Condo Safety Florida

Post-tensioned slab repair in Tampa

Specialist assessment before anyone cuts into a tensioned slab.

Get Your Free Proposal

Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.

Your building department decides if salt water means a 25-year inspection.

We arrange and coordinate post-tensioned slab repairs for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.

  • Free, no-obligation proposal
  • Inspections by Florida-licensed engineers and architects
  • Milestone, SIRS and recertification deadlines

The short answer

Post-tensioned slabs need a repair engineer who understands stressed tendons, and in Tampa the work runs on the local permit and repair windows below. Tampa's page sets no repair deadline of its own, so the state 365-day rule governs. Tampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after.

Last updated

Who this is for

Associations whose milestone or engineer's report mentions post-tensioning, tendon corrosion or slab deflection, and buildings with post-tensioned garage decks.

Post-tensioned slabs and the Tampa rules

Condominium towers along a bayfront boulevard with a long white balustrade beside Tampa Bay
  • The city's page sets inspection deadlines but no repair deadline of its own, so the state rule applies, under which repairs for substantial structural deterioration must start within 365 days of the Phase II report.
  • Reports are filed in Accela Citizen Access, where a registered user applies for an RCT record, and each report must be performed, signed and sealed by a Florida design professional.
[1][2]

How we handle post-tensioned slab repairs in Tampa

Tampa leaves the repair clock to the statute, 365 days from the Phase II report to start repairs for substantial structural deterioration. The Phase II report is where the engineer specifies the repairs, so we start pricing the scope with contractors as soon as it is filed and plan the permit application around the 365-day date.[1][2]

Open parking garage under a condominium with repaired concrete columns and yellow temporary shoring posts

Permits in Tampa

Signs the engineer will look at

Post-tensioned slab edge opened in a condo garage showing a tendon anchor and strand, with a replacement anchor and wedges beside it
  • Rust staining or efflorescence along a line on the slab underside
  • Cracking or deflection in post-tensioned slabs and beams
  • Corroded tendon anchors at slab edges
  • Water leaking through garage decks onto tendons

How repairs are approached

The engineer locates tendons before any cutting, decides whether tendons need to be repaired or replaced, and specifies shoring. Work is done by contractors experienced with post-tensioned systems, under a building permit.

Post-tensioned slab repairs in Tampa: the local rules at a glance
TopicRule in TampaSource
Buildings coveredTampa requires milestone inspections under City Code s. 5-110.9 at 30 years and every 10 years after.City of Tampa
NoticePhase I is due within 180 days after the owners receive the city's written notice.City of Tampa
NoticeTampa asks buildings that were not notified to contact the city directly.City of Tampa
ContactTampa Construction Services takes milestone questions at (813) 274-3100, option 1.City of Tampa
From the official pages, read 28 October 2026. Confirm dates with the City of Tampa Construction Services. Source: City of Tampa, Condo milestone inspections, City of Tampa Construction Services. Last updated October 28, 2026.

Frequently asked questions

Do parking levels count under the Tampa rules?

Tampa runs milestone inspections under City Code s. 5-110.9, Mandatory Structural Inspections for Condominium and Cooperative Buildings, for association buildings three stories or more. The first inspection is due at 30 years from the certificate of occupancy and then every 10 years. Never cut or core a post-tensioned slab without the engineer locating the tendons first.

Does Tampa set a repair deadline?

The city's page does not. The state rule applies, so repairs for substantial structural deterioration must start within 365 days of the Phase II report.

Does Tampa use the 25-year coastal rule?

The city's page shows a 30-year trigger and no 25-year coastal rule.

Sources

  1. Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
  2. s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.

Get a free quote

Tell us about your project and we will get back to you fast.