SIRS study in Miami Beach
The full structural integrity reserve study, scheduled around your deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate SIRS studies for condo and co-op associations in Miami Beach, working to the rules of the City of Miami Beach Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
A SIRS for a Miami Beach condo covers the components s. 718.112(2)(g) lists, from the roof and structure to plumbing, electrical systems, waterproofing and windows, and we arrange it with a qualified professional. The city refers owners to a mandatory annual maintenance log. Lots that abut a canal, lake or other water need guardrails under County Code s. 8C-6.
Last updated
Who this is for
Boards and managers of condominium buildings three habitable stories or higher that have no study yet, or whose last study is reaching 10 years.
What a SIRS draws on in Miami Beach

- The same page refers owners to a mandatory annual maintenance log, a record that is useful evidence when the reserve study is updated.
- Under County Code s. 8C-6, a parking lot that abuts a canal, lake or other water needs compliant guardrails, and a missing guardrail needs a permit before recertification closes.
- Threshold buildings, meaning more than three stories or 50 feet tall or large assembly buildings, need the structural certification from a Florida-licensed structural engineer and the electrical certification from a Florida-licensed electrical engineer. Smaller buildings may use any Florida-licensed design professional.
- The county code behind the city program puts coastal condo and co-op buildings three stories or more, built from 1998 within three miles of the coast, on a 25-year first recertification. Miami Beach sits on barrier islands between the Atlantic and Biscayne Bay, so confirm on your notice which date the city applied.
- The county guidelines that sit behind the city program require infrared thermography on electrical systems of 400 amperes or more, with photos in the electrical report.
How we handle SIRS studies in Miami Beach
Oceanfront and bayfront associations in Miami Beach can build the SIRS on records the city already expects them to keep. The annual maintenance log, the structural and electrical recertification reports and any updated report after repairs give the reserve professional a history of the building, which makes the useful life estimates firmer.[1][4]

Permits in Miami Beach
- City of Miami Beach Building Department: Recertification and milestone filings, forms and repair permits in Miami Beach
What happens during the study?

- The professional reads your declaration to confirm which components the association maintains.
- A visual inspection of the roof, structure, fire protection, plumbing, electrical, waterproofing and painting, windows and exterior doors, and any other item above the reserve threshold.
- Estimates of remaining useful life and replacement cost or deferred maintenance for each item.
- A funding plan, at minimum a baseline plan, and often other schedules for the board to compare.
What the board needs to provide

- Declaration, bylaws and any maintenance responsibility chart
- The last reserve study and current reserve balances by component
- Any milestone or recertification report from the past 5 years
- Roof, window and waterproofing warranties and recent repair invoices
- Access to the roof, mechanical, electrical and fire pump rooms, garages and a sample of units and balconies
How long does it take?
Timing depends on the building and the professional's schedule, so we agree the delivery date in the proposal. Leave time after delivery for the 45-day owner notice and the Division statement, and for the board to adopt a budget that matches the study.
| Topic | Rule in Miami Beach | Source |
|---|---|---|
| Local program | Miami Beach recertifies at 30 years from the certificate of occupancy and every 10 years after, under the county code. | City of Miami Beach |
| State data | Miami-Dade County, which includes Miami Beach, reported 308 required Phase 2 inspections in 2025. | OPPAGA 26-04 |
| Filing | Reports are filed through the city's Citizen Self Service portal or by email. | City of Miami Beach |
| Repairs | After repairs pass final inspection, an updated report goes in before the city issues its approval letter. | City of Miami Beach |
Frequently asked questions
What should we give the reserve professional for a Miami Beach SIRS?
The same page refers owners to a mandatory annual maintenance log, a record that is useful evidence when the reserve study is updated. The latest inspection reports and repair permits let the study start from what the engineers found.
What is the Miami Beach maintenance log?
The city's recertification page refers owners to a mandatory annual maintenance log. Keep it with the inspection reports; it also helps when the reserve study is updated.
Is Miami Beach on a 25 or 30-year schedule?
The city page states 30 years. The county code it applies sets 25 years for coastal condo and co-op buildings built from 1998, so the date on your notice is the one to follow.
Sources
- Building Recertification, City of Miami Beach, City of Miami Beach. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
