Turn the study into a budget the board can lawfully adopt.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate reserve funding plans for condo and co-op associations in Orlando, working to the rules of the City of Orlando Building Official from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

The SIRS sets the reserve schedule, and Orlando boards can fund it with regular or special assessments, lines of credit or loans, with a majority of the total voting interests for a special assessment, line of credit or loan. Orange County had 1 unsafe or uninhabitable finding in 2025, and Osceola had 10 in 2024. Orlando gives 365 days after submitting to pull a repair permit.

Last updated

Paying for reserves and repairs in Orlando

Condominium towers around a downtown Orlando lake with a fountain and oak trees
  • In the state's data, Orange County had 1 building found unsafe or uninhabitable in 2025, and neighboring Osceola County had 10 in 2024, the most of any county that year.
  • After submitting, the association has 365 days to pull a repair permit.
  • For noncompliance, the city says proceedings may be initiated as authorized by law.
  • If Phase One is disapproved for findings, the Phase Two form is emailed to buildingofficial@orlando.gov, and Phase Two is due within 180 days under s. 553.899(7)(b).
  • The city page lists 30-year deadlines in its steps but says 25 or 30 years in its FAQ, so confirm with the building official which trigger applies before relying on either.
[1][2]

How we handle reserve funding plans in Orlando

Orlando confirms its milestone rule reaches condos inside apartment communities. Where one association holds several three-story buildings, each has its own roof, structure and systems to reserve for, so we arrange the SIRS visual inspection building by building and align it with each milestone letter.[2][3]

Balcony table with a closed laptop, reading glasses, coffee and a stapled booklet at sunrise over the ocean

Permits in Orlando

What funding options does the law allow?

Condominium meeting room table with closed binders, a calculator, pens and rolled building drawings
  • Regular assessments set in the annual budget
  • Special assessments, with a majority of the total voting interests
  • A line of credit or loan, with a majority of the total voting interests, sized to cover any previously waived or unfunded reserves and immediately available to the board
  • Pooling, but only of SIRS components with other SIRS components
[3]

Can we pause reserves to pay for milestone repairs?

For a budget adopted on or before 31 December 2028, if a milestone inspection was completed in the previous 2 calendar years, owners may approve by a majority of the total voting interests a pause or reduction of reserve contributions for up to two consecutive budgets to fund the milestone repairs. A new SIRS is required before contributions resume. The option does not apply to developer-controlled associations or associations controlled by owners for less than a year.[3]

Drained condominium pool fenced off with orange safety netting, covered lounge chairs and an empty work platform on the tower

What if the building is uninhabitable after a disaster?

If the local building official decides the whole building is uninhabitable because of a natural emergency, the board may pause or reduce reserve funding until the building is habitable again, and may spend reserves to make it habitable.[3]

Reserve funding plans in Orlando: the local rules at a glance
TopicRule in OrlandoSource
Coastal ruleOrlando's page has no coastal or salt water rule.City of Orlando
NoticeInspections are due within 180 days of the city's certified letter.City of Orlando
FilingPhase One reports go in through Orlando's online form, with a response within one business day.City of Orlando
ContactOrlando takes milestone questions at 407.246.3443.City of Orlando
From the official pages, read 28 October 2026. Confirm dates with the City of Orlando Building Official. Source: City of Orlando, Complete Your Milestone Inspection, City of Orlando. Last updated October 28, 2026.

Frequently asked questions

Is there local help with assessments or repair costs in Orlando?

In the state's data, Orange County had 1 building found unsafe or uninhabitable in 2025, and neighboring Osceola County had 10 in 2024, the most of any county that year. State law lets associations fund reserves through regular or special assessments, lines of credit or loans.

How long do we have to pull a repair permit in Orlando?

365 days after submitting, according to the city's milestone page.

Is Orlando 25 or 30 years?

The city page shows 30-year deadlines in one place and 25 or 30 years in another. Confirm with the building official before relying on either.

Sources

  1. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  2. Complete Your Milestone Inspection, City of Orlando, City of Orlando. Accessed October 28, 2026.
  3. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
  4. Inspections: DBPR Condominium Information and Resources, Florida DBPR, Division of Florida Condominiums, Timeshares, and Mobile Homes. Accessed October 28, 2026.