Reserve funding plan in Miami-Dade County
Turn the study into a budget the board can lawfully adopt.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate reserve funding plans for condo and co-op associations in Miami-Dade County, working to the rules of the Miami-Dade County Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
The SIRS sets the reserve schedule, and Miami-Dade County boards can fund it with regular or special assessments, lines of credit or loans, with a majority of the total voting interests for a special assessment, line of credit or loan. Miami-Dade reported 308 required Phase 2 milestone inspections in 2025, the highest reported count. 23 of the 24 buildings found unsafe or uninhabitable in Florida in 2025 were in Miami-Dade.
Last updated
Paying for reserves and repairs in Miami-Dade County

- In the state's 2025 milestone data, Miami-Dade building officials reported 308 required Phase 2 inspections, the highest count among the counties that reported that year.
- Of the 24 buildings found unsafe or uninhabitable statewide in 2025, 23 were in Miami-Dade, and Aventura alone reported 19.
- The county has run a Condominium Special Assessment Loan Program with loans up to $50,000, at zero percent for 40 years for eligible households earning up to 140 percent of area median income, with priority for owners 62 or older. Its page gives a June application window without a year, so ask the county whether a round is open.
- A missed deadline brings a citation without further notice, an initial penalty of $510, accumulating penalties up to $10,000 per violation and possible referral to the county's Lien Collection Unit.
- Where the reports call for repairs, the county requires the work to go through proper permitting before it will recertify the building.
How we handle reserve funding plans in Miami-Dade County
The county recertification packet already documents the structure, the electrical system, parking lot lighting and, on glazed towers, the facade adhesive. We hand the latest recertification and milestone reports to the reserve professional so the SIRS starts from what the engineers found, which matters in a county that reported 308 required Phase 2 inspections in 2025.[3][1]

Permits in Miami-Dade County
- Miami-Dade County Building, Recertification: Recertification notices, filings and fees for unincorporated Miami-Dade, and the county code every city follows
- City building departments (for example City of Miami, Miami Beach): Run recertification and milestone filings inside their own city limits
What funding options does the law allow?

- Regular assessments set in the annual budget
- Special assessments, with a majority of the total voting interests
- A line of credit or loan, with a majority of the total voting interests, sized to cover any previously waived or unfunded reserves and immediately available to the board
- Pooling, but only of SIRS components with other SIRS components
Can we pause reserves to pay for milestone repairs?
For a budget adopted on or before 31 December 2028, if a milestone inspection was completed in the previous 2 calendar years, owners may approve by a majority of the total voting interests a pause or reduction of reserve contributions for up to two consecutive budgets to fund the milestone repairs. A new SIRS is required before contributions resume. The option does not apply to developer-controlled associations or associations controlled by owners for less than a year.[4]

What if the building is uninhabitable after a disaster?
If the local building official decides the whole building is uninhabitable because of a natural emergency, the board may pause or reduce reserve funding until the building is habitable again, and may spend reserves to make it habitable.[4]
| Topic | Rule in Miami-Dade County | Source |
|---|---|---|
| First inspection | Coastal condo and co-op buildings built in 1998 or later recertify at 25 years, other buildings built from 1993 at 30, then every 10 years. | Miami-Dade County |
| First inspection | County Code s. 8-11(f) has required recertification since 1975 and covers nearly every building type, not only condos. | Miami-Dade County |
| Coastal rule | The county maps which condo buildings sit within three miles of the coast through a GIS project. | Miami-Dade County |
| Fees | The county's initial recertification review fee is $403.13, and a late submission costs $453.52. | Miami-Dade County |
| Extensions | An extension of up to 60 days costs $75.58 and needs a sealed occupancy statement from the engineer or architect. | Miami-Dade County |
| Phase 2 | Some Miami-Dade jurisdictions accept a combined Phase 1 and Phase 2 inspection. | OPPAGA 26-04 |
Frequently asked questions
Is there local help with assessments or repair costs in Miami-Dade County?
The county has run a Condominium Special Assessment Loan Program with loans up to $50,000, at zero percent for 40 years for eligible households earning up to 140 percent of area median income, with priority for owners 62 or older. Its page gives a June application window without a year, so ask the county whether a round is open. State law lets associations fund reserves through regular or special assessments, lines of credit or loans.
How often do Miami-Dade milestone inspections lead to Phase 2?
Miami-Dade building officials reported 308 required Phase 2 inspections in 2025, the highest count among the counties that reported that year.
What are the penalties in Miami-Dade?
The county issues a citation without further notice, with an initial penalty of $510, penalties that can accumulate up to $10,000 per violation, and a possible lien.
Sources
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- Condominium Special Assessment Program Relaunched, Miami-Dade County Housing and Community Development. Accessed October 28, 2026.
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
- Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.
