Condo Safety Florida

Post-tensioned slab repair in Orlando

Specialist assessment before anyone cuts into a tensioned slab.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate post-tensioned slab repairs for condo and co-op associations in Orlando, working to the rules of the City of Orlando Building Official from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Post-tensioned slabs need a repair engineer who understands stressed tendons, and in Orlando the work runs on the local permit and repair windows below. Orange County had 1 unsafe or uninhabitable finding in 2025, and Osceola had 10 in 2024. Orlando gives 365 days after submitting to pull a repair permit.

Last updated

Who this is for

Associations whose milestone or engineer's report mentions post-tensioning, tendon corrosion or slab deflection, and buildings with post-tensioned garage decks.

Post-tensioned slabs and the Orlando rules

Condominium towers around a downtown Orlando lake with a fountain and oak trees
  • In the state's data, Orange County had 1 building found unsafe or uninhabitable in 2025, and neighboring Osceola County had 10 in 2024, the most of any county that year.
  • After submitting, the association has 365 days to pull a repair permit.
[1][2]

How we handle post-tensioned slab repairs in Orlando

Orlando gives 365 days after submitting the milestone report to pull a repair permit, a longer runway than several South Florida programs. We use it to get competitive repair bids against the engineer's scope, while keeping the state rule in view that repairs for substantial structural deterioration must start within 365 days of the Phase 2 report.[2][3]

Open parking garage under a condominium with repaired concrete columns and yellow temporary shoring posts

Permits in Orlando

Signs the engineer will look at

Post-tensioned slab edge opened in a condo garage showing a tendon anchor and strand, with a replacement anchor and wedges beside it
  • Rust staining or efflorescence along a line on the slab underside
  • Cracking or deflection in post-tensioned slabs and beams
  • Corroded tendon anchors at slab edges
  • Water leaking through garage decks onto tendons

How repairs are approached

The engineer locates tendons before any cutting, decides whether tendons need to be repaired or replaced, and specifies shoring. Work is done by contractors experienced with post-tensioned systems, under a building permit.

Post-tensioned slab repairs in Orlando: the local rules at a glance
TopicRule in OrlandoSource
Buildings coveredOrlando's rule covers condo buildings three stories or taller, including condos inside apartment communities.City of Orlando
NoticeInspections are due within 180 days of the city's certified letter.City of Orlando
FilingPhase One reports go in through Orlando's online form, with a response within one business day.City of Orlando
ContactOrlando takes milestone questions at 407.246.3443.City of Orlando
From the official pages, read 28 October 2026. Confirm dates with the City of Orlando Building Official. Source: City of Orlando, Complete Your Milestone Inspection, City of Orlando. Last updated October 28, 2026.

Frequently asked questions

Do parking levels count under the Orlando rules?

Orlando applies the milestone law to condo and co-op buildings three stories or taller, including condos within an apartment community; one, two and three-family dwellings of three habitable stories or fewer are exempt. Never cut or core a post-tensioned slab without the engineer locating the tendons first.

How long do we have to pull a repair permit in Orlando?

365 days after submitting, according to the city's milestone page.

Our condo units are in a former apartment complex. Do we need a milestone inspection in Orlando?

Orlando's page says the requirement includes condos within an apartment community, as long as the building is three stories or taller.

Sources

  1. Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
  2. Complete Your Milestone Inspection, City of Orlando, City of Orlando. Accessed October 28, 2026.
  3. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.