SIRS study in Cape Coral
The full structural integrity reserve study, scheduled around your deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate SIRS studies for condo and co-op associations in Cape Coral, working to the rules of the City of Cape Coral Building Division from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
A SIRS for a Cape Coral condo covers the components s. 718.112(2)(g) lists, from the roof and structure to plumbing, electrical systems, waterproofing and windows, and we arrange it with a qualified professional. Cape Coral says no building in the city is within three miles of the coastline, so the 30-year rule applies everywhere. Buildings with a certificate of occupancy from 1 July 1992 or earlier were due by 31 December 2024.
Last updated
Who this is for
Boards and managers of condominium buildings three habitable stories or higher that have no study yet, or whose last study is reaching 10 years.
What a SIRS draws on in Cape Coral

- Buildings with a certificate of occupancy issued on or before 1 July 1992 had to complete the initial inspection before 31 December 2024.
- The city's condominium inspection FAQ describes the structural milestone inspection only and does not mention electrical reports, thermography or parking lot items.
- The association arranges and pays for the inspections and may hand tasks to a management company, but it remains responsible for compliance.
How we handle SIRS studies in Cape Coral
Under Cape Coral's 30-year rule, a canal-front condo can reach its first milestone inspection after its first SIRS was due. Where a milestone falls within the five years before the study, it can replace the SIRS visual inspection; otherwise we arrange the visual inspection for the reserve professional and plan the next study around the city's notice.[1][2]

Permits in Cape Coral
- City of Cape Coral Building Division: Milestone inspection notices and filings in Cape Coral
What happens during the study?

- The professional reads your declaration to confirm which components the association maintains.
- A visual inspection of the roof, structure, fire protection, plumbing, electrical, waterproofing and painting, windows and exterior doors, and any other item above the reserve threshold.
- Estimates of remaining useful life and replacement cost or deferred maintenance for each item.
- A funding plan, at minimum a baseline plan, and often other schedules for the board to compare.
What the board needs to provide

- Declaration, bylaws and any maintenance responsibility chart
- The last reserve study and current reserve balances by component
- Any milestone or recertification report from the past 5 years
- Roof, window and waterproofing warranties and recent repair invoices
- Access to the roof, mechanical, electrical and fire pump rooms, garages and a sample of units and balconies
How long does it take?
Timing depends on the building and the professional's schedule, so we agree the delivery date in the proposal. Leave time after delivery for the 45-day owner notice and the Division statement, and for the board to adopt a budget that matches the study.
| Topic | Rule in Cape Coral | Source |
|---|---|---|
| First inspection | Cape Coral says no building in the city is within three miles of the coastline, so the 30-year rule applies everywhere. | City of Cape Coral |
| Notice | Cape Coral sends its certified mail notice about 180 days before the due date. | City of Cape Coral |
| Report deadline | The association has 180 days from the notice to complete Phase 1. | City of Cape Coral |
| Repairs | Repairs must begin within 365 days of the Phase 2 report, or the building official decides whether the building is unsafe. | City of Cape Coral |
| Contact | The Cape Coral Building Division takes milestone questions at (239) 574-0401. | City of Cape Coral |
Frequently asked questions
What should we give the reserve professional for a Cape Coral SIRS?
The city's condominium inspection FAQ describes the structural milestone inspection only and does not mention electrical reports, thermography or parking lot items. The latest inspection reports and repair permits let the study start from what the engineers found.
Is Cape Coral on a 25 or 30-year schedule?
30 years. The city states that no building in Cape Coral is within three miles of the coastline, so only the 30-year requirement applies.
Does Cape Coral require an electrical report?
The city's condominium inspection FAQ covers the structural milestone inspection only and does not mention an electrical report.
Sources
- Condominium Inspections FAQ, City of Cape Coral, City of Cape Coral. Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.