SIRS study in Boca Raton
The full structural integrity reserve study, scheduled around your deadline.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate SIRS studies for condo and co-op associations in Boca Raton, working to the rules of the City of Boca Raton Building Recertification Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
A SIRS for a Boca Raton condo covers the components s. 718.112(2)(g) lists, from the roof and structure to plumbing, electrical systems, waterproofing and windows, and we arrange it with a qualified professional. Railings, guardrails and balcony enclosures are facade items in Boca's inspection. Boca's guidelines add a specific inspection of underground and lower-level garages.
Last updated
Who this is for
Boards and managers of condominium buildings three habitable stories or higher that have no study yet, or whose last study is reaching 10 years.
What a SIRS draws on in Boca Raton

- The guidelines list railings, guardrails and balcony and terrace enclosures among the facade items the engineer examines, and unpermitted balcony enclosures must be identified and legalized before the building can be recertified.
- The guidelines single out underground and lower-level garages, citing low ground elevation, a shallow and rising water table, porous ground and a corrosive coastal environment, and add an inspection of how the garage has been maintained.
- Citing NIST's preliminary findings on Champlain Towers South, the guidelines ask engineers to look closely at deck slabs, plaza decks, columns and transfer members for signs of distress such as efflorescence.
- Covered buildings recertify at 30 years, or at 25 years for condo and co-op properties within three miles of a coastline as defined in s. 376.031; threshold buildings recertify at 30 years.
- Submittals follow the city's Recertification Guidelines, with an Electrical Safety Report Checklist and a Structural Safety Report Checklist alongside the 30 Year Inspection Coversheet.
How we handle SIRS studies in Boca Raton
Boca Raton's checklists ask for separate structural and electrical safety reports, and both systems are SIRS items. When the recertification falls inside the five years before the SIRS, we give the reserve professional both reports and the photos filed with the city, which keeps the study tied to the building's real condition.[2][5]

Permits in Boca Raton
- City of Boca Raton Building Division: Building Recertification Inspection Program notices, schedule and filings
What happens during the study?

- The professional reads your declaration to confirm which components the association maintains.
- A visual inspection of the roof, structure, fire protection, plumbing, electrical, waterproofing and painting, windows and exterior doors, and any other item above the reserve threshold.
- Estimates of remaining useful life and replacement cost or deferred maintenance for each item.
- A funding plan, at minimum a baseline plan, and often other schedules for the board to compare.
What the board needs to provide

- Declaration, bylaws and any maintenance responsibility chart
- The last reserve study and current reserve balances by component
- Any milestone or recertification report from the past 5 years
- Roof, window and waterproofing warranties and recent repair invoices
- Access to the roof, mechanical, electrical and fire pump rooms, garages and a sample of units and balconies
How long does it take?
Timing depends on the building and the professional's schedule, so we agree the delivery date in the proposal. Leave time after delivery for the 45-day owner notice and the Division statement, and for the board to adopt a budget that matches the study.
| Topic | Rule in Boca Raton | Source |
|---|---|---|
| Local program | Boca Raton's recertification program dates from Ordinance 5589 of 24 August 2021, before the state law. | City of Boca Raton |
| Electrical | Boca requires infrared thermography on electrical systems of 400 amperes or more. | Boca Raton guidelines |
| Electrical | Boca's electrical inspection can document site lighting and egress illumination. | Boca Raton guidelines |
| Buildings covered | Boca counts uninhabitable stories such as underground parking when deciding whether a building is covered. | City of Boca Raton |
| State data | Palm Beach County was among the three counties with the most required Phase 2 inspections in 2024. | OPPAGA 26-04 |
| Fees | The city charges $500 per recertification. | City of Boca Raton |
Frequently asked questions
What should we give the reserve professional for a Boca Raton SIRS?
The guidelines list railings, guardrails and balcony and terrace enclosures among the facade items the engineer examines, and unpermitted balcony enclosures must be identified and legalized before the building can be recertified. The latest inspection reports and repair permits let the study start from what the engineers found.
Is Boca Raton on a 25 or 30-year schedule?
Condo and co-op properties within three miles of a coastline recertify at 25 years, others at 30, and threshold buildings at 30.
What reports does Boca Raton want?
Structural and electrical safety reports that follow the city's checklists, with the 30 Year Inspection Coversheet, photos and payment.
Sources
- Recertification Guidelines, Building Recertification Inspection Program, City of Boca Raton. Accessed October 28, 2026.
- Building Recertification Inspection Program, City of Boca Raton, City of Boca Raton. Accessed October 28, 2026.
- Chapter 2022-269, Laws of Florida (SB 4-D), approved May 26 2022, Florida Department of State / Laws of Florida. Accessed October 27, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
