SIRS with a milestone inspection in Tampa
One schedule for both, inside the 31 December 2026 outside date.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate a SIRS done with a milestone inspection for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
A SIRS may be completed alongside a milestone inspection due on or before 31 December 2026, so in Tampa the timing of the local milestone notice decides the plan. Phase I is due within 180 days after the owners receive the city's written notice. Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after.
Last updated
Lining up the SIRS with the Tampa milestone notice

- Phase I must be completed within 180 days after the owners receive the city's written notice under s. 5-110.9.8.
- Buildings that should be in the program but have not received a notice are asked to contact CSDLSP@tampagov.net or 813-307-3980, and the city posts its Milestone Inspection Notification Letter.
- The city's program page shows the 30-year trigger only and no 25-year rule for buildings near salt water, so bayfront towers on Bayshore and Harbour Island follow the same 30-year clock as inland buildings unless the city notifies otherwise.
- Reports are filed in Accela Citizen Access, where a registered user applies for an RCT record, and each report must be performed, signed and sealed by a Florida design professional.
How we handle a SIRS done with a milestone inspection in Tampa
Under Tampa's 30-year trigger with no coastal exception, a bayfront condo can reach its first milestone inspection five years later than a similar building under a 25-year program. For the SIRS that cuts both ways. A recent milestone can replace the study's visual portion, but where none exists we arrange the full visual inspection for the reserve study rather than wait.[1][3]

Permits in Tampa
- City of Tampa Construction Services: Milestone notices, RCT filings in Accela and repair permits
How the two duties fit together
The milestone inspection is a structural safety inspection under s. 553.899, performed by a Florida-licensed architect or engineer and filed with the building official. The SIRS is a reserve study under s. 718.112(2)(g) that sets what owners must save. They look at the same building, so doing them together can save time, but they answer different questions and produce different reports.[3][2]

Reusing a recent milestone inspection
If the milestone inspection, or an inspection for a similar local requirement such as a county recertification, was performed within the past 5 years and meets the SIRS rules, it may be used in place of the visual inspection portion of the SIRS. The financial analysis and funding plan still have to be prepared.[3]

The 2-year delay and the 2026 outside date
Section 718.112(2)(g)9 lets an association that completes a milestone inspection delay a required SIRS for no more than the 2 consecutive budget years after it. Section 718.112(2)(g)7 says no SIRS may be completed after 31 December 2026. Ask your association attorney how the two apply to your building before relying on the delay.[3]
| Topic | Rule in Tampa | Source |
|---|---|---|
| First inspection | Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after. | City of Tampa |
| Repairs | Tampa's page sets no repair deadline of its own, so the state 365-day rule governs. | City of Tampa |
| Contact | Tampa Construction Services takes milestone questions at (813) 274-3100, option 1. | City of Tampa |
Frequently asked questions
Can our Tampa SIRS be done with the milestone inspection?
Phase I must be completed within 180 days after the owners receive the city's written notice under s. 5-110.9.8. No SIRS may be completed after 31 December 2026, whatever the milestone date.
We never received a Tampa notice. What should we do?
The city asks buildings that should be in the program but were not notified to contact CSDLSP@tampagov.net or 813-307-3980.
Does Tampa use the 25-year coastal rule?
The city's page shows a 30-year trigger and no 25-year coastal rule.
How do we file a milestone report in Tampa?
Through Accela Citizen Access, where a registered user applies for an RCT record. The report is performed, signed and sealed by a Florida design professional.
Sources
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.