Condo Safety Florida

SIRS with a milestone inspection in Hollywood

One schedule for both, inside the 31 December 2026 outside date.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate a SIRS done with a milestone inspection for condo and co-op associations in Hollywood, working to the rules of the City of Hollywood Building Division from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

A SIRS may be completed alongside a milestone inspection due on or before 31 December 2026, so in Hollywood the timing of the local milestone notice decides the plan. Hollywood inspects buildings at 25 years and every 10 years after, under its 25-Year or Older Building Safety Program. Hollywood's page gives 90 days from the notice to complete the inspection.

Last updated

Lining up the SIRS with the Hollywood milestone notice

Mid-rise and high-rise condominiums along a wide beachfront promenade in Hollywood, Florida
  • The city issues a Notice of Required Inspection, and its page gives the owner 90 days from receiving it to complete the inspection, shorter than the 180 days in BORA's policy text, so work to the date on your notice.
  • After the Surfside collapse the city re-issued certified letters to the properties on its list, set up a Recertification Taskforce and assigned dedicated staff.
  • BORA Policy 05-05, which Hollywood's program follows, counts the Broward safety inspection as compliance with both phases of the state milestone inspection.
[1][2]

How we handle a SIRS done with a milestone inspection in Hollywood

Because the Broward inspection covers electrical systems as well as structure, a recent Hollywood report already speaks to two of the items a SIRS must cover. We send the reserve professional the latest structural and electrical reports and any permits pulled for repairs so the study prices what the engineers found.[1][3]

Small survey drone resting on a high-rise condominium roof beside air conditioning units and a cooling tower

Permits in Hollywood

How the two duties fit together

The milestone inspection is a structural safety inspection under s. 553.899, performed by a Florida-licensed architect or engineer and filed with the building official. The SIRS is a reserve study under s. 718.112(2)(g) that sets what owners must save. They look at the same building, so doing them together can save time, but they answer different questions and produce different reports.[3][4]

Moisture meter, tablet and tape measure on a condominium roof membrane during a reserve study visual inspection

Reusing a recent milestone inspection

If the milestone inspection, or an inspection for a similar local requirement such as a county recertification, was performed within the past 5 years and meets the SIRS rules, it may be used in place of the visual inspection portion of the SIRS. The financial analysis and funding plan still have to be prepared.[3]

Open equipment case with inspection instruments and a ground penetrating radar cart on a condominium walkway

The 2-year delay and the 2026 outside date

Section 718.112(2)(g)9 lets an association that completes a milestone inspection delay a required SIRS for no more than the 2 consecutive budget years after it. Section 718.112(2)(g)7 says no SIRS may be completed after 31 December 2026. Ask your association attorney how the two apply to your building before relying on the delay.[3]

A SIRS done with a milestone inspection in Hollywood: the local rules at a glance
TopicRule in HollywoodSource
First inspectionHollywood inspects buildings at 25 years and every 10 years after, under its 25-Year or Older Building Safety Program.City of Hollywood
RepairsFor conditions that threaten life or safety, permits are due within 180 days of the report.City of Hollywood
FeesHollywood charges a $300 administrative fee to review the reports.City of Hollywood
From the official pages, read 28 October 2026. Confirm dates with the City of Hollywood Building Division. Source: City of Hollywood, Building Safety Inspection Program, City of Hollywood. Last updated October 28, 2026.

Frequently asked questions

Can our Hollywood SIRS be done with the milestone inspection?

The city issues a Notice of Required Inspection, and its page gives the owner 90 days from receiving it to complete the inspection, shorter than the 180 days in BORA's policy text, so work to the date on your notice. No SIRS may be completed after 31 December 2026, whatever the milestone date.

How long do we have after a Hollywood notice?

The city's page gives 90 days from receiving the Notice of Required Inspection to complete the inspection. Follow the date on your notice.

Is it 25 or 40 years in Hollywood?

The program started as Broward's 40-year program in 2005. The city now titles it the 25-Year or Older Building Safety Program and inspects buildings at 25 years and every 10 years after.

Did Hollywood send new letters after Surfside?

Yes. The city says it re-issued certified letters to the properties on its list and set up a Recertification Taskforce.

Sources

  1. Building Safety Inspection Program, City of Hollywood, City of Hollywood. Accessed October 28, 2026.
  2. Broward County Board of Rules and Appeals Policy #05-05, Building Safety Inspection Program (effective 9 August 2024), Broward County Board of Rules and Appeals (copy linked from the City of Fort Lauderdale BSIP page). Accessed October 28, 2026.
  3. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  4. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  5. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.