Keep water out of the concrete, and budget for it in your SIRS.
Get Your Free Proposal
Tell us about your building and any notice or deadline you have. We will respond right away with next steps and a proposal.
We arrange and coordinate waterproofing and sealants for condo and co-op associations in Miami, working to the rules of the City of Miami Building Department from the first notice to the final report.
- Free, no-obligation proposal
- Inspections by Florida-licensed engineers and architects
- Milestone, SIRS and recertification deadlines
The short answer
Waterproofing and sealants keep water and salt out of Miami concrete, and the SIRS treats waterproofing and exterior painting as a reserve item. Under the county schedule the city applies, coastal condos built from 1998 are due at 25 years and most other buildings from 1993 at 30. After a report is filed, the city gives 60 days to obtain repair permits without a violation.
Last updated
Waterproofing work in Miami

- Because the city applies Miami-Dade's Code s. 8-11(f), the county's age rules decide the due year. Coastal condo and co-op buildings built from 1998 within three miles of the coast come due at 25 years, and most other buildings built from 1993 at 30.
- Once a report is filed, the owner has 60 days to obtain the repair permits it calls for without a violation being issued.
- County Code s. 8C-6 guardrails apply where a parking lot borders a canal, lake or other body of water, so bayfront and riverfront lots should check this item early; missing guardrails need a permit before the packet can close.
- In 2025 Miami-Dade accounted for 23 of the 24 buildings in Florida found unsafe or uninhabitable after milestone inspections.
How we handle waterproofing and sealants in Miami
Repairs that a City of Miami recertification or milestone report calls for start a short clock of 60 days to obtain permits without a violation. That is little time to choose a contractor, so we start the repair scope and bidding while the engineer finishes the report and have the permit set ready for the filing date.[2]

Permits in Miami
- City of Miami Building Department, Unsafe Structures Services: Recertification and milestone filings, extensions and repair permits inside city limits
Where waterproofing matters most

- Balcony and walkway traffic coatings
- Sealant at windows, doors, railing posts and expansion joints
- Garage deck membranes and drains
- Facade coatings and painting
- Roof membranes, which are a separate SIRS item
Planning it with restoration
Waterproofing is usually cheapest done straight after concrete repairs, while scaffolds and swing stages are already up. Ask the engineer to include coating and sealant specifications in the repair documents.

| Topic | Rule in Miami | Source |
|---|---|---|
| Filing | City of Miami reports go in through iBuild and ProjectDox under set file names such as RC-S and RC-E. | City of Miami |
| Timing | Overdue buildings built from 1982 to 1984 cannot use the city's online filing route. | City of Miami |
| Extensions | The city grants a single $500 extension, and only when it is requested before the due date. | City of Miami |
| Report deadline | The city says a response takes about six weeks. | City of Miami |
Frequently asked questions
Does waterproofing belong in the reserve plan in Miami?
Because the city applies Miami-Dade's Code s. 8-11(f), the county's age rules decide the due year. Coastal condo and co-op buildings built from 1998 within three miles of the coast come due at 25 years, and most other buildings built from 1993 at 30. Waterproofing and exterior painting are SIRS items under s. 718.112(2)(g), so the work belongs in the reserve schedule.
How long do we have to pull repair permits in Miami?
The city gives 60 days after the report is filed to obtain the repair permits without a violation.
Do we file with Miami-Dade County or the City of Miami?
Buildings inside City of Miami limits file with the city through iBuild and ProjectDox. The county handles unincorporated Miami-Dade.
Sources
- Recertification (Miami-Dade County Building), Miami-Dade County. Accessed October 28, 2026.
- Get a Building Recertification (City of Miami), City of Miami. Accessed October 27, 2026.
- Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026, Florida Legislature, OPPAGA. Accessed October 27, 2026.
- s. 718.112, Florida Statutes (2026): Bylaws, including (2)(f) budget and reserves, (2)(g) SIRS, (2)(h) milestone inspections, The Florida Senate. Accessed October 28, 2026.
Get a free quote
Tell us about your project and we will get back to you fast.