no more than the 2 consecutive budget years after it. Section 718.112(2)(g)7 says no SIRS may be completed after 31 December 2026. Ask your association attorney how the two apply to your building before relying on the delay.[4]

A SIRS done with a milestone inspection in Palm Beach County: the local rules at a glance
TopicRule in Palm Beach CountySource
First inspectionUnincorporated Palm Beach County inspects buildings within three miles of a coastline at 25 years and others at 30.Palm Beach County
RepairsRepairs must start within 365 days of the county receiving the Phase 2 report.Palm Beach County
Phase 2After repairs the original inspector files a Phase One Amended report on Form EB18-2024.Palm Beach County
ContactThe county answers milestone questions at 561-233-5020.Palm Beach County
From the official pages, read 28 October 2026. Confirm dates with the Palm Beach County Building Division. Source: Palm Beach County, Mandatory Milestone Inspections, Palm Beach County Building Division. Last updated October 28, 2026.

Frequently asked questions

Can our Palm Beach County SIRS be done with the milestone inspection?

The county sends certified letters to associations in the year the inspection is due, and the inspection must be completed within 180 days of receiving the letter unless a fixed legacy deadline applies. No SIRS may be completed after 31 December 2026, whatever the milestone date.

When does the 180 days start in Palm Beach County?

From the county's certified letter, which goes out in the year the inspection is due, unless a fixed legacy deadline applies to your building.

Does the county rule apply in West Palm Beach or Boca Raton?

The county page covers unincorporated Palm Beach County. Cities with their own building departments apply their own rules, so check your city.

Who uploads the report to Palm Beach County?

Only the architect or engineer who prepared it, through the county portal on Form EB18-2024 with the building's Reference ID.

Sources

  1. Mandatory Milestone Inspections, Palm Beach County Building Division, Palm Beach County. Accessed October 28, 2026.
  2. Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
  3. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  4. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  5. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.