Concrete spalling repair in Tampa
Fix the cause, not just the patch.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate spalling repairs for condo and co-op associations in Tampa, working to the rules of the City of Tampa Construction Services from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Concrete is among the most common Phase 2 repairs Florida building officials report, and in Tampa spalling repairs run on the local rules below. Tampa's page shows a 30-year trigger and no 25-year coastal rule, even for bayfront buildings. Tampa's page sets no repair deadline of its own, so the state 365-day rule governs.
Last updated
Who this is for
Boards and managers seeing loose concrete, rust stains or exposed steel on balconies, columns, beams, garages or walkways.
Spalling repairs and the Tampa deadlines

- The city's program page shows the 30-year trigger only and no 25-year rule for buildings near salt water, so bayfront towers on Bayshore and Harbour Island follow the same 30-year clock as inland buildings unless the city notifies otherwise.
- The city's page sets inspection deadlines but no repair deadline of its own, so the state rule applies, under which repairs for substantial structural deterioration must start within 365 days of the Phase II report.
How we handle spalling repairs in Tampa
Tampa leaves the repair clock to the statute, 365 days from the Phase II report to start repairs for substantial structural deterioration. The Phase II report is where the engineer specifies the repairs, so we start pricing the scope with contractors as soon as it is filed and plan the permit application around the 365-day date.[1][2]

Permits in Tampa
- City of Tampa Construction Services: Milestone notices, RCT filings in Accela and repair permits
When is spalling structural?
The statute excludes surface imperfections such as cracks, distortion, sagging, deflection, leaks and peeling finishes from substantial structural deterioration unless the licensed engineer or architect performing the inspection decides they are a sign of it. That professional judgment decides whether Phase 2 testing is required.[2]

What a proper spalling repair involves

- Sounding the area to find delaminated concrete beyond what is visibly broken
- Removing concrete behind the steel so new material can bond around it
- Cleaning, treating or replacing corroded reinforcing steel as the engineer specifies
- Repair mortar or concrete, then coatings or sealants to slow water and salt getting back in
What to do while you wait for repairs
If pieces are falling, tell the engineer and keep people away from the area below. The engineer may recommend netting, barricades or shoring until the repair is done.
| Topic | Rule in Tampa | Source |
|---|---|---|
| Notice | Phase I is due within 180 days after the owners receive the city's written notice. | City of Tampa |
| Filing | Tampa reports are filed in Accela Citizen Access as an RCT record. | City of Tampa |
| Notice | Tampa asks buildings that were not notified to contact the city directly. | City of Tampa |
| Contact | Tampa Construction Services takes milestone questions at (813) 274-3100, option 1. | City of Tampa |
Frequently asked questions
Does salt air change the inspection schedule in Tampa?
The city's program page shows the 30-year trigger only and no 25-year rule for buildings near salt water, so bayfront towers on Bayshore and Harbour Island follow the same 30-year clock as inland buildings unless the city notifies otherwise. Spalling starts when moisture and chlorides reach the steel, so early repair keeps the scope small.
Does Tampa use the 25-year coastal rule?
The city's page shows a 30-year trigger and no 25-year coastal rule.
Does Tampa set a repair deadline?
The city's page does not. The state rule applies, so repairs for substantial structural deterioration must start within 365 days of the Phase II report.
Sources
- Condo milestone inspections, City of Tampa Construction Services, City of Tampa. Accessed October 28, 2026.
- s. 553.899, Florida Statutes, Online Sunshine, Florida Legislature. Accessed October 28, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.