Condo Safety Florida

Post-tensioned slab repair

Specialist assessment before anyone cuts into a tensioned slab.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange an engineer experienced with post-tensioned structures and a contractor qualified for tendon repair, with shoring planned before work starts.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Many Florida condo floors and garage decks are post-tensioned: steel tendons inside the slab are tensioned to hold it in compression. Cutting or coring one without knowing where the tendons run can be dangerous, so repairs and any Phase 2 testing are directed by the engineer, who must prefer test locations that are least disruptive and still representative of the structure (s. 553.899(7)(b), Florida Statutes).

Last updated

Who this is for

Associations whose milestone or engineer's report mentions post-tensioning, tendon corrosion or slab deflection, and buildings with post-tensioned garage decks.

Signs the engineer will look at

Post-tensioned slab edge opened in a condo garage showing a tendon anchor and strand, with a replacement anchor and wedges beside it
  • Rust staining or efflorescence along a line on the slab underside
  • Cracking or deflection in post-tensioned slabs and beams
  • Corroded tendon anchors at slab edges
  • Water leaking through garage decks onto tendons

How repairs are approached

The engineer locates tendons before any cutting, decides whether tendons need to be repaired or replaced, and specifies shoring. Work is done by contractors experienced with post-tensioned systems, under a building permit.

Frequently asked questions

How do we know if our building is post-tensioned?

The original structural drawings will say. If you do not have them, the engineer can tell from the structure and may scan the slab before testing.

Is post-tensioned slab repair part of the milestone inspection?

The inspection identifies deterioration and recommends repairs. The repairs themselves are a separate project, which must commence within 365 days of a Phase 2 report.

Sources

  1. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
  2. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  3. Building Safety Inspection Program, City of Fort Lauderdale, City of Fort Lauderdale. Accessed October 28, 2026.
  4. Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
  5. s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.