Condo Safety Florida

SIRS study in Tampa

The full structural integrity reserve study, scheduled around your deadline.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate SIRS studies for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

A SIRS for a Tampa condo covers the components s. 718.112(2)(g) lists, from the roof and structure to plumbing, electrical systems, waterproofing and windows, and we arrange it with a qualified professional. Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after. Tampa's program page is structural only and lists no electrical or parking lot report.

Last updated

Who this is for

Boards and managers of condominium buildings three habitable stories or higher that have no study yet, or whose last study is reaching 10 years.

What a SIRS draws on in Tampa

Condominium towers along a bayfront boulevard with a long white balustrade beside Tampa Bay
  • Tampa's program page describes a structural inspection only. It lists no electrical report, thermography, parking lot certificate or balcony form.
[1]

How we handle SIRS studies in Tampa

Under Tampa's 30-year trigger with no coastal exception, a bayfront condo can reach its first milestone inspection five years later than a similar building under a 25-year program. For the SIRS that cuts both ways. A recent milestone can replace the study's visual portion, but where none exists we arrange the full visual inspection for the reserve study rather than wait.[1][3]

Empty pool deck of an oceanfront condominium with the building's balconies and roofline behind

Permits in Tampa

What happens during the study?

Fire pump room of a high-rise condominium with a red fire pump, sprinkler risers and valves
  • The professional reads your declaration to confirm which components the association maintains.
  • A visual inspection of the roof, structure, fire protection, plumbing, electrical, waterproofing and painting, windows and exterior doors, and any other item above the reserve threshold.
  • Estimates of remaining useful life and replacement cost or deferred maintenance for each item.
  • A funding plan, at minimum a baseline plan, and often other schedules for the board to compare.
[3]

What the board needs to provide

Impact-resistant sliding glass doors and windows opening onto a condo balcony above the ocean
  • Declaration, bylaws and any maintenance responsibility chart
  • The last reserve study and current reserve balances by component
  • Any milestone or recertification report from the past 5 years
  • Roof, window and waterproofing warranties and recent repair invoices
  • Access to the roof, mechanical, electrical and fire pump rooms, garages and a sample of units and balconies

How long does it take?

Timing depends on the building and the professional's schedule, so we agree the delivery date in the proposal. Leave time after delivery for the 45-day owner notice and the Division statement, and for the board to adopt a budget that matches the study.

SIRS studies in Tampa: the local rules at a glance
TopicRule in TampaSource
First inspectionTampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after.City of Tampa
NoticePhase I is due within 180 days after the owners receive the city's written notice.City of Tampa
FilingTampa reports are filed in Accela Citizen Access as an RCT record.City of Tampa
NoticeTampa asks buildings that were not notified to contact the city directly.City of Tampa
RepairsTampa's page sets no repair deadline of its own, so the state 365-day rule governs.City of Tampa
ContactTampa Construction Services takes milestone questions at (813) 274-3100, option 1.City of Tampa
From the official pages, read 28 October 2026. Confirm dates with the City of Tampa Construction Services. Sources: City of Tampa, Condo milestone inspections, City of Tampa Construction Services; Florida Legislature, s. 553.899, Florida Statutes, Online Sunshine. Last updated October 28, 2026.

Frequently asked questions

What should we give the reserve professional for a Tampa SIRS?

Tampa's program page describes a structural inspection only. It lists no electrical report, thermography, parking lot certificate or balcony form. The latest inspection reports and repair permits let the study start from what the engineers found.

Does Tampa require an electrical report?

The city's milestone page describes a structural inspection only and lists no electrical report or parking lot certificate.

Does Tampa use the 25-year coastal rule?

The city's page shows a 30-year trigger and no 25-year coastal rule.

Get a free quote

Tell us about your project and we will get back to you fast.